SCHEDULES

SCHEDULE 1AUTHORISED DEVELOPMENT

Airport support facilities

  • Work No. 4a — Within the area of land shown on the Works Plans as Work No. 4a, the construction of a hotel. To include—

    (a)

    external vehicle/pedestrian access and circulation work;

    (b)

    service yard access for deliveries, loading dock, maintenance access and segregated waste bailing/compaction/storage;

    (c)

    hard and soft landscaping;

    (d)

    dedicated sprinkler tank and fire suppression system; and

    (e)

    controlled access parking provision for hotel residents/staff.

  • Work No. 4b — Within the area of land shown on the Works Plans as Work No. 4b, the construction of up to two hangars. To include—

    (a)

    external vehicle/pedestrian access routes;

    (b)

    hard and soft landscaping;

    (c)

    fire suppression system and dedicated water tank; and

    (d)

    controlled access internal parking.

  • Work No. 4c(01) — Within the area of land shown on the Works Plans as Work No. 4c(01), the construction of fuel storage and distribution facilities to connect to Work No. 4c(02), and a distribution system that will extend to the apron area (Work Nos. 2b(03) and 2c(01)). To include—

    (a)

    installation of fuel storage tanks and associated pipework;

    (b)

    fuel pipework between the new storage facilities and the existing storage facility;

    (c)

    bund walls;

    (d)

    drainage and foul infrastructure;

    (e)

    lighting;

    (f)

    firefighting facilities and water storage tank;

    (g)

    vehicle and pedestrian access routes, parking areas;

    (h)

    security fencing, gates and monitoring systems; and

    (i)

    ancillary buildings.

  • Work No. 4c(02) — Within the area of land shown on the Works Plans as Work No. 4c(02), the construction of a new fuel pipeline providing a fuel pipe connection between the fuel storage facility (Work No.4c(01)), national fuel delivery pipeline, and existing storage facility. To include—

    (a)

    earthworks to resolve site levels;

    (b)

    pipework monitoring systems;

    (c)

    fuel pumps;

    (d)

    landscaping;

    (e)

    security fencing, gates and monitoring systems; and

    (f)

    vehicle access track from highway to provide access and parking and loading area adjacent to national pipeline connection.

  • Work No. 4d — Within the area of land shown on the Works Plans as Work No. 4d, the construction of a new water treatment plant. To include—

    (a)

    primary, biological, secondary and final treatment;

    (b)

    facilities for processing and storage of sludge;

    (c)

    odour control plant; and

    (d)

    soft landscaping.

  • Work No. 4e— Within the area of land shown on the Works Plans as Work No. 4e, the construction of a solar energy battery storage facility. To include—

    (a)

    drainage and foul infrastructure;

    (b)

    firefighting facilities;

    (c)

    lighting;

    (d)

    vehicle and pedestrian access routes;

    (e)

    parking areas;

    (f)

    security fencing, gates and monitoring systems; and

    (g)

    ancillary buildings.

  • Work No. 4f— Within the area of land shown on the Works Plans as Work No. 4f, the construction of airside security and access including the construction of a vehicle control point facility and associated power, communications, potable water and foul drainage connections.

  • Work No. 4g — Car Park P1. Within the area of land shown on the Works Plans as Work No. 4g, the construction of Car Park P1 being a multi-storey car park to provide up to approximately 1000 parking spaces. To include—

    (a)

    drainage works including interceptor tanks;

    (b)

    vehicle connection with highway;

    (c)

    vehicular and pedestrian access and circulation routes;

    (d)

    parking entry and exit gates;

    (e)

    ticket machines;

    (f)

    firefighting system, dry risers and provision for fire tender access;

    (g)

    general and emergency lighting;

    (h)

    statutory and wayfinding signage;

    (i)

    solar energy production, storage, and distribution provision; and

    (j)

    security systems.

  • Work No. 4h — Car Park P2. Within the area of land shown on the Works Plans as Work No. 4h, the construction of Car Park P2 being a surface car park to provide up to approximately 470 parking spaces. To include—

    (a)

    car park surfacing;

    (b)

    drainage works including interceptor tanks;

    (c)

    vehicle connection with highway;

    (d)

    vehicular and pedestrian access and circulation routes;

    (e)

    parking entry and exit gates;

    (f)

    ticket machines;

    (g)

    general and emergency lighting;

    (h)

    statutory and wayfinding signage;

    (i)

    solar energy production, storage, and distribution provision; and

    (j)

    security systems.

