Article 35

SCHEDULE 11LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN

(1)

Plot Reference Number shown on Land Plans

(2)

Purpose for which temporary possession may be taken

(3)

Relevant part of the authorised development

01-01, 01-03, 01-05, 01-08, 01-09, 01-10, 01-11, 01-13, 01-15, 01-16, 01-17, 01-18, 01-19, 01-20, 01-21 and 01-22Provision for access for environmental works to create a compensatory habitat site for nitrogen deposition.Work No. E1
02-04, 02-05, 02-06, 02-07, 02-08, 02-09, 02-10 and 02-11Provision for access for environmental works to create a compensatory habitat site for nitrogen deposition.Work No. E1
03-02, 03-03, 03-14, 03-16 and 03-17Installation of a medium-pressure gas pipeline; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. G1a and MU1
03-04 and 03-08Improvement works to the existing public right of way along footpath NS179.Work No. 1K
03-07Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MU2, MU3 and MU4
03-33Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU4
03-36 and 03-80To facilitate the construction of a new public right of way from drainage pond to the improved public right of way south of the improved A2 mainline, and to provide temporary storage, laydown areas and working space.Work No. 1K
03-87Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU3
03-96, 03-98, 03-112, 03-135, 03-139, 03-140, 03-141, 03-142, 03-143, 03-144 and 03-146Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU1
04-03 and 04-14Installation of a medium-pressure gas pipeline.Work No. G1b
04-07, 04-12, 04-17, 04-45, 04-101 and 04-122Implementation of environmental mitigation works to create a site for protected species.Work No. E5
04-08, 04-16, 04-61, 04-72, 04-109, 04-128 and 04-154Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU9
04-25, 04-28 and 04-46Improvement works of the existing public right of way to a section between Halfpence Lane roundabout to Jeskyns Community woodland.Work No. 1L
04-37Construction of a new permissive path from Halfpence Lane roundabout to road leading to Scalers Hill House; and improvement works of the existing public right of way to a section between Halfpence Lane roundabout to Jeskyns Community woodland.Works Nos. 1E and 1L
04-38Temporary construction compound at surface for facilitating main works; and installation of a medium-pressure gas pipeline.Works Nos. CA2 and G1b
04-42Temporary construction compound at surface for facilitating main works; installation of a medium-pressure gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and supports.Works Nos. CA2, G1b, MU10 and OH2
04-58 and 04-92Installation of a medium-pressure gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; overhead lines diversion works, including the removal of existing overhead lines and supports.Works Nos. G1b, MU10 and OH2
04-63, 04-93, 04-94 and 04-98Installation of a medium-pressure gas pipeline; and overhead lines diversion works, including the removal of existing overhead lines and supports.Works Nos. G1b and OH2
04-89Implementation of environmental mitigation works to create a site for protected species; installation of a medium-pressure gas pipeline; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. E4, G1a, G1b, MU10, MU11 and MUT1
04-96, 04-100 and 04-103To facilitate the construction of a new bridge to carry the realigned Thong Lane over the improved section of the A2 mainline, and to provide temporary storage, laydown areas and working space.Work No. 1H
04-99 and 04-145Implementation of environmental mitigation works to create a site for protected species.Work No. E4
04-108, 04-137 and 04-141Provision for temporary access for environmental mitigation works to create a site for protected species.Work No. E4
04-123Construction of a new permissive path from Halfpence Lane roundabout to road leading to Scalers Hill House.Work No. 1E
04-138Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU10
04-140, 04-223, 04-228, 04-244, 04-246, 04-247, 04-249, 04-251, 04-252, 04-266 and 04-268Installation of a medium-pressure gas pipeline.Work No. G1a
04-148, 04-149, 04-151, 04-152 and 04-153Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU8
04-200, 04-233, 04-257 and 04-258Improvement works to the existing public right of way along footpath NS179.Work No. 1K
04-215, 04-229, 04-243 and 04-259Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU4
04-225Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU5
04-226 and 04-227Installation of a medium-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. G1a and MU5
04-253, 04-254 and 04-255To facilitate the installation of a medium-pressure gas pipeline, and to provide temporary storage, laydown areas and working space.Work No. G1a
04-274Implementation of environmental mitigation works to create a site for protected species; and installation of a medium-pressure gas pipeline.Works Nos. E4 and G1a
04-276Temporary construction compound at surface for facilitating main works and overhead lines diversion works, including the removal of existing overhead lines and supports.Works Nos. CA2 and OH2
05-01, 05-02 and 05-03Construction of a new permissive path between the improved public right of way and Jeskyns Community woodland Improvement works of the existing public right of way to a section between Halfpence Lane roundabout to Jeskyns Community woodland.Work No. 1L
05-04, 05-05 and 05-06Improvement works of the existing public right of way to a section between Halfpence Lane roundabout to Jeskyns Community woodland.Work No. 1L
05-07, 05-08, 05-09, 05-10, 05-11, 05-12, 05-13, 05-14, 05-15, 05-16, 05-17 and 05-18Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU8
06-03Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MU15 and MU16
06-08, 06-09 and 06-11Improvement works to a section of the existing public right of way from Church Road to existing public right of way footpath NS175.Work No. 2P
06-18, 06-19, 06-98, 06-102, 06-104, 06-107, 06-111, 06-112, 06-113, 06-114 and 06-115Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU16
06-46Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Work No. OH1
06-54Provision for access for overhead lines diversion works.Work No. OH1
06-55 and 06-64Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU14
06-56Construction of a new permissive path between the improved public right of way and Jeskyns Community woodland; implementation of environmental mitigation works to create a site for protected species Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. 1L, E5 and OH1
06-67 and 06-117Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MU14 and MU9
06-72, 06-78 and 06-131Installation of a medium-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. G1b and MU16
06-75Improvement works of the existing public right of way to a section between Halfpence Lane roundabout to Jeskyns Community woodland.Work No. 1L
06-91, 06-96 and 06-99Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. 2Q and MU16
06-109 and 06-123Construction of a new public right of way from Valley Drive to the existing public right of way footpath NS174.Work No. 2Q
06-110To facilitate the construction of a new public right of way from Valley Drive to the existing public right of way footpath NS174, and to provide temporary storage, laydown areas and working space.Work No. 2Q
06-116Provision for access for environmental mitigation works to create a site for protected species.Work No. E5
06-121Implementation of environmental mitigation works to create a site for protected species; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. E5, MU14, MU9, OH1 and OHT1
06-132, 06-136, 06-137, 06-139, 06-151, 06-207, 06-208 and 06-209Installation of a medium-pressure gas pipeline.Work No. G1b
06-135To facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space.Work No. OH1
06-144Installation of a medium-pressure gas pipeline Installation of a high-pressure gas pipeline.Works Nos. G1b and G2
06-152Installation of a medium-pressure gas pipeline; installation of a high-pressure gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. G1b, G2, G3, MU17, OH1 and OHT1
06-153Construction of a new permissive path between the improved public right of way and Jeskyns Community woodland.Work No. 1L
06-158Installation of a medium-pressure gas pipeline; installation of a high-pressure gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. G1b, G2, G3, MU17 and OH1
06-182, 06-188 and 06-204Implementation of environmental mitigation works to create a site for protected species.Work No. E5
06-187 and 06-205Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU9
07-01, 07-02, 07-04, 07-05, 07-09, 07-11, 07-15, 07-17, 07-20, 07-22, 07-23, 07-26, 07-27, 07-28, 07-29, 07-40, 07-41 and 07-42Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU15
08-06, 08-07, 08-08, 08-09, 08-10, 08-11, 08-12, 08-13, 08-14 and 08-15Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU15
09-02, 09-03, 09-04, 09-05, 09-06, 09-07, 09-08, 09-09, 09-10, 09-11, 09-12, 09-13, 09-14, 09-15, 09-16, 09-17, 09-18, 09-19, 09-20, 09-21, 09-22, 09-23, 09-24, 09-25, 09-26, 09-27, 09-28, 09-29, 09-30, 09-31, 09-32, 09-33, 09-34, 09-35, 09-36, 09-37, 09-38, 09-39, 09-40, 09-41, 09-42, 09-43, 09-44, 09-45, 09-46, 09-47, 09-48, 09-49, 09-50, 09-51, 09-52, 09-53, 09-54, 09-55, 09-56, 09-57, 09-58, 09-59, 09-60, 09-61, 09-62, 09-63, 09-64, 09-65, 09-66, 09-67, 09-68 and 09-69Provision for temporary access and traffic management for the temporary construction compound facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach.Work No. CA3
10-02Overhead lines diversion works, including the removal of existing overhead lines and supports.Work No. OH2
10-05, 10-06, 10-07, 10-08, 10-09 and 10-10Provision for access for environmental works to create a compensatory habitat site for nitrogen deposition.Work No. E13
