A nationally significant infrastructure project as defined in sections 14 and 21 of the 2008 Act, comprising—
Work No.01 – Construction of AGI at the Immingham facility comprising equipment for the control of the authorised development, within the location shown on Sheet 1 of the Works Plan, including:
(a)a fenced compound area containing;
(i)security lighting;
(ii)parking;
(iii)cathodic protection measures (including grounded);
(iv)CCTV cameras, intrusion detection systems and access control systems;
(v)PIG launcher and receiver facilities (including a projectile blast wall);
(vi)local equipment room;
(vii)control mechanisms and electrical and instrumentation kiosk;
(viii)venting system including vent pipework, valves and vent stack;
(ix)analyser house; and
(x)supporting utilities;
(b)above ground control boxes;
(c)above/below ground pipework and isolation valves;
(d)below ground cables and cable ducts;
(e)hard standing;
(f)drainage works, including creation of connections to existing drainage system; and
(g)landscaping.
Work No.02 – Construction of a 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.1km length between Work No. 1 and Work No. 3 including:
(a)construction and installation of the pipeline by trenched and trenchless methods, including pipeline installation in existing crossing sleeve, on existing pipe racks, trenchless installation technique pit works, the creation of reception pits, and launch pits, and installation of concrete-lined sleeve tunnels;
(b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c)installation of buried fibre optic cables for transfer of electronic communications;
(d)construction of a haul road, temporary construction accesses and working areas and laydown area;
(e)reinstatement, ecological and environmental works; and
(f)drainage works including creation of connections to existing drainage system
as shown on Sheet 1 of the Works Plan.
Work No.03 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.2km length between Work No.1 and Work No.4 including:
(a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c)installation of buried fibre optic cables for transfer of electronic communications;
(d)construction of a haul road, temporary construction accesses and working areas and laydown area;
(e)reinstatement, ecological and environmental works; and
(f)drainage works including creation of connections to existing drainage system
as shown on Sheets 1 and 2 of the Works Plan.
Work No.04 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1km length between Work No. 3 and Work No. 5 including:
(a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c)installation of buried fibre optic cables for transfer of electronic communications;
(d)construction of a haul road, temporary construction accesses and working areas and laydown area;
(e)reinstatement, ecological and environmental works; and
(f)drainage works including creation of connections to existing drainage system
as shown on Sheet 2 of the Works Plan.
Work No.05 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 300 metres length between Work No. 2, Work No. 4, and Work No. 6 including:
(a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c)installation of buried fibre optic cables for transfer of electronic communications;
(d)construction of a haul road, temporary construction accesses and working areas and laydown area;
(e)reinstatement, ecological and environmental works; and
(f)drainage works including creation of connections to existing drainage system
as shown on Sheet 2 of the Works Plan.
Work No.06 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.4km length between Work No. 5 and Work No. 8 including:
(a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c)installation of underground fibre optic cables for transfer of electronic communications;
(d)construction of a haul road, temporary construction accesses and working areas and laydown area;
(e)reinstatement, ecological and environmental works; and
(f)drainage works including creation of connections to existing drainage system
as shown on Sheet 3 of the Works Plan.
Work No.07 – The creation and use of a temporary logistics and construction compound (North Construction Compound) for the use during the construction of the authorised development, within the location shown on Sheet 4 of the Works Plan, including:
(a)temporary office, welfare and security facilities;
(b)a parking area;
(c)power supplies and lighting;
(d)pipe equipment and fittings storage;
(e)plant storage;
(f)a fabrication area;
(g)workshop/repair facility;
(h)a plant wheel wash area;
(i)waste management areas; and
(j)fencing and gating.
Work No.08 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.8km length between Work No. 6 and Work No. 9 including:
(a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c)installation of underground fibre optic cables for transfer of electronic communications;
(d)construction of a haul road, temporary construction accesses and working areas and laydown area;
(e)reinstatement, ecological and environmental works; and
(f)drainage works including creation of connections to existing drainage system
as shown on Sheet 5 of the Works Plan.
Work No.09 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.7km length between Work No. 8 and Work No. 10 including:
(a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c)installation of underground fibre optic cables for transfer of electronic communications;
(d)construction of a haul road, temporary construction accesses and working areas and laydown area;
(e)reinstatement, ecological and environmental works; and
(f)drainage works including creation of connections to existing drainage system
as shown on Sheet 6 of the Works Plan.
Work No.10 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.5km length between Work No. 9 and Work No. 11 including:
(a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c)installation of underground fibre optic cables for transfer of electronic communications;
(d)construction of a haul road, temporary construction accesses and working areas and laydown area;
(e)reinstatement, ecological and environmental works; and
(f)drainage works including creation of connections to existing drainage system
as shown on Sheet 7 of the Works Plan.