  • Work No. 4i — Car Park P3. Within the area of land shown on the Works Plans as Work No. 4i, works to modify the existing Airport Car Park (as a result of Work No. 6a) with realignment of the roadside perimeter fence and circulation road. To include—

    (a)

    car park surfacing;

    (b)

    statutory and wayfinding signage; and

    (c)

    general and emergency lighting.

  • Work No. 4j —Car Park P4. Within the area of land shown on the Works Plans as Work No. 4j, works to reconfigure the existing T1 Multi Storey Car Park 1 to provide additional parking.

  • Work No. 4k(01) — Car Park P5. Within the area of land shown on the Works Plans as Work No. 4k(01), works to reduce the existing long stay surface car park in area and reconfiguration to provide up to approximately 2450 parking spaces. To include—

    (a)

    car park surfacing;

    (b)

    statutory and wayfinding signage;

    (c)

    hard and soft landscaping;

    (d)

    general and emergency lighting.

  • Work No. 4k(02) — Car Park P5. Within the area of land shown on the Works Plans as Work No. 4k(02), works to reduce the size of the existing long stay surface car park with the construction of a single storey decked car parking area reconfigured to provide up to approximately 1200 parking spaces. To include—

    (a)

    drainage works including separator tanks;

    (b)

    hard and soft landscaping;

    (c)

    vehicle connection with highway;

    (d)

    vehicular and pedestrian access and circulation routes;

    (e)

    parking entry and exit gates;

    (f)

    ticket machines;

    (g)

    firefighting system, dry riser provision for fire tender access;

    (h)

    general and emergency lighting;

    (i)

    statutory and wayfinding signage;

    (j)

    solar energy production, storage, and distribution provision; and

    (k)

    security systems.

  • Work No. 4l(01) — Car Park P6. Within the area of land shown on the Works Plans as Work No. 4l(01), works to construct a new temporary surface car park to provide up to approximately 1,250 car parking spaces including works to remove the temporary car park, hard and soft landscaped areas, signage, and surface treatments.

  • Work No. 4l(02) — Car Park P6. Within the area of land shown on the Works Plans as Work No. 4l(02), works to reconfigure and extend the temporary surface car park (Work No. 4l(01)) to provide up to approximately 1,620 car parking spaces including works to remove the temporary car park, hard and soft landscaped areas, signage, and surface treatments.

  • Work No. 4m(01) — Car Park P7. Within the area of land shown on the Works Plans as Work No. 4m(01), works to construct a new temporary surface car park to accommodate up to approximately 3,090 cars. including works to remove the temporary car park, hard and soft landscaped areas, signage, and surface treatments.

  • Work No. 4m(02) — Car Park P7. Within the area of land shown on the Works Plans as Work No. 4m(02), works to reduce the temporary surface car park (Work No. 4m(01)) to accommodate up to approximately 1,230 cars including works to remove the temporary surface car park, hard and soft landscaped areas, signage, and surface treatments.

  • Work No. 4n — Car Park P8. Within the area of land shown on the Works Plans as Work No. 4n, works to construct a temporary surface car park to accommodate up to approximately 600 cars including works to remove the temporary car park, hard and soft landscaped areas, signage, and surface treatments.

  • Work No. 4o(01) — Car Park P9. Within the area of land shown on the Works Plans as Work No. 4o(01), works to reconfigure the existing staff car park and conversion of existing car hire facility into car parking to provide up to approximately 1,075 surface car parking spaces, hard and soft landscaped areas, signage, and surface treatments.

  • Work No. 4o(02) — Car Park P9. Within the area of land shown on the Works Plans as Work No. 4o(02), works to redevelop the area of existing car park not required for the construction of Work No. 6a(02), including the provision of new decked car park with roofing or canopies above the upper deck, to support photovoltaic panels, to accommodate up to approximately 1,200 car parking spaces, hard and soft landscaped areas, signage, and surface treatments.

  • Work No. 4p(01) — Car Park P10. Within the area of land shown on the Works Plans as Work No. 4p(01), works to construct a new car park to accommodate approximately 1,150 cars including hard and soft landscaped areas, signage, and surface treatments.