11-02, 11-03, 11-04, 11-05, 11-06 and 11-07Improvements works of a section of the existing public right of way footpath NS169.Work No. 2Q
11-15Installation of a medium-pressure gas pipeline Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. G1b and OH1
11-24Installation of a high-pressure gas pipeline; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. G3 and OH1
11-38Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. MU18 and OH1
11-39Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylonsWorks Nos. G3, MU18 and OH1
11-40Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Work No. OH1
11-43, 11-46, 11-47 and 11-48Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU18
11-50Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. G3 and MU18
11-52, 11-53 and 11-54To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space.Work No. G3
11-56, 11-57, 11-59, 11-60, 11-61, 11-62, 11-65, 11-67 and 11-76Overhead lines diversion works, including the removal of existing overhead lines and supports.Work No. OH2
11-63Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach.Work No. CA3
11-64 and 11-70Installation of a high-pressure gas pipeline.Work No. G4
11-68 and 11-69To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space.Work No. G4
11-71Overhead lines diversion works, including the removal of existing overhead lines and supports; and the establishment of a temporary utilities logistic hub for facilitating utility works.Works Nos. OH2 and ULH13
11-73Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach Installation of a high-pressure gas pipeline; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. CA3, G4 and OH1
11-75The establishment of a temporary utilities logistic hub for facilitating utility works.Work No. ULH13
12-01, 12-03 and 12-04Overhead lines diversion works, including the removal of existing overhead lines and supports.Work No. OH2
12-02Installation of a high-pressure gas pipeline; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. G4 and OH1
12-05 and 12-07Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach.Work No. CA3
12-06Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; provision for access for overhead lines diversion works.Works Nos. MU20 and OH1
12-08, 12-09, 12-12, 12-14, 12-15, 12-17, 12-18 and 12-19Provision for temporary access and traffic management for the temporary construction compound facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. CA3 and MU20
12-13 and 12-16Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU20
12-20Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and supports.Works Nos. MU20 and OH2
12-21, 12-22, 12-23, 12-24, 12-25, 12-26, 12-27, 12-28, 12-29, 12-30, 12-31, 12-32, 12-33, 12-34, 12-35, 12-36, 12-37, 12-38, 12-39, 12-40, 12-41, 12-42, 12-43, 12-44, 12-45, 12-46, 12-47, 12-48, 12-49, 12-50, 12-51, 12-52, 12-53, 12-54, 12-55, 12-56, 12-57, 12-58, 12-59, 12-60, 12-61, 12-62, 12-63, 12-64, 12-65, 12-66 and 12-67Provision for temporary access and traffic management for the temporary construction compound facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach.Work No. CA3
13-04 and 13-05Construction of a new public right of way, including the upgrade of a section of the existing footpath NG7 from the new public right of way between the existing Thong Lane to the new Thong Lane bridge over the A122 Lower Thames Crossing and Thong Lane; and temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach.Works Nos. 3N and CA3
13-06, 13-07, 13-11, 13-22, 13-66, 13-69, 13-81 and 13-88Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach.Work No. CA3
13-12Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MU23 and MUT3
13-13, 13-14, 13-15, 13-16, 13-17 and 13-18Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU23
13-19, 13-21, 13-24, 13-25, 13-26, 13-27, 13-28, 13-29, 13-30, 13-31, 13-32, 13-33, 13-34, 13-40 and 13-45Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MUT3
13-20 and 13-42Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. CA3 and MUT3
13-38, 13-41 and 13-50Construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal in Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach.Works Nos. 4A and CA3
13-46Construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal in Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. 4A, CA3, MU20, MU22, MU24 and MUT3
13-47Construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal in Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. 4A, CA3, MU20, MU24 and MUT3
13-48Construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal in Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. 4A, CA3, MU24 and MUT3
13-53, 13-60, 13-61 and 13-62Construction of a public right of way, including the upgrade of a section of existing footpath NG8 between the new public right of way from Thong Lane bridge over the A122 Lower Thames Crossing to NG7 and the A226; and temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach; provision for temporary access for overhead lines diversion works.Works Nos. 3P, CA3 and OH1
13-54, 13-55, 13-56, 13-70 and 13-71Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. CA3 and MU20
13-63, 13-72, 13-85, 13-89 and 13-90Provision for temporary access and traffic management for the temporary construction compound facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. CA3 and MU20
13-65Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach Installation of a high-pressure gas pipeline; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. CA3, G4 and OH1
13-67Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach Installation of a high-pressure gas pipeline; provision for temporary access for overhead lines diversion works.Works Nos. CA3, G4 and OH1
13-68 and 13-77Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach To facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space.Works Nos. CA3 and OH1
13-73 and 13-76Overhead lines diversion works, including the removal of existing overhead lines and supports.Work No. OH2
13-74 and 13-75Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. CA3 and OH1
13-78To facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space.Work No. OH1
13-79Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach; provision for access for overhead lines diversion works.Works Nos. CA3 and OH1
14-01Provision for temporary outfall of drainage from temporary satellite construction compound to existing ditch; and implementation of temporary environmental works to create a compensatory habitat site.Works Nos. 4C and ET1
14-02 and 14-03Provision for temporary outfall of drainage from temporary satellite construction compound to existing ditch.Work No. 4C
14-11Construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal in Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and construction of a new permanent ground protection tunnel and access shafts to undertake ground treatment works above the new A122 Lower Thames Crossing tunnel ; and temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach Temporary satellite construction compound at surface for facilitating main works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. 4A, 4B, CA3, CA3A, MU25, MU26 and MUT3
14-16, 14-17 and 14-18Construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal in Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and construction of a new permanent ground protection tunnel and access shafts to undertake ground treatment works above the new A122 Lower Thames Crossing tunnel; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. 4A, 4B and MU26
14-19 and 14-20Temporary satellite construction compound at surface for facilitating main works.Work No. CA3A
15-01, 15-09, 15-21, 15-22 and 15-23Temporary satellite construction compound at surface for facilitating main works.Work No. CA3B
15-02Provision for temporary access and traffic management for the temporary construction compound facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach.Work No. CA3B
15-03, 15-04, 15-05, 15-06 and 15-07Provision for repairs to existing culvert.Work No. CA3B
15-08Implementation of temporary environmental works to create a compensatory habitat site.Work No. ET1
15-17, 15-18 and 15-19Construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal in Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and construction of a new permanent ground protection tunnel and access shafts to undertake ground treatment works above the new A122 Lower Thames Crossing tunnel Temporary satellite construction compound at surface for facilitating main works.Works Nos. 4A, 4B and CA3B
16-02, 16-04, 16-05, 16-10, 16-11, 16-12, 16-17, 16-18, 16-19, 16-20, 16-21, 16-30, 16-31 and 16-32Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. CA5, MU27 and MUT4
16-03, 16-06, 16-07, 16-08, 16-09, 16-13, 16-14, 16-15, 16-16, 16-23, 16-24, 16-25, 16-26, 16-27, 16-28, 16-29, 16-33, 16-34, 16-35 and 16-40Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory.Work No. CA5
16-22Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and utility works, including the installation of a substation to power the tunnel boring machine at the northern portal.Works Nos. CA5, MU27, MUT4 and MUT5
16-44, 16-60, 16-62 and 16-63Construction of a new outfall from the north portal of the A122 Lower Thames Crossing to the River Thames; construction a new public right of way along the existing footpath FP146; temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory.Works Nos. 5A, 5O and CA5
16-47, 16-64, 16-67 and 16-69Provision for temporary outfall of drainage to the River Thames from the north portal of the A122 Lower Thames Crossing.Work No. 5A
16-49, 16-54, 16-55, 16-56, 16-57, 16-58 and 16-59Construction of a new outfall from the north portal of the A122 Lower Thames Crossing to the River Thames; and temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory.Works Nos. 5A and CA5
