7.  The elements of the authorised development listed in columns (1) and (2) of the table below must not exceed the maximum dimensions and levels (as applicable) set out in relation to that element in columns (3) to (6) of that table.

(1)

Element of

authorised development

(2)

Work No.

(3)

Maximum building height (metres)

(4)

Maximum parameter height (metres AOD)

(5)

Maximum work area (m 2)

(6)

Maximum volume in m 3)

(7)

Notes

Airfield equipment – Surface Movement Radar2a(02)14.3176.25,0177,508N/A
New Airfield Equipment Instrument Runway Visual Range (IRVR)2b(02)3.3163.737,300123,090N/A
Fire Training Ground2d15.4177.887,346423,500N/A
Existing Engine Run Up bay updates2e4.4159.416,02567,320N/A
Engine Run Up bay2f13.2166.812,525132,000N/A
Relocated Engine Run Up bay2g13.2166.611,512132,000N/A
Terminal 1 New Pier C and External Canopy3a(01)16.5173.74,13344,616N/A
Terminal 1 Immigration extension3a(02)9.4167.62702,525N/A
Terminal 1 Departure Lounge South extension3a(03)18.7171.195712,155N/A
Terminal 1 Departure Lounge North extension3a(04)9.4171.44003,740N/A
Terminal 1 Baggage Hall extension3a(05)11.6164.01,1049,221N/A
Terminal 23b(01)26.5180.530,470672,067N/A
Terminal 2 extension3b(02)26.5180.510,635212,689N/A
Terminal 2 West Pier3c(01)14.4169.615,07069,364N/A
Terminal 2 East Pier3c(02)14.4168.515,06069,433N/A
Coach Station3d8.3161.88,67549,172N/A
Terminal 2 Plaza3f23.7177.25,93070,950N/A
Luton DART Terminal 2 Station and Tunnel extension3g23.7177.226,79088,569Maximum volume relates to above ground areas only and excludes develop-ment beneath surface level
Terminal 2 Support Buildings – Energy Centre3h12.8167.211,26595,983Maximum work area includes Terminal 2 Support Buildings  – Service Yard
Terminal 2 Support Buildings – Service Yard3h5.0159.5Included in maximum work area for Terminal 2 Support Buildings  – Energy Centre 941N/A
Terminal 2 Support Buildings – Emergency Vehicle Assembly Area3h5.0159.24,8582,047N/A
Airport Operations and Maintenance3i15.2168.722,100335,478N/A
Hotel4a22.0175.59,44145,980N/A
Hangar A and B4b27.5185.016,641316,800N/A
Fuel Storage Facility4c(01)24.2151.483,700459,800N/A
Fuel Pipeline – above ground installation4c(02)4.6140.48,35538,600N/A
Water Treatment Plant4d13.9141.06,76069,994N/A
Solar Energy Battery4e7.2139.85,27037,681N/A
Airside Security and Access4f5.0158.02,870545N/A
Car Park P14g20.4135.414,105111,588N/A
Car Park P5 – New Decked Car Park4k(02)7.7163.222,536147,303N/A
Car Park P9 – New Decked Car Park4o(02)7.7161.627,362163,286N/A
Car Park P10 – New Long Stay car park4p(01)5.0142.028,969The maximum building height applies to the PV canopies, bus shelters and barriers within this work.
Car Park P10 – Reconfiguration of New Long Stay Car Park4p(02)5.0135.071,4102,005The maximum building volume applies to the welfare buildings within this work.
Car Park 11 – New Long Stay Car Park4q(01)5.0137.045,0452,797The maximum building volume applies to the welfare buildings within this work.
Car Park P11 – Expanded Long Stay Car Park4q(02)5.0137.051,789644The maximum building volume applies to the welfare buildings within this work.
Car Park P12 – New Terminal 2 Multi Storey Car Park4r17.1170.625,070315,205N/A
Police Station4u12.1173.56,78014,520N/A
Substation4w7.6162.04,0059,222N/A
Substation4x7.6162.13,60012,144N/A