  • Work No. 4p(02) — Car Park P10. Within the area of land shown on the Works Plans as Work No. 4p(02), works to expand and reconfigure Work No. 4p(01) to accommodate up to approximately 3,165 cars including canopies or roofing above the car park to support photovoltaic panels, and including hard and soft landscaped areas, signage, surface treatments and welfare building.

  • Work No. 4q(01) — Car Park P11. Within the area of land shown on the Works Plans as Work No. 4q(01), works to construct a new surface level car park to accommodate up to approximately 2,700 cars, including canopies or roofing above the car park to support photovoltaic panels, hard and soft landscaped areas, signage, below ground surface water storage tank and surface treatments.

  • Work No. 4q(02) — Car Park P11. Within the area of land shown on the Works Plans as Work No. 4q(02), works to expand Work No. 4q(01) to accommodate up to approximately 5,350 cars including canopies or roofing above the car park to support photovoltaic panels, hard and soft landscaped areas, signage, surface treatments and welfare building.

  • Work No. 4r — Car Park P12. Within the area of land shown on the Works Plans as Work No. 4r, works to construct a new multi-storey car park to accommodate up to approximately 2,225 cars including photovoltaic panels on roof or canopy over upper level, hard and soft landscaped areas, signage, and surface treatments and provision for canopies/roofing.

  • Work No. 4s — Airport Access Road car parking replacement provision. Within the area of land shown on the Works Plans as Work No. 4s, works to construct a temporary car park to accommodate up to approximately 80 car spaces to provide replacement car parking for spaces affected by the construction of Work No. 6a(02) including works to remove the temporary car park, including signage and surface treatments.

  • Work No. 4t(01) — Airport Access Road permanent car parking replacement provision. Within the area of land shown on the Works Plans as Work No. 4t(01), works to construct a new surface level car park to accommodate up to approximately 25 car spaces to provide replacement car parking for spaces affected by the construction of Work No. 6a(02), to include both hard and soft landscaped areas, signage, and surface treatments.

  • Work No. 4t(02) — Airport Access Road permanent car parking replacement provision. Within the area of land shown on the Works Plans as Work No. 4t(02), works to construct three new surface level car parks including associated access roads to accommodate up to approximately 275 car spaces to provide replacement car parking for spaces affected by the construction of Work No. 6a(02), to include both hard and soft landscaped areas, signage, and surface treatments.

  • Work No. 4t(03) — Airport Access Road permanent car parking replacement provision. Within the area of land shown on the Works Plans as Work No. 4t(03), works to construct a new surface level car park to accommodate up to approximately 25 car spaces to provide replacement car parking for spaces affected by the construction of Work No. 6a(02), to include both hard and soft landscaped areas, signage, and surface treatments.

  • Work No. 4t(04) — Airport Access Road permanent car parking replacement provision. Within the area of land shown on the Works Plans as Work No. 4t(04), works to re-provide replacement car parking spaces through amendments to areas of landscaping and existing parking areas for spaces affected by the construction of Work No. 6a(02), to include both hard and soft landscaped areas, signage, and surface treatments.

  • Work No. 4t(05) — Airport Access Road permanent car parking replacement provision. Within the area of land shown on the Works Plans as Work No. 4t(05), works to construct a new surface level car park to accommodate up to approximately 90 car spaces to provide replacement car parking for spaces affected by the construction of Work No. 6a(02), to include both hard and soft landscaped areas, signage, and surface treatments.

  • Work No. 4t(06) — Airport Access Road permanent car parking replacement provision. Within the area of land shown on the Works Plans as Work No. 4t(06), works to construct a new surface level car park to accommodate up to approximately 120 car spaces to provide replacement car parking for spaces affected by the construction of Work No. 6a(02), to include both hard and soft landscaped areas, signage, and surface treatments.

  • Work No. 4u — Within the area of land shown on the Works Plans as Work No. 4u, works to construct a new police station and compound.

  • Work No. 4v — Within the area of land shown on the Works Plans as Work No. 4v, works to construct two underground infiltration tanks and a storage tank.

  • Work No. 4w — Within the area of land shown on the Works Plans as Work No. 4w, works to construct a new primary substation, including a hardstanding area, erection of a perimeter fence and construction of an access track for maintenance.

  • Work No. 4x — Within the area of land shown on the Works Plans as Work No. 4x, works to construct a second primary substation, including a hardstanding area, erection of a perimeter fence and construction of an access track for maintenance.