16-62 and 16-63Construction of a new outfall from the north portal of the A122 Lower Thames Crossing to the River Thames; construction a new public right of way along the existing footpath FP146; temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory.Works Nos. 5A, 5O and CA5
16-65 and 16-66Provision for temporary access and traffic management for temporary construction compound facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach.Work No. CA5
16-68Construction of a new outfall from the north portal of the A122 Lower Thames Crossing to the River Thames.Work No. 5A
16-70Construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal in Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; construction of a new public right of way along the existing footpath FP146 and temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory.Works Nos. 4A, 5O and CA5
17-01, 17-02, 17-03, 17-04, 17-05 and 17-06Provision for temporary access and traffic management for temporary construction compound facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach.Work No. CA5
17-08 and 17-09Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory.Work No. CA5
18-01, 18-02, 18-03, 18-04, 18-05, 18-06, 18-07, 18-08, 18-09 and 18-10Provision for temporary access and traffic management for temporary construction compound facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach.Work No. CA5
19-02, 19-14 and 19-35Provision for temporary access for environmental mitigation works to create a site for protected species.Work No. E15
19-04, 19-06, 19-08, 19-10, 19-11, 19-15, 19-16, 19-21, 19-22, 19-26, 19-27 and 19-28To facilitate the construction of a new public right of way along the eastern section of FP200, and to provide temporary storage, laydown areas and working space.Work No. 5R
19-05Implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure.Work No. E17
19-36Construction of a new public right of way along the eastern section of FP200 and a new public right of way between Coalhouse Fort and FP200.Work No. 5R
19-37Construction of a new water inlet with self-regulating valve.Work No. 5X
19-38Construction of a new public right of way along the eastern section of FP200.Work No. 5R
20-01 and 20-13Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU27
20-02, 20-03, 20-04, 20-05, 20-26, 20-27, 20-29, 20-30, 20-31, 20-33, 20-34, 20-35, 20-36, 20-37, 20-38, 20-39, 20-40, 20-43, 20-44, 20-46, 20-54, 20-71, 20-72, 20-90, 20-91, 20-92, 20-93, 20-95 and 20-97Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory.Work No. CA5
20-06, 20-07, 20-08 and 20-09Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. CA5, MU27 and MUT4
20-10, 20-12, 20-15, 20-16, 20-17, 20-28 and 20-32Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Work No. OH3
20-11, 20-23, 20-24 and 20-25Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. CA5 and OH3
20-14Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. MU27 and OH4
20-18Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. CA5, MU28, OH3 and OH4
20-19 and 20-20Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Work No. OH4
20-21 and 20-22Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. MU28 and OH4
20-41Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. CA5, MU27, MU29, MUT7, MUT8 and MUT9
20-42Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and utility works, including the installation of a substation to power the tunnel boring machine at the northern portal.Works Nos. CA5, MU27, MUT4 and MUT5
20-47, 20-48, 20-49, 20-50, 20-55, 20-56, 20-57 and 20-61Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. CA5 and MU27
20-75 and 20-76Construction of a new public rights of way along the existing footpath FP200; temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. 5U, CA5 and MU27
20-87 and 20-102To facilitate the construction of a new public right of way along the eastern section of FP200, and to provide temporary storage, laydown areas and working space.Work No. 5R
20-99Construction of a new outfall from the north portal of the A122 Lower Thames Crossing to the River Thames; and temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory.Works Nos. 5A and CA5
21-01, 21-02, 21-03, 21-04, 21-05, 21-06, 21-07, 21-08, 21-09, 21-11, 21-12 and 21-37Provision for temporary access and traffic management for temporary construction compound facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach.Work No. CA5
21-13, 21-15, 21-16, 21-17, 21-23, 21-25, 21-26, 21-28 and 21-29Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU27
21-14 and 21-20Provision for temporary access and traffic management for temporary construction compound facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. CA5 and MU27
21-18, 21-19, 21-27, 21-30 and 21-31Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory.Work No. CA5
21-24Provision for temporary access and traffic management for temporary construction compound facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. CA5, MU27 and MUT4
21-32 and 21-34Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach.Work No. CA5
21-33, 21-35 and 21-36Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. CA5, MU27 and MUT4
22-01, 22-11, 22-13, 22-19, 22-21, 22-22, 22-23, 22-24, 22-35, 22-39, 22-47, 22-48, 22-56, 22-57, 22-58, 22-60, 22-61, 22-62, 22-63, 22-64, 22-65, 22-66, 22-67, 22-68, 22-69, 22-70, 22-71, 22-73, 22-74, 22-75, 22-76, 22-78, 22-79, 22-80, 22-81, 22-82, 22-83, 22-84, 22-85, 22-86, 22-87, 22-88, 22-89, 22-90 and 22-91Provision for temporary access for environmental mitigation works to create a site for protected species.Work No. E16
22-02, 22-15 and 22-18To facilitate utility works, and to provide temporary storage, laydown areas and working space.Work No. MUT6
22-03, 22-07, 22-09, 22-12, 22-16, 22-17, 22-20 and 22-116Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory.Work No. CA5
22-04, 22-05, 22-06, 22-08, 22-10 and 22-14Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. CA5 and MUT6
22-25, 22-27, 22-29, 22-30, 22-31, 22-32, 22-34 and 22-37Provision for temporary access for environmental mitigation works to create a site for protected species; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. E16 and MUT11
22-33, 22-36, 22-38, 22-41, 22-42, 22-43, 22-44, 22-49, 22-50, 22-51, 22-52, 22-53, 22-54 and 22-55Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MUT11
23-01, 23-02, 23-03, 23-04, 23-05, 23-06, 23-07, 23-08, 23-09, 23-10, 23-11, 23-12, 23-13, 23-14, 23-15, 23-18 and 23-170Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU29
23-16Implementation of environmental mitigation works to create a site for protected species; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. E18 and MU29
23-17 and 23-20Provision for access for environmental mitigation works to create a site for protected species.Work No. E18
23-21 and 23-22Implementation of environmental mitigation works to create a site for protected species.Work No. E18
23-23 and 23-38Temporary possession of railway to facilitate the construction of the new A122 Lower Thames Crossing between the north portal and northern end of Tilbury viaduct.Work No. CA5
23-24, 23-25, 23-110, 23-112, 23-123, 23-127, 23-138, 23-142, 23-143 and 23-146Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU27
23-26 and 23-28Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. MU27 and OH4
23-29Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. MU27, MU28 and OH4
23-30Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory. Temporary satellite construction compound at surface for facilitating main works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. Installation of a high-pressure gas pipeline.Works Nos. CA5, CA5A, MU27, MU28, MU29, MU30, MUT7, MUT8, MUT9, OH3, OH4 and TFGP1
23-32, 23-182, 23-183, 23-184, 23-185 and 23-186Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MUT8
23-33Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MU28, MU29 and MUT8
23-35To facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space.Work No. OH5
23-39, 23-40 and 23-42Provision for temporary access and traffic management for temporary construction compound facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach.Work No. CA5
23-41, 23-46 and 23-48Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Work No. OH5
23-43, 23-119, 23-124, 23-126, 23-155, 23-159, 23-166, 23-167 and 23-174Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory.Work No. CA5
23-44, 23-45, 23-49, 23-53, 23-55 and 23-58Provision for access for overhead lines diversion works.Work No. OH4
23-47Modification of an existing irrigation reservoir and the diversion and modification of irrigation infrastructure, including possible provision of a new groundwater abstraction well; construction of a new flood compensation area; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. 5K, FCA1, MU33 and OH4
23-50Construction of a new flood compensation area; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons; and the establishment of a temporary utilities logistic hub for facilitating utility works.Works Nos. FCA1, MU33, OH4, OH5, OHT2 and ULH12
23-52Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory Temporary satellite construction compound at surface for facilitating main works.Works Nos. CA5 and CA5A
23-54, 23-56, 23-60, 23-66, 23-67, 23-69 and 23-71Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Work No. OH4
23-57Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. MU33 and OH4
23-59 and 23-62Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU28
23-61Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. MU28, MU33 and OH4
23-63 and 23-65Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. MU27, MU28, MU30, MUT9 and OH4
23-64Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. MU27, MU28, MU30, MU32, MUT9 and OH4