Work No.11 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.6km length between Work No. 10 and Work No. 12 including:
(a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c)installation of underground fibre optic cables for transfer of electronic communications;
(d)construction of a haul road, temporary construction accesses and working areas and laydown area;
(e)reinstatement, ecological and environmental works; and
(f)drainage works including creation of connections to existing drainage system
as shown on Sheet 8 of the Works Plan.
Work No.12 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.4km length between Work No. 11 and Work No. 13 including:
(a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c)installation of underground fibre optic cables for transfer of electronic communications;
(d)construction of a haul road, temporary construction accesses and working areas and laydown area;
(e)reinstatement, ecological and environmental works; and
(f)drainage works including creation of connections to existing drainage system
as shown on Sheet 9 of the Works Plan.
Work No.13 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.6km length between Work No. 12 and Work No. 14 including:
(a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c)installation of underground fibre optic cables for transfer of electronic communications;
(d)construction of a haul road, temporary construction accesses and working areas and laydown area;
(e)reinstatement, ecological and environmental works; and
(f)drainage works including creation of connections to existing drainage system
as shown on Sheet 10 of the Works Plan.
Work No.14 – Construction of a BVS at Washingdales Lane, within the location shown on Sheet 10 of the Works Plan, including:
(a)a fenced compound area containing:
(i)security lighting and CCTV cameras;
(ii)block valve;
(iii)parking area;
(iv)cathodic protection measures;
(v)instrumentation and control kiosk; and
(vi)vent stack;
(b)below ground pipework;
(c)above ground control boxes;
(d)hard standing;
(e)soakaway type drainage system;
(f)landscaping;
and the following temporary requirements during construction activities:
(g)welfare and security facilities;
(h)parking area;
(i)plant and materials storage area; and
(j)temporary waste management facility.
Work No.15 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 2.0km length between Work No. 13 and Work No. 16 including:
(a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c)installation of underground fibre optic cables for transfer of electronic communications;
(d)construction of a haul road, temporary construction accesses and working areas and laydown area;
(e)reinstatement, ecological and environmental works; and
(f)drainage works including creation of connections to existing drainage system
as shown on Sheet 11 of the Works Plan.
Work No.16 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.9km length between Work No. 15 and Work No. 17 including:
(a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c)installation of underground fibre optic cables for transfer of electronic communications;
(d)construction of a haul road, temporary construction accesses and working areas and laydown area;
(e)reinstatement, ecological and environmental works; and
(f)drainage works including creation of connections to existing drainage system
as shown on Sheet 12 of the Works Plan.
Work No.17 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.7km length between Work No. 16 and Work No. 18 including:
(a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c)installation of underground fibre optic cables for transfer of electronic communications;
(d)construction of a haul road, temporary construction accesses and working areas and laydown area;
(e)reinstatement, ecological and environmental works; and
(f)drainage works including creation of connections to existing drainage system
as shown on Sheet 13 of the Works Plan.
Work No.18 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.7km length between Work No. 17 and Work No. 19 including:
(a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c)installation of underground fibre optic cables for transfer of electronic communications;
(d)construction of a haul road, temporary construction accesses and working areas and laydown area;
(e)reinstatement, ecological and environmental works; and
(f)drainage works including creation of connections to existing drainage systems
as shown on Sheet 14 of the Works Plan.
Work No.19 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.6km length between Work No. 18 and Work No. 20 including:
(a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c)installation of underground fibre optic cables for transfer of electronic communications;
(d)construction of a haul road, temporary construction accesses and working areas and laydown area;
(e)reinstatement, ecological and environmental works; and
(f)drainage works including creation of connections to existing drainage system
as shown on Sheet 15 of the Works Plan.
Work No.20 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.6km length between Work No. 19 and Work No. 21 including:
(a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c)installation of underground fibre optic cables for transfer of electronic communications;
(d)construction of a haul road, temporary construction accesses and working areas and laydown area;
(e)reinstatement, ecological and environmental works; and
(f)drainage works including creation of connections to existing drainage system
as shown on Sheet 16 of the Works Plan.
Work No.21 – Construction of a BVS at Thoroughfare Road within the location shown on Sheet 16 of the Works Plan, including:
(a)a fenced compound area containing:
(i)security lighting and CCTV cameras;
(ii)block valve;
(iii)parking area;
(iv)cathodic protection measures
(v)instrumentation and control kiosk;
(vi)vent stack.
(b)below ground pipework;
(c)above ground control boxes;
(d)hard standing;
(e)soakaway type drainage system;
(f)landscaping;
and the following temporary requirements during construction activities:
(g)welfare and security facilities;
(h)parking area;
(i)plant and materials storage area; and
(j)temporary waste management facility.
