ID badges: Hide | Show

Amendment of paragraph P of Part 14 (interpretation of Part 14)

6.  In Part 14 (renewable energy), in paragraph P (interpretation of Part 14), in the definition of “MCS Planning Standards”—

(a)for “(being MCS 007)” substitute “(being MCS 020 a) - Air Source Heat Pump Sound Calculation (For Permitted Development Installations))”(1);

(b)for “(being MCS 006)” substitute “(being MCS 020 b) - Wind Turbine Sound Calculation (For Permitted Development Installations))”(2).

(1)

Issue 1.1 dated 14th April 2025. An electronic copy can be found at: https://mcscertified.com/wp-content/uploads/2025/04/MCS-020-a-Issue-1.1-Final.pdf. A copy of the MCS Planning Standards may be inspected at the Department of Energy Security and Net Zero, 55 Whitehall, London SW1A 2HP.

(2)

Issue 1.0 dated 20th March 2025. An electronic copy can be found at: https://mcscertified.com/wp-content/uploads/2025/03/MCS-020-b-Issue-1.0-Final.pdf. A copy of the MCS Planning Standards may be inspected at the Department of Energy Security and Net Zero, 55 Whitehall, London SW1A 2HP.