23-72Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. MU28, OH3 and OH4
23-76Modification of an existing irrigation reservoir and the diversion and modification of irrigation infrastructure, including possible provision of a new groundwater abstraction well; construction of a new flood compensation area; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. 5K, FCA1, MU28, MU33 and OH3
23-88, 23-90 and 23-91Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. MU28 and OH3
23-95Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. MU28, MU30, MU31, MU32 and OH3
23-97Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. MU30 and OH3
23-115, 23-116 and 23-180To facilitate utility works, and to provide temporary storage, laydown areas and working space.Work No. MU28
23-100Temporary possession of railway to facilitate the construction of the new A122 Lower Thames Crossing between the north portal and northern end of Tilbury viaduct To facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space.Works Nos. CA5 and OH3
23-101 and 23-111Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory. To facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space.Works Nos. CA5 and OH3
23-104, 23-105, 23-107, 23-109, 23-178 and 23-179Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU33
23-108 and 23-120Construction of a new public rights of way along the existing footpath FP200; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. 5U and MU27
23-114To facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space.Work No. OH3
23-122Provision for temporary access for utility works.Work No. MU27
23-125Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. CA5 and MU31
23-128, 23-129, 23-130, 23-132, 23-135, 23-136, 23-139, 23-150, 23-151, 23-153, 23-161 and 23-162Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. CA5 and MUT6
23-133 and 23-148Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. CA5, MU27, MUT10 and MUT6
23-154 and 23-157Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. CA5, MUT10 and MUT6
23-160To facilitate the construction of a new public right of way along the eastern section of FP200, and to provide temporary storage, laydown areas and working space.Work No. 5R
23-163, 23-164, 23-165 and 23-168Provision for temporary access for environmental mitigation works to create a site for protected species.Work No. E16
23-169, 23-175, 23-176 and 23-177Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MUT6
23-181Implementation of environmental mitigation works to create a site for protected species; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. E18, MU29 and MUT8
24-01, 24-03, 24-05, 24-160, 24-161, 24-162 and 24-163Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU35
24-06, 24-07 and 24-12Provision for access for utility works; provision for access for overhead lines diversion works.Works Nos. MU37, OH6 and OH7
24-08, 24-25, 24-30 and 24-32Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. MU37, OH6 and OH7
24-09, 24-164, 24-166, 24-167, 24-171, 24-172, 24-173, 24-175, 24-178, 24-180, 24-181, 24-183, 24-186, 24-187, 24-188, 24-189 and 24-190To facilitate the construction of a new bridge to carry the realigned Muckingford Road over the new A122 Lower Thames Crossing, and to provide temporary storage, laydown areas and working space.Work No. 6B
24-17, 24-22, 24-23, 24-27, 24-28, 24-29, 24-31 and 24-42Provision for access for overhead lines diversion works.Work No. OH5
24-24 and 24-26To facilitate utility works, and to provide temporary storage, laydown areas and working space.Work No. MU37
24-34Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. OH6 and OH7
24-43 and 24-49Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; provision for access for overhead lines diversion works.Works Nos. MU36 and OH5
24-45 and 24-62Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. MU34, MU36 and OH5
24-46, 24-56, 24-59, 24-68, 24-90, 24-126, 24-129 and 24-130Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU36
24-47, 24-48 and 24-74To facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space.Work No. OH5
24-53, 24-63, 24-67, 24-69, 24-80 and 24-81Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Work No. OH5
24-71Temporary possession of property, to facilitate the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU36
24-82Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons; and the establishment of a temporary utilities logistic hub for facilitating utility works.Works Nos. OH5 and ULH12
24-83, 24-92, 24-93, 24-98 and 24-99Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. OH3, OH4, OHT2 and OHT3
24-84Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. OH3, OH4 and OHT2
24-91Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. MU36, OH3, OH4 and OHT2
24-95Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. MU28, MU36, MUT6, OH3, OH4, OHT2 and OHT3
24-96, 24-103 and 24-105Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. MU36, OH4 and OHT2
24-100Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. MU28, MU36, OH3, OH4, OHT2 and OHT3
24-109Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. MU36, OH4, OHT2 and OHT3
24-112 and 24-113Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. MU34 and OH4
24-120, 24-121 and 24-123Construction of a new public right of way between the new public right of way underneath the Tilbury viaduct and footpath FP61; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. 5W and OH4
24-124Construction of a new public right of way between the new public right of way underneath the Tilbury viaduct and footpath FP61; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. 5W, MU28, OH3 and OH4
24-125 and 24-128To facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space.Work No. OH3
24-133, 24-192 and 24-193Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MUT6
24-136Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; provision for access for overhead lines diversion works.Works Nos. MU34, MU35, MU36, MUT6 and OH4
24-139To facilitate utility works, and to provide temporary storage, laydown areas and working space.Work No. MUT6
24-153Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU34
24-191Construction of a new public right of way between the new public right of way underneath the Tilbury viaduct and footpath FP61; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. 5W, MU28, MU34, MUT6, OH3 and OH4
24-194, 24-195, 24-196, 24-197, 24-198 and 24-199Construction of a new public right of way between the new public right of way underneath the Tilbury viaduct and footpath FP61.Work No. 5W
25-01, 25-02, 25-03, 25-04, 25-05, 25-06, 25-07, 25-08, 25-09, 25-10, 25-11, 25-12, 25-13, 25-14, 25-15, 25-16, 25-17, 25-18, 25-19, 25-20, 25-21, 25-22, 25-23, 25-24, 25-25, 25-26, 25-27, 25-28, 25-29, 25-30, 25-31, 25-32, 25-33, 25-34, 25-35, 25-36, 25-37, 25-38, 25-39, 25-40, 25-41, 25-42, 25-43, 25-44, 25-45, 25-46, 25-47, 25-48, 25-49, 25-50, 25-51, 25-52, 25-53, 25-54, 25-55, 25-56, 25-57, 25-58, 25-59, 25-60, 25-61, 25-62, 25-63, 25-64, 25-65, 25-66, 25-67, 25-68, 25-69, 25-70, 25-71, 25-72, 25-73, 25-74, 25-75, 25-76, 25-77, 25-78, 25-81, 25-82, 25-83, 25-84, 25-85, 25-86, 25-87, 25-88, 25-89, 25-90, 25-91 and 25-92Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MUT14
25-79 and 25-80To facilitate utility works, and to provide temporary storage, laydown areas and working space.Work No. MUT14
25-93, 25-95, 25-98, 25-99, 25-101, 25-102, 25-106, 25-109 and 25-111Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU35
26-17, 26-18, 26-19, 26-20, 26-21, 26-22, 26-23, 26-25, 26-26, 26-27, 26-28, 26-29, 26-30, 26-31, 26-32, 26-33, 26-35, 26-36, 26-37, 26-38, 26-39, 26-40, 26-41, 26-42, 26-44, 26-45, 26-46, 26-47, 26-48, 26-49, 26-50, 26-51, 26-52, 26-53, 26-54, 26-55, 26-56, 26-57, 26-58, 26-59, 26-60, 26-61, 26-62, 26-63, 26-64, 26-65 and 26-66Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MUT14
26-24, 26-34 and 26-43To facilitate utility works, and to provide temporary storage, laydown areas and working space.Work No. MUT14
27-01Implementation of environmental mitigation works to create a site for protected species.Works Nos. E21 and E22
27-02, 27-09, 27-11 and 27-12Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. MU37, OH6 and OH7
27-06 and 27-16Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. OH6 and OH7
27-07To facilitate utility works, and to provide temporary storage, laydown areas and working space.Work No. MU37
27-25, 27-27, 27-36, 27-37, 27-38 and 27-39Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU37
27-35To facilitate the construction new highway, three-lane dual carriageway, and to provide temporary storage, laydown areas and working space; provision for temporary access for overhead lines diversion works.Works Nos. 6C and OH5
27-40, 27-49, 27-52, 27-55, 27-56, 27-65 and 27-72Provision for temporary access for overhead lines diversion worksWork No. OH5
27-41, 27-42, 27-44, 27-51, 27-53 and 27-54Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Work No. OH5
27-45, 27-47, 27-48, 27-50, 27-57, 27-58, 27-59, 27-60, 27-61 and 27-62Implementation of environmental mitigation works to create a site for protected species.Work No. E21
27-66To facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space.Work No. OH4
27-67, 27-68, 27-69, 27-71, 27-74, 27-75, 27-76, 27-80, 27-82, 27-96 and 27-101Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Work No. OH4
27-70Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons; provision for temporary access for overhead lines diversion works.Works Nos. OH4 and OH5
27-77, 27-78, 27-79, 27-81, 27-83, 27-84, 27-86, 27-88, 27-89, 27-91, 27-92, 27-93, 27-94, 27-95, 27-98, 27-99, 27-100, 27-102 and 27-103Provision for access for overhead lines diversion works.Work No. OH4