Work No.22 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.6km length between Work No. 21 and Work No. 23 including:
(a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c)installation of underground fibre optic cables for transfer of electronic communications;
(d)construction of a haul road, temporary construction accesses and working areas and laydown area;
(e)reinstatement, ecological and environmental works; and
(f)drainage works including creation of connections to existing drainage system
as shown on Sheet 17 of the Works Plan.
Work No.23 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.7km length between Work No. 22 and Work No. 24 including:
(a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c)installation of underground fibre optic cables for transfer of electronic communications;
(d)construction of a haul road, temporary construction accesses and working areas and laydown area;
(e)reinstatement, ecological and environmental works; and
(f)drainage works including creation of connections to existing drainage system
as shown on Sheet 18 of the Works Plan.
Work No.24 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.5km length between Work No. 23 and Work No. 25 including:
(a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c)installation of underground fibre optic cables for transfer of electronic communications;
(d)construction of a haul road, temporary construction accesses and working areas and laydown area;
(e)reinstatement, ecological and environmental works; and
(f)drainage works including creation of connections to existing drainage system
as shown on Sheet 19 of the Works Plan.
Work No.25 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.9km length between Work No. 24 and Work No. 26 including:
(a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c)installation of underground fibre optic cables for transfer of electronic communications;
(d)construction of a haul road, temporary construction accesses and working areas and laydown area;
(e)reinstatement, ecological and environmental works; and
(f)drainage works including creation of connections to existing drainage system
as shown on Sheet 20 of the Works Plan.
Work No.26 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.6km length between Work No. 25 and Work No. 27 including:
(a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c)installation of underground fibre optic cables for transfer of electronic communications;
(d)construction of a haul road, temporary construction accesses and working areas and laydown area;
(e)reinstatement, ecological and environmental works; and
(f)drainage works including creation of connections to existing drainage system
as shown on Sheet 21 of the Works Plan.
Work No.27 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.7km length between Work No. 26 and Work No. 28 including:
(a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c)installation of underground fibre optic cables for transfer of electronic communications;
(d)construction of a haul road, temporary construction accesses and working areas and laydown area;
(e)reinstatement, ecological and environmental works; and
(f)drainage works including creation of connections to existing drainage system
as shown on Sheet 22 of the Works Plan.
Work No.28 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.7km length between Work No. 27 and Work No. 29 including:
(a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c)installation of underground fibre optic cables for transfer of electronic communications;
(d)construction of a haul road, temporary construction accesses and working areas and laydown area;
(e)reinstatement, ecological and environmental works; and
(f)drainage works including creation of connections to existing drainage system
as shown on Sheet 23 of the Works Plan.
Work No.29 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.7km length between Work No. 28 and Work No. 30 including:
(a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c)installation of underground fibre optic cables for transfer of electronic communications;
(d)construction of a haul road, temporary construction accesses and working areas and laydown area;
(e)reinstatement, ecological and environmental works; and
(f)drainage works including creation of connections to existing drainage system
as shown on Sheet 24 of the Works Plan.
Work No.30 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.5km length between Work No. 29 and Work No. 31 including:
(a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c)installation of underground fibre optic cables for transfer of electronic communications;
(d)construction of a haul road, temporary construction accesses and working areas and laydown area;
(e)reinstatement, ecological and environmental works; and
(f)drainage works including creation of connections to existing drainage system
as shown on Sheet 25 of the Works Plan.
Work No.31 – Construction of a BVS at Louth Road within the location shown on Sheet 25 and Sheet 26 of the Works Plan, including:
(a)a fenced compound area containing:
(i)security lighting and CCTV cameras;
(ii)block valve;
(iii)parking area;
(iv)cathodic protection measures;
(v)instrumentation and control kiosk;
(vi)vent stack;
(b)below ground pipework;
(c)above ground control boxes;
(d)hard standing;
(e)soakaway type drainage system;
(f)landscaping;
and the following temporary requirements during construction activities:
(g)welfare and security facilities;
(h)parking area;
(i)plant and materials storage area; and
(j)temporary waste management facility.
Work No.32 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.7km length between Work No. 31 and Work No. 33 including:
(a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c)installation of underground fibre optic cables for transfer of electronic communications;
(d)construction of a haul road, temporary construction accesses and working areas and laydown area;
(e)reinstatement, ecological and environmental works; and
(f)drainage works including creation of connections to existing drainage system
as shown on Sheet 26 of the Works Plan.
Work No.33 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.5km length between Work No. 32 and Work No. 34 including:
(a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c)installation of underground fibre optic cables for transfer of electronic communications;
(d)construction of a haul road, temporary construction accesses and working areas and laydown area;
(e)reinstatement, ecological and environmental works; and
(f)drainage works including creation of connections to existing drainage system
as shown on Sheet 27 of the Works Plan.