28-01Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons; and the establishment of a temporary utilities logistic hub for facilitating utility works.Works Nos. MU47, MUT16, MUT18, OH6, OH7, OHT4, OHT5 and ULH9
28-02Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MU47, MU48 and MUT16
28-03, 28-13 and 28-15Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. MU47, MUT16, MUT18, OH6 and OHT5
28-04Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. MU47, MU48, MUT16, MUT18, OH6 and OHT5
28-05Construction of a new Hornsby Lane turning heads to the north of the new A122 Lower Thames Crossing, including improvement to Hornsby Lane; and temporary construction compound at surface for facilitating main works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. 7S, CA7, MU40, MU41, MU47, MUT13, MUT16, MUT17 and MUT18
28-06Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. MU47, MUT16, MUT18, OH6, OH7, OHT4 and OHT5
28-08Temporary construction compound at surface for facilitating main works; implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. CA7, E28 and MU41
28-09Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. MU47, MU48, MUT16, MUT18, OH6, OH7 and OHT5
28-11Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. MU47, MU48, MUT16, MUT18 and OHT5
28-12Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MU47, MU48, MUT16 and MUT18
28-14Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MU47, MUT16 and MUT18
28-16The establishment of a temporary utilities logistic hub for facilitating utility works.Work No. ULH9
28-21Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. MU47, OH6 and OHT5
28-27 and 28-30Construction of a new Hornsby Lane turning heads to the north of the new A122 Lower Thames Crossing, including improvement to Hornsby Lane; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. 7S, MU41 and MU47
28-31Construction of a new private means of access from the new Hornsby Lane turning head north of the new A122 Lower Thames Crossing to Heath Place.Work No. 7S
28-34, 28-58, 28-104 and 28-107To facilitate utility works, and to provide temporary storage, laydown areas and working space.Work No. MU40
28-35Construction of a new private means of access from the new Hornsby Lane turning head north of the new A122 Lower Thames Crossing to Heath Place; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. 7S, MU41 and MU47
28-37 and 28-39Construction of a new Hornsby Lane turning heads to the north of the new A122 Lower Thames Crossing, including improvement to Hornsby Lane; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. 7S and MU47
28-38, 28-98, 28-100 and 28-103Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MU40 and MUT13
28-42Temporary construction compound at surface for facilitating main works; implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. CA6, E27, MU41 and MU47
28-43To facilitate utility works, and to provide temporary storage, laydown areas and working space.Work No. MU47
28-45 and 28-46Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU41
28-47 and 28-63Temporary construction compound at surface for facilitating main works.Work No. CA6
28-49, 28-52, 28-53, 28-54, 28-56, 28-57, 28-59, 28-61, 28-69, 28-70, 28-71, 28-72 and 28-73Utility works, including the installation or diversion of underground utilities within a multi-utility corridorWork No. MUT14
28-50 and 28-51Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MU39 and MUT14
28-60Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. MU40, MUT13, OH6 and OH7
28-62Temporary construction compound at surface for facilitating main works; and the establishment of a temporary utilities logistic hub for facilitating utility works.Works Nos. CA6 and ULH10
28-64Temporary construction compound at surface for facilitating main works; implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. CA6, E27 and MU41
28-65 and 28-68Construction of a new public right of way between the new bridge to carry the new public right of way over the new A122 Lower Thames Crossing and the realigned A1013 Stanford Road.Work No. 7X
28-67Construction of a new private means of access from the improved Brentwood Road; and temporary construction compound at surface for facilitating main works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and the establishment of a temporary utilities logistic hub for facilitating utility works.Works Nos. 7B, CA6, MU40, MU41, MUT12, MUT13, MUT15 and ULH10
28-106Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. MU38, MU40, OH6 and OH7
28-124Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. G5, MU39, MU40, MUT12 and MUT15
28-125Utility works, including the installation or diversion of underground utilities within a multi-utility corridorWorks Nos. MU39, MU40 and MUT12
28-127Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MU40 and MUT12
28-128Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. G5, MU40 and MUT12
28-129Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MU39 and MU40
28-131Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MU39, MU40 and MUT15
28-132Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. G5, MU39, MU40 and MUT15
28-133Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MU39 and MUT15
28-134Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MU40, MU41 and MUT12
28-135Provision for access for utility works.Work No. MU40
28-137Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MU38 and MUT12
28-139 and 28-141Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU38
28-143Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. OH6 and OH7
28-144Installation of a high-pressure gas pipeline.Work No. G5
28-145To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space.Work No. G5
29-03Temporary construction compound at surface for facilitating main works; implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. CA8A, E30, MU54, MU55, MU56, MUT20, OH6, OH7 and OHT6
29-04Implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. E30, MU55, MU56, MUT20, OH6 and OH7
29-05The establishment of a temporary utilities logistic hub for facilitating utility works.Work No. ULH8
29-10Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU56
29-11Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. MU55, MU56, MUT16, OH6, OH7 and OHT6
29-13Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. MU56, OH6 and OHT6
29-17Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. MU55, MU56, MUT16, MUT20, OH6, OH7 and OHT6
29-20Temporary construction compound at surface for facilitating main works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. CA8A, MU55, MU56, MUT16, MUT20, OH6, OH7 and OHT6
29-26Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Work No. OH6
29-29, 29-33, 29-39 and 29-51To facilitate utility works, and to provide temporary storage, laydown areas and working space.Work No. MU44
29-31Overhead lines diversion works, including the removal of existing overhead lines and pylons.Works Nos. OH6 and OH7
29-49Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. MU47, MU55, MUT16, MUT20, OH6 and OH7
29-61, 29-62, 29-63 and 29-65Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MU52 and MUT13
29-113Improvements to Woolings Close.Work No. 7G
29-115Improvements to Woolings Close; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. 7G and MU53
29-140 and 29-211Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU53
29-202 and 29-205Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU50
29-212 and 29-215Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Work No. OH7
29-213Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. MU47, MU49, MUT16, OH6 and OH7
29-231, 29-238 and 29-242Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. MU47, MU49, MUT16, MUT18, OH6 and OH7
29-236 and 29-237Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. MU49 and OH7
29-245, 29-251 and 29-256To facilitate the construction of a realigned section of Rectory Road, and to provide temporary storage, laydown areas and working space.Work No. 7J
29-247Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MU49 and MUT18
29-248Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. MU47, MU48, MUT16, MUT18, OH6, OH7, OHT4 and OHT5
29-249 and 29-250Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU49
29-258 and 29-268Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MU41 and MUT13
29-262 and 29-267Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MU47 and MUT16
29-263 and 29-266Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU47
29-264Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU46
29-277Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. OH6, OH7, OHT4 and OHT5
29-282Implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. E30 and MU57
29-283Implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. E30, MU54, MU55, MU57, MUT20 and OH6
30-01, 30-02, 30-04, 30-05, 30-06, 30-07, 30-08, 30-09, 30-10 and 30-11Provision for temporary access and traffic management for the temporary construction compound; and provision for access for environmental mitigation works to create a site for protected species; provision for temporary access for overhead lines diversion works.Works Nos. CA13, E38, OH6 and OH7
30-12, 30-14, 30-17, 30-19, 30-20, 30-21, 30-22, 30-23, 30-24, 30-25, 30-26, 30-27, 30-28, 30-29, 30-30, 30-31, 30-32, 30-33, 30-34, 30-35, 30-36, 30-37, 30-38, 30-39, 30-40, 30-41, 30-42, 30-43, 30-44, 30-45, 30-46, 30-47, 30-48, 30-49, 30-50, 30-51, 30-52, 30-53, 30-54, 30-55, 30-56, 30-57, 30-58, 30-59, 30-60, 30-61, 30-62, 30-63, 30-64, 30-65, 30-66, 30-67, 30-68, 30-69, 30-71, 30-72 and 30-73Provision for temporary access and traffic management for the temporary construction compound.Work No. CA9
30-74, 30-75, 30-76, 30-77, 30-78, 30-79 and 30-80Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MUT23
31-02, 31-08, 31-09, 31-13, 31-18 and 31-19To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space.Work No. G6
31-05 and 31-06To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space; and the establishment of a temporary utilities logistic hub for facilitating utility works.Works Nos. G6 and ULH6
31-07 and 31-11Installation of a high-pressure gas pipeline.Work No. G6
31-10, 31-14, 31-16, 31-17, 31-20, 31-21 and 31-22Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU42
31-15Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. G6 and MU42
32-05 and 32-18Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU46
32-07, 32-12, 32-13, 32-14, 32-57, 32-66, 32-92, 32-102, 32-115, 32-117, 32-119, 32-134, 32-137, 32-147, 32-149, 32-152 and 32-186To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space.Work No. G6
32-11, 32-15, 32-16 and 32-17Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. G6 and MU46
32-25Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MU46, MU47 and MUT17
32-33, 32-35 and 32-36Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU47
32-39, 32-44, 32-48, 32-55, 32-135, 32-157, 32-164 and 32-169Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU43
32-49Construction of a new public right of way between the new bridge to carry the new public right of way over the new A122 Lower Thames Crossing and the realigned A1013 Stanford Road; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. 7X, MU41 and MU43
32-53To facilitate utility works, and to provide temporary storage, laydown areas and working space.Work No. MU41
32-58 and 32-59To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. G6 and MU45
32-61To facilitate utility works, and to provide temporary storage, laydown areas and working space.Work No. MU43
32-63Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. G6, MU45 and MUT19
32-78, 32-81 and 32-85Construction of a new public right of way between the new bridge to carry the new public right of way over the new A122 Lower Thames Crossing and the realigned A1013 Stanford Road.Work No. 7X
32-84Construction of a new public right of way between the new bridge to carry the new public right of way over the new A122 Lower Thames Crossing and the realigned A1013 Stanford Road; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. 7X and MU43
32-91Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MU43 and MUT19
32-93Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. G6 and MUT19
32-103, 32-116, 32-118, 32-120, 32-130, 32-138, 32-143 and 32-144Installation of a high-pressure gas pipeline.Work No. G6
32-104Provision for temporary access for works involving the installation of a high-pressure gas pipeline.Work No. G6
32-109To facilitate the improvement to the existing dual carriageway A13, and to provide temporary storage, laydown areas and working space.Work No. 7F
32-110Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MUT19
32-111, 32-122, 32-124, 32-125, 32-128, 32-129 and 32-133Provision for access for works involving the installation of a high-pressure gas pipeline.Work No. G6
32-136Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MU39, MU43 and MUT15
32-139, 32-140, 32-141, 32-142, 32-145, 32-148, 32-155, 32-159, 32-160, 32-168, 32-170, 32-171, 32-172, 32-173, 32-174 and 32-179Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MU39 and MUT15
32-153, 32-158 and 32-166Provision for access for works involving the diversion of existing gas pipeline.Work No. G6b
32-156 and 32-163Installation of a isolation valveWork No. G6b
32-162, 32-165, 32-175, 32-176, 32-180 and 32-181Provision for temporary access for works involving the diversion of existing gas pipeline.Work No. G6b
32-177 and 32-178Provision for access for environmental mitigation works to create a site for protected species.Work No. E22
32-182 and 32-183To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space; and the establishment of a temporary utilities logistic hub for facilitating utility works.Works Nos. G6 and ULH6
33-01 and 33-03Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and provision for temporary access for overhead lines diversion works.Works Nos. MUT24, OH6 and OH7
33-02 and 33-08Provision for temporary access and traffic management for the temporary construction compound; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. CA9, MU60 and MUT23
33-05Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. G6, MU55, MUT13, MUT24, OH6, OH7 and OHT7
33-06, 33-92, 33-179, 33-242, 33-249, 33-254, 33-255, 33-257, 33-259, 33-263, 33-265, 33-268, 33-276, 33-280, 33-281, 33-282 and 33-285To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space.Work No. G6
33-17Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. OH6, OH7 and OHT7
33-19To facilitate utility works, and to provide temporary storage, laydown areas and working space.Work No. MU57
33-24Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MUT23
33-30Temporary construction compound at surface for facilitating main works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons; and the establishment of a temporary utilities logistic hub for facilitating utility works.Works Nos. CA9, MU55, MU57, MU58, OH6, OH7 and ULH7
33-35Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. MU54, MU55, MU57, MUT20 and OH6
33-36Temporary construction compound at surface for facilitating main works; implementation of environmental mitigation works to create a site for protected species; and installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. CA10, E34, G6, MU55, MU60, MUT13, MUT21 and MUT22
33-37Temporary construction compound at surface for facilitating main works. To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space.Works Nos. CA10 and G6
33-42To facilitate the construction of a new private means of access for maintenance of the new drainage structures and to provide temporary storage, laydown areas and working space.Work No. 8K
33-47, 33-48, 33-49, 33-53, 33-54, 33-55, 33-56, 33-61, 33-82, 33-83, 33-84, 33-93, 33-94, 33-100, 33-101, 33-104, 33-106, 33-108, 33-115, 33-116, 33-118, 33-154, 33-155, 33-173, 33-178, 33-184, 33-188 and 33-221Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MUT22
33-66Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MU59 and MUT13
33-67Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MU59 and MU60
33-68 and 33-70Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MUT21
33-69, 33-71, 33-77, 33-78, 33-79, 33-80 and 33-81Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MU59, MU60 and MUT21
33-74 and 33-75To facilitate the construction of a realigned section of Stifford Clays road, and to provide temporary storage, laydown areas and working space.Work No. 7L
33-86, 33-88 and 33-89Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. G6 and MUT22
33-87Implementation of environmental mitigation works to create a site for protected species; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. E33 and MUT22
33-90, 33-91, 33-99, 33-103, 33-105, 33-107, 33-114, 33-119, 33-129, 33-134, 33-146, 33-152, 33-157, 33-158, 33-159, 33-160, 33-162, 33-165, 33-168, 33-169, 33-170, 33-172, 33-174, 33-176, 33-177, 33-181, 33-183, 33-187, 33-190, 33-192, 33-195, 33-196, 33-197, 33-199, 33-200, 33-202, 33-203, 33-205, 33-206, 33-208, 33-209, 33-210, 33-211, 33-212, 33-215, 33-217, 33-219, 33-220, 33-222, 33-225, 33-227, 33-228, 33-230, 33-231, 33-232, 33-233, 33-236, 33-238, 33-239, 33-240, 33-241, 33-243, 33-244, 33-245, 33-246, 33-247, 33-251, 33-252, 33-256, 33-258, 33-260, 33-261, 33-267, 33-269, 33-271, 33-272, 33-274, 33-275, 33-279, 33-283, 33-284, 33-286 and 33-287Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MU60 and MUT21
33-98Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MUT13
33-109, 33-113, 33-117, 33-120, 33-121, 33-122, 33-123, 33-124, 33-125, 33-126, 33-127, 33-128, 33-130, 33-131, 33-132, 33-133, 33-135, 33-136, 33-137, 33-138, 33-139, 33-140, 33-141, 33-142, 33-143, 33-144, 33-145, 33-147, 33-148, 33-149, 33-150, 33-151, 33-153, 33-156, 33-161, 33-163, 33-164, 33-166, 33-167, 33-171, 33-180, 33-185 and 33-186Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU52
33-110 and 33-112Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MU52, MU60, MUT21 and MUT22
33-175, 33-248, 33-250, 33-266, 33-270, 33-273 and 33-277Installation of a high-pressure gas pipeline.Work No. G6
33-182, 33-189 and 33-191Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MU52 and MUT13
33-194 and 33-229Implementation of environmental mitigation works to create a site for protected species.Work No. E32
33-201 and 33-207Improvements to Woolings Close.Work No. 7G
33-224, 33-226, 33-234, 33-235 and 33-237Provision for temporary access for works involving the installation of a high-pressure gas pipeline.Work No. G6
33-253, 33-262 and 33-264Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. G6, MU60 and MUT21
33-278Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. G6 and MU46
33-290Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU46
34-01, 34-03 and 34-05Provision for temporary access and traffic management for the temporary construction compound; provision for access for environmental mitigation works to create a site for protected species; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and provision for temporary access, including the installation or diversion of underground utilities within a multi-utility corridor; and provision for temporary access for overhead lines diversion works.Works Nos. CA13, E38, MUT24, OH6 and OH7
34-02, 34-24 and 34-42Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MUT24
34-04Provision for temporary access and traffic management for the temporary construction compound.Work No. CA13