Work No.34 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.5km length between Work No. 33 and Work No. 35 including:
(a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c)installation of underground fibre optic cables for transfer of electronic communications;
(d)construction of a haul road, temporary construction accesses and working areas and laydown area;
(e)reinstatement, ecological and environmental works; and
(f)drainage works including creation of connections to existing drainage system
as shown on Sheet 28 of the Works Plan.
Work No.35 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.8km length between Work No. 34 and Work No. 36 including:
(a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c)installation of underground fibre optic cables for transfer of electronic communications;
(d)construction of a haul road, temporary construction accesses and working areas and laydown area;
(e)reinstatement, ecological and environmental works; and
(f)drainage works including creation of connections to existing drainage system
as shown on Sheet 29 of the Works Plan.
Work No.36 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.7km length between Work No. 35 and Work No. 37 including:
(a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c)installation of underground fibre optic cables for transfer of electronic communications;
(d)construction of a haul road, temporary construction accesses and working areas and laydown area;
(e)reinstatement, ecological and environmental works; and
(f)drainage works including creation of connections to existing drainage system
as shown on Sheet 30 of the Works Plan.
Work No.37 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.9km length between Work No. 36 and Work No. 38 including:
(a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c)installation of underground fibre optic cables for transfer of electronic communications;
(d)construction of a haul road, temporary construction accesses and working areas and laydown area;
(e)reinstatement, ecological and environmental works; and
(f)drainage works including creation of connections to existing drainage system
as shown on Sheet 31 of the Works Plan.
Work No.37a – Construction and use of a temporary access and laydown location at Lordship Road for use during the construction of the authorised development at the location shown on Sheet 31 of the Works Plan including:
(a)temporary office, welfare and security facilities;
(b)a parking area;
(c)laydown / materials storage area;
(d)waste management facilities; and
(e)fencing and gating.
Work No.38 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.9km length between Work No. 37 and Work No. 39 including:
(a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c)installation of underground fibre optic cables for transfer of electronic communications;
(d)construction of a haul road, temporary construction accesses and working areas and laydown area;
(e)reinstatement, ecological and environmental works; and
(f)drainage works including creation of connections to existing drainage system
as shown on Sheet 32 of the Works Plan.
Work No.39 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.6km length between Work No. 38 and Work No. 40 including:
(a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c)installation of underground fibre optic cables for transfer of electronic communications;
(d)construction of a haul road, temporary construction accesses and working areas and laydown area;
(e)reinstatement, ecological and environmental works; and
(f)drainage works including creation of connections to existing drainage system
as shown on Sheet 33 of the Works Plan.
Work No.40 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.5km length between Work No. 39 and Work No. 41 including:
(a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c)installation of underground fibre optic cables for transfer of electronic communications;
(d)construction of a haul road, temporary construction accesses and working areas and laydown area;
(e)reinstatement, ecological and environmental works; and
(f)drainage works including creation of connections to existing drainage system
as shown on Sheet 34 of the Works Plan.
Work No.41 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 437 metres length between Work No. 40 and Work No. 43 including:
(a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(c)installation of underground fibre optic cables for transfer of electronic communications;
(d)construction of a haul road, temporary construction accesses and working areas and laydown area;
(e)reinstatement, ecological and environmental works; and
(f)drainage works including creation of connections to existing drainage system
as shown on Sheet 35 of the Works Plan.
Work No.43 –
(a)construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 304 metres length between Work No. 41 and Work No. 44 including:
(i)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
(ii)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
(iii)installation of underground fibre optic cables for transfer of electronic communications;
(iv)construction of a haul road, temporary construction accesses and working areas and laydown area;
(v)reinstatement, ecological and environmental works; and
(vi)drainage works including creation of connections to existing drainage system
as shown on Sheet 35 of the Works Plan.
Work No.44 –
(a)construction of an AGI comprising equipment for the control and interface of the pipeline to the Theddlethorpe Facility, within the location shown on Sheet 35 of the Works Plan, including:
(i)a fenced compound area containing;
(aa)security lighting;
(bb)parking;
(cc)cathodic protection measures (including groundbeds)
(dd)CCTV cameras, intrusion detection systems and access control systems;
(ee)PIG launcher and receiver facilities (including a projectile blast wall);
(ff)local equipment room;
(gg)supporting infrastructure;
(hh)control mechanisms and electrical and instrumentation kiosk; and
(ii)venting system including vent pipework, valves and vent stack;
(ii)above ground control boxes
(iii)above/below ground pipework and isolation valves;
(iv)below ground cables and cable ducts;
(v)hard standing;
(vi)drainage works, including creation of connections to existing drainage system; and
(vii)landscaping.