34-06, 34-15, 34-17, 34-19, 34-23, 34-25, 34-26, 34-41, 34-43, 34-47 and 34-48Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and provision for temporary access for overhead lines diversion works.Works Nos. MUT24, OH6 and OH7
34-20To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space; and the establishment of a temporary utilities logistic hub for facilitating utility works.Works Nos. G6 and ULH5
34-27 and 34-28To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space; provision for temporary access to the temporary utilities logistic hub.Works Nos. G6 and ULH5
34-29, 34-32 and 34-46To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space.Work No. G6
34-30, 34-31 and 34-45Installation of a high-pressure gas pipeline.Work No. G6
34-33, 34-38, 34-39 and 34-40Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MUT23
34-44Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MU60 and MUT23
35-01, 35-03 and 35-07Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MUT24
35-02Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Work No. OH7
35-05, 35-06, 35-19, 35-20, 35-21, 35-53, 35-54 and 35-56Implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds.Work No. E36
35-09 and 35-55Implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds. Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. E36 and OH7
35-13Implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds; construction of a new flood compensation area. Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. E36, FCA3 and OH7
35-29 and 35-30Temporary construction compound at surface for facilitating main works.Work No. CA11
35-32Temporary construction compound at surface for facilitating main works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. CA11, MUT13, MUT22 and MUT25
35-33Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MUT22 and MUT25
35-34 and 35-35Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MUT25
35-36, 35-42, 35-58, 35-59 and 35-61Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MUT22
36-01Implementation of environmental mitigation works to create a site for protected species.Work No. E38
36-02Provision for temporary access and traffic management for the temporary construction compound; and provision for access for environmental mitigation works to create a site for protected species; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. CA13, E38 and MUT24
36-03Provision for access for environmental mitigation works to create a site for protected species.Work No. E38
36-04Provision for temporary access and traffic management for the temporary construction compound.Work No. CA13
36-05Provision for temporary access and traffic management for the temporary construction compound; and provision for access for environmental mitigation works to create a site for protected species.Works Nos. CA13 and E38
36-06Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MUT24
37-05Implementation of environmental mitigation works to create a site for protected species.Works Nos. E37 and E39
37-06 and 37-07Provision for access for environmental mitigation works to create a site for protected species.Works Nos. E37 and E39
38-01Construction of a new public right of way between the new bridge to carry the realigned footpath FP136 and the new bridge to carry the realigned North Road; and temporary construction compound at surface for facilitating main works; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. 8M, CA13, MU64, MU65, MUT26 and MUT27
38-02 and 38-10Temporary construction compound at surface for facilitating main works.Work No. CA13
38-03Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MU64 and MUT27
38-09To facilitate utility works, and to provide temporary storage, laydown areas and working space.Work No. MU65
38-13Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU65
38-14 and 38-24Provision for temporary access and traffic management for the temporary construction compound; and implementation of environmental mitigation works to create a site for protected species.Works Nos. CA13 and E40
38-15Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU64
38-16Provision for temporary access and traffic management for the temporary construction compound.Work No. CA13
38-18To facilitate the construction of a new public right of way over the new A122 Lower Thames Crossing, and to provide temporary storage, laydown areas and working space.Work No. 8C
38-19To facilitate the construction of a new drainage attenuation pond with associated drainage facilities, laydown areas and working space.Work No. 8H
38-20Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU63
38-22Construction of a new public right of way between the public right of way along the Mardyke channel and the new bridge to carry the realigned footpath FP136; and diversion of existing gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. 8M, G8, MU63 and OH7
38-23To facilitate the construction of a new public right of way and to provide temporary storage, laydown areas and working space.Work No. 8M
38-25Construction of a new public right of way between the public right of way along the Mardyke channel and the new bridge to carry the realigned footpath FP136; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. 8M and OH7
38-28 and 38-29Construction of a new public right of way between the public right of way along the Mardyke channel and the new bridge to carry the realigned footpath FP136.Work No. 8M
38-31Diversion of existing gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. G8 and MU63
38-32Diversion of existing gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons; and the establishment of a temporary utilities logistic hub for facilitating utility works.Works Nos. G8, MU62, MU63, OH7, OHT8 and ULH4
38-33Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. MU62, MU63 and OH7
38-34Provision for access for environmental mitigation works to create a site for protected species.Work No. E40
38-35Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. OH7 and OHT8
38-36 and 38-39To facilitate the diversion of existing gas pipeline, and to provide temporary storage, laydown areas and working space.Work No. G8
38-37To facilitate the diversion of existing gas pipeline, and to provide temporary storage, laydown areas and working space; and the establishment of a temporary utilities logistic hub for facilitating utility works.Works Nos. G8 and ULH4
38-38Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Work No. OH7
38-40, 38-41, 38-42, 38-44, 38-46, 38-49, 38-51, 38-52, 38-59 and 38-64Implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds.Work No. E36
38-43, 38-60, 38-61 and 38-65Construction of a new public right of way along the Mardyke channel, between south of the new Mardyke viaduct and the new public right of way; and implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds.Works Nos. 8J and E36
38-47Implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds; construction of a new flood compensation area; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. E36, FCA4 and MU61
38-53, 38-54 and 38-55Implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds; construction of a new flood compensation area.Works Nos. E36 and FCA3
39-01Temporary construction compound at surface for facilitating main works.Work No. CA14
39-02To facilitate the improvement works to the existing North Road, and to provide temporary storage, laydown areas and working space To facilitate the diversion of existing gas pipeline, and to provide temporary storage, laydown areas and working space.Works Nos. 8D and G9
39-04Diversion of existing gas pipeline.Work No. G9
39-05, 39-14 and 39-15To facilitate utility works, and to provide temporary storage, laydown areas and working space.Work No. MU71
39-06 and 39-16Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU71
39-08, 39-26 and 39-46To facilitate the improvement works to the existing North Road, and to provide temporary storage, laydown areas and working space.Work No. 8D
39-12Construction of a new public right of way between the new public right of way heading westwards of North Road and Church Lane.Work No. 8N
39-13Temporary construction compound at surface for facilitating main works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. CA14 and MUT29
39-17, 39-18, 39-21, 39-27 and 39-28Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MUT29
39-20Construction of a new public right of way from the realigned North Road to the new public right of way to Church Lane; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. 8D and MUT29
39-22 and 39-25To facilitate the diversion of existing gas pipeline, and to provide temporary storage, laydown areas and working space.Work No. G9
39-23Diversion of existing gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. G9, MU68, MU69 and MU70
39-29Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MUT28 and MUT29
39-30Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU69
39-31 and 39-32Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MUT28
39-33Construction of a new public right of way from the realigned North Road to the new public right of way to Church Lane; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. 8D, MUT28 and MUT29
39-50, 39-52, 39-54, 39-55, 39-57 and 39-59Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU66
39-65Construction of a new public right of way between the new bridge to carry the realigned footpath FP136 and the new bridge to carry the realigned North Road; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. 8M, MU69 and MUT26
39-66Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MU69 and MUT26
39-67Diversion of existing gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. G9, MU69 and MUT27
39-68To facilitate the diversion of existing gas pipeline, and to provide temporary storage, laydown areas and working space To facilitate utility works, and to provide temporary storage, laydown areas and working space.Works Nos. G9 and MUT27