Work No.47 – The creation and use of a temporary logistics and construction compound (Southern Construction Compound) for the use during the construction of the authorised development, within the location shown on Sheet 35 of the Works Plan, including:
(a)welfare and security facilities;
(b)a parking area;
(c)temporary lighting;
(d)pipe equipment and fittings storage;
(e)plant storage;
(f)a plant wheel wash area;
(g)waste processing and management areas; and
(h)fencing and gating.
Work No.48 – Removal and replacement of an existing isolation valve with a new isolation valve at the Dune Valve Station, within the location shown on Sheet 36 of the Works Plan.
Associated Development
Associated development within the meaning of section 115(2) of the 2008 Act comprising—
Work No.01a – The creation and use of a temporary working area for use during the construction of the AGI works at the Immingham facility, within the location shown on Sheet 1 of the Works Plan, including;
(a)office, welfare and security facilities;
(b)a parking area;
(c)plant and materials storage;
(d)waste processing and management areas; and
(e)fencing and gating.
Work No.01b – The creation and use of a vehicular access to Work No. 1 from Rosper Road, within the location shown on Sheet 1 of the Works Plan, including;
(a)improvement of road surfacing and provision of new hard surfacing;
(b)creation of a new bellmouth junction and visibility splays; and
(c)installation of utilities.
Work No.01c – Installation and use of cables and fibre optic cables within Rosper Road to the Immingham facility as shown on Sheet 1 of the Works Plan for supply of electricity and electronic communications.
Work No.03a – Construction and use of a temporary access and laydown location at Humber Road for use during construction of the authorised development at the location shown on Sheet 1 of the Works Plan including:
(a)temporary office, welfare and security facilities;
(b)a parking area; and
(c)fencing and gating.
Work No.03b – Construction and use of a temporary access and laydown location at A1173 – Manby Road for use during the construction of the authorised development at the location shown on Sheet 1 of the Works Plan including:
(a)temporary office, welfare and security facilities;
(b)a parking area;
(c)laydown / materials storage area;
(d)waste management facilities; and
(e)fencing and gating.
Work No.06a – Construction and use of a temporary access and laydown location at Habrough Road for use during the construction of the authorised development at the location shown on Sheet 3 of the Works Plan including:
(a)temporary office, welfare and security facilities;
(b)a parking area;
(c)laydown / materials storage area;
(d)waste management facilities; and
(e)fencing and gating.
Work No.07a – Creation and use of temporary access from Habrough Road, within the location shown on Sheet 4 of the Works Plan, including:
(a)improvement of an existing junction with the public road; and
(b)improvement of road surfacing (i.e. temporary stone surface).
Work No.07b – Installation and use of cables and fibre optic cables from within Habrough Road as shown on Sheet 4 of the Works Plan for supply of electricity and electronic communications.
Work No.08a – Construction and use of a temporary access and laydown location at Roxton Road for use during the construction of the authorised development at the location shown on Sheet 5 of the Works Plan including:
(a)temporary office, welfare and security facilities;
(b)a parking area;
(c)laydown / materials storage area;
(d)waste management facilities; and
(e)fencing and gating.
Work No.09a – Creation and use of a temporary access from Roxton Road for construction of the authorised development, within the location shown on Sheet 6 of the Works Plan, including:
(a)improvement of an existing junction with the public road; and
(b)improvement of road surfacing (i.e. temporary stone surface).
Work No.10a – Construction and use of a temporary access and laydown location at Keelby Road for use during the construction of the authorised development at the location shown on Sheet 7 of the Works Plan including:
(a)temporary office, welfare and security facilities;
(b)a parking area;
(c)laydown / materials storage area;
(d)waste management facilities; and
(e)fencing and gating.
Work No.11a – Construction and use of a temporary access and laydown location at A1173 – Riby Road for use during the construction of the authorised development at the location shown on Sheet 8 of the Works Plan including:
(a)temporary office, welfare and security facilities;
(b)a parking area;
(c)laydown / materials storage area;
(d)waste management facilities; and
(e)fencing and gating.
Work No.12a – Creation and use of a temporary access on Lay-By off A18 – Barton Street for construction of the authorised development, within the location shown on Sheet 9 of the Works Plan, including:
(a)improvement of an existing junction with the public road; and
(b)improvement of road surfacing (i.e. temporary stone surface).
Work No.12b – Creation and use of a temporary access on Lay-By off A18 – Barton Street for construction of the authorised development, within the location shown on Sheet 9 of the Works Plan, including:
(a)improvement of an existing junction with the public road; and
(b)improvement of road surfacing (i.e. temporary stone surface).
Work No.13a – Construction and use of a temporary access and laydown location at Washingdales Lane for use during the construction of the authorised development at the location shown on Sheet 10 of the Works Plan including:
(a)temporary office, welfare and security facilities;
(b)a parking area;
(c)laydown / materials storage area;
(d)waste management facilities; and
(e)fencing and gating.
Work No.14a – Creation and use of a vehicular access from Washingdales Lane to Work No. 14, within the location shown on Sheet 10 of the Works Plan, including:
(a)improvement of road surfacing and provision of new hard surfacing;
(b)creation of a new bellmouth junction and visibility splays; and
(c)installation of utilities.
Work No.14b – Installation and use of cables and fibre optic cables within A18 (Barton Street) to Work No. 14 as shown on Sheet 10 of the Works Plan for supply of electricity and electronic communications.
Work No.15b – Construction and use of a temporary access and laydown location at Road A46 for use during the construction of the authorised development at the location shown on Sheet 11 of the Works Plan including:
(a)temporary office, welfare and security facilities;
(b)a parking area;
(c)laydown / materials storage area;
(d)waste management facilities; and
(e)fencing and gating.
Work No.15c – Construction and use of a temporary access and laydown location at Old Main Road for use during the construction of the authorised development at the location shown on Sheet 11 of the Works Plan including:
(a)temporary office, welfare and security facilities;
(b)a parking area;
(c)laydown / materials storage area;
(d)waste management facilities; and
(e)fencing and gating.
Work No.16b – The creation and use of a temporary logistics and construction compound (Central Construction Compound) for use during the construction of the authorised development, within the location shown on Sheet 12 of the Works Plan including:
(a)office, welfare and security facilities;
(b)a parking area;
(c)temporary lighting;
(d)pipe equipment and fittings storage;
(e)plant storage;
(f)a plant wheel wash area;
(g)waste management areas; and
(h)fencing and gating.
Work No.16c – Creation and use of a temporary access from Road A18 (Barton Street) for construction of the authorised development, within the location shown on Sheet 12 of the Works Plan, including:
(a)creation of a new bellmouth junction with the public highway; and
(b)improvement of road surfacing (i.e. temporary stone surface).
Work No.17a – Construction and use of a temporary access and laydown location at Beelsby Road for use during the construction of the authorised development at the location shown on Sheet 13 of the Works Plan including:
(a)temporary office, welfare and security facilities;
(b)a parking area;
(c)laydown / materials storage area;
(d)waste management facilities; and
(e)fencing and gating.
Work No.17b – Creation and use of a temporary access from Road A18 (Barton Street) for construction of the authorised development, within the location shown on Sheet 13 of the Works Plan, including:
(a)creation of a new bellmouth junction with the public road; and
(b)improvement of road surfacing (i.e. temporary stone surface).
Work No.18a – Creation and use of a temporary access for construction of the authorised development within the location shown on Sheet 14 of the Works Plan, including:
(a)creation of a new bellmouth junction with the public road; and
(b)installation of road surfacing (i.e. temporary stone surface).
Work No.21a – Creation and use of a vehicular access from Thoroughfare Road to Work No. 21, within the location shown on Sheet 16 of the Works Plan, including:
(a)improvement of road surfacing and provision of new hard surfacing;
(b)creation of a new bellmouth junction and visibility splays; and
(c)installation of utilities.
Work No.21b – Installation and use of cables and fibre optic cables within Thoroughfare Road to Work No. 21 as shown on Sheet 16 of the Works Plan for supply of electricity and electronic communications.
Work No.21c – Creation and use of a temporary access from Thoroughfare Road for construction of the authorised development, within the location shown on Sheet 16 of the Works Plan, including:
(a)improvement of an existing junction with the public road; and
(b)improvement of road surfacing (i.e. temporary stone surface).
Work No.24a – Construction and use of a temporary access and laydown location at White Road for use during the construction of the authorised development at the location shown on Sheet 19 of the Works Plan including:
(a)temporary office, welfare and security facilities;
(b)a parking area;
(c)laydown / materials storage area;
(d)waste management facilities; and
(e)fencing and gating.
Work No.24b – Creation and use of a temporary access from White Road for construction of the authorised development, within the location shown on Sheet 19 of the Works Plan, including:
(a)improvement of an existing junction with the public road; and
(b)improvement of road surfacing (i.e. temporary stone surface).
Work No.24c – Construction and use of a temporary access and laydown location at White Road for use during the construction of the authorised development at the location shown on Sheet 19 of the Works Plan including:
(a)temporary office, welfare and security facilities;
(b)a parking area; and
(c)fencing and gating.
Work No.25a – Creation and use of a temporary access from Road A16 for construction of the authorised development, within the location shown on Sheet 20 of the Works Plan, including:
(a)improvement of an existing junction with the public road; and
(b)improvement of road surfacing (i.e. temporary stone surface).
Work No.25b – Creation and use of a temporary access from Road A16 for construction of the authorised development, within the location shown on Sheet 20 of the Works Plan, including:
(a)improvement of an existing junction with the public road; and
(b)improvement of road surfacing (i.e. temporary stone surface).
Work No.25c – Construction and use of a temporary access and laydown location at Road A16 – Louth Road for use during the construction of the authorised development at the location shown on Sheet 20 of the Works Plan including:
(a)temporary office, welfare and security facilities;
(b)a parking area; and
(c)fencing and gating.
Work No.26a – Construction and use of a temporary access and laydown location at Pear Tree Lane for use during the construction of the authorised development at the location shown on Sheet 21 of the Works Plan including:
(a)temporary office, welfare and security facilities;
(b)a parking area;
(c)laydown / materials storage area;
(d)waste management facilities; and
(e)fencing and gating.
Work No.28a – Construction and use of a temporary access and laydown location at Fotherby Road (Little Grimsby Lane) for use during the construction of the authorised development at the location shown on Sheet 23 of the Works Plan including:
(a)temporary office, welfare and security facilities;
(b)a parking area; and
(c)fencing and gating.
Work No.29a – Creation and use of a temporary construction access from Brackenborough Road for construction of the authorised development, within the location shown on Sheet 24 of the Works Plan, including:
(a)creation of a new bellmouth junction with the public road; and
(b)improvement of road surfacing (i.e. temporary stone surface).
Work No.29b – Creation and use of a temporary construction access from Brackenborough Road for construction of the authorised development, within the location shown on Sheet 24 of the Works Plan, including:
(a)creation of a new bellmouth junction with the public road; and
(b)improvement of road surfacing (i.e. temporary stone surface).
Work No.31a – Creation and use of a vehicular access from Louth Road to Work No. 31, within the location shown on Sheet 25 and Sheet 26 of the Works Plan, including:
(a)improvement of road surfacing and provision of new hard surfacing;
(b)creation of a new bellmouth junction and visibility splays; and
(c)installation of utilities.
Work No.31b – Installation and use of cables and fibre optic cables within Louth Road to Work No. 30 as shown on Sheet 25 and Sheet 26 of the Works Plan for supply of electricity and electronic communications.
Work No.32a - Construction and use of a temporary access and laydown location at Louth Road for use during the construction of the authorised development at the location shown on Sheet 25 and Sheet 26 of the Works Plan including:
(a)temporary office, welfare and security facilities;
(b)a parking area;
(c)laydown / materials storage area;
(d)waste management facilities; and
(e)fencing and gating.
Work No.33a – Construction and use of a temporary access and laydown location at Louth Road for use during the construction of the authorised development at the location shown on Sheet 27 of the Works Plan including:
(a)temporary office, welfare and security facilities;
(b)a parking area;
(c)laydown / materials storage area;
(d)waste management facilities; and
(e)fencing and gating.
Work No.34a – Construction and use of a temporary access and laydown location at Marsh Lane for use during the construction of the authorised development at the location shown on Sheet 28 of the Works Plan including:
(a)temporary office, welfare and security facilities;
(b)a parking area; and
(c)fencing and gating.
Work No.34b – Creation and use of a temporary construction access from Red Leas Lane for construction of the authorised development, within the location shown on Sheet 28 of the Works Plan, including:
(a)creation of a new bellmouth junction with the public road; and
(b)improvement of road surfacing (i.e. temporary stone surface).
Work No.34c – Creation and use of a temporary construction access from Pick Hill Lane for construction of the authorised development, within the location shown on Sheet 28 of the Works Plan, including:
(a)creation of a new bellmouth junction with the public road; and
(b)improvement of road surfacing (i.e. temporary stone surface).
Work No.36a – Creation and use of a temporary construction access from B1200 - Manby Middlegate Road for construction of the authorised development, within the location shown on Sheet 30 of the Works Plan, including:
(a)creation of a new bellmouth junction with the public road; and
(b)improvement of road surfacing (i.e. temporary stone surface).
Work No.36b – Construction and use of a temporary access and laydown location at B1200 – Manby Middlegate Road for use during the construction of the authorised development at the location shown on Sheet 30 of the Works Plan including:
(a)temporary office, welfare and security facilities;
(b)a parking area;
(c)laydown / materials storage area;
(d)waste management facilities; and
(e)fencing and gating.
Work No.36c – Construction and use of a temporary access and laydown location at B1200 Manby Middlegate Road for use during the construction of the authorised development at the location shown on Sheet 30 of the Works Plan including:
(a)temporary office, welfare and security facilities;
(b)a parking area;
(c)laydown / materials storage area;
(d)waste management facilities; and
(e)fencing and gating.
Work No.36d – Improvement and use of an existing track as a temporary access for construction of the authorised development within the location shown on Sheet 30 of the Works Plan, including:
(a)improvement of an existing track access; and
(b)improvement of the track surfacing (i.e. temporary stone surface).
Work No.40a – Construction and use of a temporary access and laydown location at Mill Road for use during the construction of the authorised development at the location shown on Sheet 34 of the Works Plan including:
(a)temporary office, welfare and security facilities;
(b)a parking area; and
(c)fencing and gating.
Work No.41a – Creation and use of a temporary construction access from A1031- Maplethorpe Road for construction of the authorised development, within the location shown on Sheets 34 and 35 of the Works Plan, including:
(a)creation of a new bellmouth junction with the public road; and
(b)improvement of road surfacing and provision of new hard surfacing.
Work No.41b – Construction and use of a temporary access and laydown location at Maplethorpe Road for use during the construction of the authorised development including trenchless crossing installation works at A1031- Maplethorpe Road within the location shown on Sheets 34 and 35 of the Works Plan, including:
(a)office, welfare and security facilities;
(b)a parking area;
(c)laydown / materials storage area;
(d)waste processing and management areas; and
(e)fencing and gating.
Work No.44a –improvement and use of an existing vehicular access from A1031- Maplethorpe Road to Work No. 44, within the location shown on Sheet 35 of the Works Plan, including improvement of existing road surfacing.
Work No.45 – Installation and use of cables and fibre optic cables to the Theddlethorpe Facility within the location shown on Sheet 35 of the Works Plan for supply of electricity and electronic communications.
Work No.46 – Creation and use of a temporary access for construction of the authorised development, within the location shown on Sheet 35 of the Works Plan, including:
(a)creation of a new bellmouth junction with the existing road; and
(b)improvement of road surfacing (i.e. temporary stone surface).
Work No.47a – Improvement and use of an existing vehicular access for construction of the authorised development from A1031- Maplethorpe Road to Work No. 47, within the location shown on Sheet 35 of the Works Plan, including improvement of existing road surfacing.
Work No.48a –
(a)installation and use of cables and fibre optic cables from Work No. 44 to Work No. 48 as shown on Sheets 35 and 36 of the Works Plan for supply of electricity and electronic communications;
Work No.48b – The creation and use of a vehicular access to Work No. 48 from North End Road, Mablethorpe within the location shown on Sheet 36 of the Works Plan including;
(a)installation of any required visibility splay at an existing junction with the public road;
(b)road surfacing and provision of new hard surfacing; and
(c)installation of utilities.
Work No.48c – The creation and use of a temporary working area for use during the construction of the authorised development, within the location shown on the Works Plan, including construction of a temporary construction accesses and laydown area.
Further Associated Development
In connection with any of those works, within the Order limits, development comprising such other works as may be necessary or expedient for the purposes of or in connection with the relevant part of the authorised development which fall within the scope of work assessed in the environmental statement, including—
(a)site preparation works, site clearance (including fencing, vegetation removal, demolition of existing structures and the creation of alternative footpaths); earthworks (including soil stripping and storage and site levelling) and pre-construction drainage works;
(b)installation of wires, cables, conductors, pipes and ducts;
(c)establishment of winching points and installation of temporary scaffolding;
(d)construction works including—
(i)works to enable power supplies and temporary lighting;
(ii)establishment of temporary working areas;
(iii)installation of demarcation fencing/stockproof fencing/heras fencing or similar;
(iv)earthworks;
(v)aerial markers, cathodic protection test posts, cathodic protection rectifier cabinets, sacrificial anodes, field boundary markers, manholes, marker posts, underground markers, tiles and tape;
(e)works to place, alter, divert, relocate, remove or maintain the position of apparatus, services, plant and other equipment in a street, or in other land, including mains, sewers, drains, pipes, lights and cables;
(f)works to alter the course of, or otherwise interfere with a watercourse, drainage works, attenuation ponds and temporary culverts;
(g)landscaping, works associated with the provision of ecological mitigation and other works to mitigate any adverse effects of the construction, maintenance or operation of the authorised development;
(h)works for the benefit or protection of land, structures, apparatus or equipment affected by the authorised development;
(i)works for the purpose of habitat creation;
(j)the felling, planting and maintenance of trees and hedgerows; and
(k)such other works as may be necessary or expedient for the purposes of, or for purposes associated with or ancillary to, the construction, operation or maintenance of the authorised development.