39-69, 39-70 and 39-74To facilitate utility works, and to provide temporary storage, laydown areas and working space.Work No. MUT26
39-72Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MUT27
39-77To facilitate the diversion of existing gas pipeline, and to provide temporary storage, laydown areas and working space.Work No. G8
39-78Diversion of existing gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. G8, MU64 and MUT27
39-80 and 39-81To facilitate the construction of a three-lane carriageway northbound and two-lane carriageway southbound, and to provide temporary storage, laydown areas and working space.Work No. 8A
39-82Provision for access for environmental mitigation works to create a site for protected species.Work No. E42
39-83Construction of a new public right of way between the new bridge to carry the realigned footpath FP136 and the new bridge to carry the realigned North Road; and provision for access for environmental mitigation works to create a site for protected species; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. 8M, E42 and MUT26
39-84Temporary construction compound at surface for facilitating main works.Work No. CA13
40-21To facilitate the improvement works to the existing North Road, and to provide temporary storage, laydown areas and working space; and yo facilitate the diversion of existing gas pipeline, and to provide temporary storage, laydown areas and working space. To facilitate utility works, and to provide temporary storage, laydown areas and working space.Works Nos. 8D, G9 and MU71
40-22Diversion of existing gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. G9 and MU71
41-01 and 41-02Provision for access for environmental mitigation works to create a site for protected species.Work No. E42
41-03Implementation of environmental mitigation works to create a site for protected species.Work No. E42
41-04, 41-05, 41-08 and 41-32Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Work No. OH7
41-06, 41-07, 41-09, 41-15, 41-16, 41-18, 41-19, 41-25, 41-26 and 41-27Provision for temporary access for overhead lines diversion works.Work No. OH7
41-10Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. MUT26 and OH7
41-11Construction of a new public right of way between the new bridge to carry the realigned footpath FP136 and the new bridge to carry the realigned North Road; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. 8M and MUT26
41-13, 41-14, 41-44, 41-46, 41-47, 41-48, 41-49 and 41-51Provision for access for overhead lines diversion works.Work No. OH7
41-23Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. MU63, MUT26 and OH7
41-24Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. MU63 and OH7
41-28, 41-29, 41-30, 41-31, 41-45 and 41-50To facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space.Work No. OH7
41-33, 41-34, 41-35, 41-36, 41-37, 41-41 and 41-42Implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds.Work No. E36
41-38 and 41-43Construction of a new public right of way along the Mardyke channel, between south of the new Mardyke viaduct and the new public right of way; and implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds.Works Nos. 8J and E36
41-39Construction of a new public right of way between the public right of way along the Mardyke channel and the new bridge to carry the realigned footpath FP136.Work No. 8M
41-40Construction of a new public right of way between the public right of way along the Mardyke channel and the new bridge to carry the realigned footpath FP136; and implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds.Works Nos. 8M and E36
42-01, 42-02 and 42-03Implementation of environmental mitigation works to create a site for protected species.Work No. E43
42-04 and 42-07To facilitate utility works, and to provide temporary storage, laydown areas and working space.Work No. MU72
42-05, 42-06 and 42-11Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MU72, MU75 and MU76
42-08 and 42-12Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MU72 and MU76
42-09, 42-10 and 42-13Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MU72 and MU75
42-14Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MU72, MU73 and MU75
42-16Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU75
42-17 and 42-21Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU72
42-22Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MU75 and MU76
42-23Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MU75 and MUT30
42-24Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MU76, MU77 and MUT30
42-25Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MU75, MU76 and MUT30
42-34Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU73
42-75To facilitate the improvements to the existing highway M25 northbound and existing highway M25 southbound, and to provide temporary storage, laydown areas and working space.Work No. 9E
42-99 and 42-124Temporary possession of the railway line railway to facilitate the construction of a new bridge to carry a new public right of way over the existing Upminster and Grays Branch railway line.Work No. 9M
42-115Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MU73, MU74 and MU76
42-116To facilitate utility works, and to provide temporary storage, laydown areas and working space.Work No. MU74
42-127To facilitate the improvement works to the existing North Road, and to provide temporary storage, laydown areas and working space.Work No. 8D
42-128Construction of a new public right of way between the new public right of way heading westwards of North Road and Church Lane; and temporary construction compound at surface for facilitating main works.Works Nos. 8N and CA14
42-131, 42-132, 42-133 and 42-134Provision for temporary access and traffic management for the temporary construction compound; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. CA15A and MU76
42-135, 42-136 and 42-137Provision for temporary access and traffic management for the temporary construction compound.Work No. CA15A
42-138Construction of a new public right of way between the new public right of way heading westwards of North Road and Church Lane.Work No. 8N
42-139, 42-140, 42-141, 42-142, 42-143, 42-144, 42-145, 42-146, 42-147, 42-148, 42-149, 42-150, 42-151, 42-152, 42-153, 42-154, 42-155, 42-156, 42-157, 42-158, 42-159, 42-160, 42-161, 42-162, 42-163, 42-164, 42-165, 42-166, 42-167, 42-168, 42-169, 42-170, 42-171, 42-172, 42-173, 42-174, 42-175, 42-177, 42-178, 42-179, 42-180, 42-181, 42-182, 42-184 and 42-185Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MUT28
42-176 and 42-183Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MUT28 and MUT29
43-01, 43-02, 43-03 and 43-05Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU72
43-07Construction of a new permissive path over the new A122 Lower Thames Crossing and the improved section of the M25 Junction; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. 9O, MU72, MU78 and OH8
43-09 and 43-108Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. MU72, MU78 and OH8
43-10To facilitate utility works, and to provide temporary storage, laydown areas and working space.Work No. MU72
43-18 and 43-104Construction of a new permissive path from Thames Chase Forest, and a new private means of access from Thames Chase Forest to the new culvert; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. 9O, MU72, MU78 and OH8
43-19Construction of a new permissive path from Thames Chase Forest, and a new private means of access from Thames Chase Forest to the new culvert; implementation of environmental mitigation works to create a site for protected species; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. 9O, E46, MU72 and OH8
43-27Landscaping associated with the new public right of way and permissive path over the new A122 Lower Thames Crossing.Work No. 9O
43-28Construction of a new permissive path along the existing FP230, and landscaping associated with the new public right of way and permissive path over the new A122 Lower Thames Crossing.Work No. 9O
43-35, 43-47, 43-53, 43-106, 43-107, 43-109 and 43-110Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Work No. OH8
43-40, 43-41, 43-43, 43-46, 43-63, 43-64, 43-65, 43-66, 43-67, 43-68, 43-69, 43-70, 43-71, 43-72, 43-73, 43-74, 43-75, 43-76, 43-77, 43-78, 43-79, 43-80, 43-82, 43-83, 43-84, 43-85, 43-86, 43-87, 43-88, 43-90, 43-93, 43-94, 43-95, 43-98, 43-101, 43-102, 43-112, 43-113 and 43-114Provision for temporary access and traffic management for the temporary construction compound.Work No. CA15A
43-49Construction of a new permissive path along the existing FP230.Work No. 9O
43-54, 43-55, 43-56, 43-57, 43-58, 43-59, 43-60, 43-61, 43-62, 43-81, 43-89, 43-91 and 43-92Provision for temporary access and traffic management for the temporary construction compound; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. CA15A and MUT28
43-96, 43-97, 43-99 and 43-100Provision for access for overhead lines diversion works.Work No. OH8
43-103Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MUT28
43-105Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.Works Nos. MU72 and OH8
43-111Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU78
44-01, 44-02, 44-03 and 44-06Construction of a new flood compensation area.Work No. FCA7
44-04To facilitate utility works, and to provide temporary storage, laydown areas and working space.Work No. MU87
44-05Construction of a new flood compensation area; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. FCA7 and MU72
44-07To facilitate utility works, and to provide temporary storage, laydown areas and working space.Work No. MU83
44-08Construction of a new permissive path from Thames Chase Forest, a new permissive path to the new culvert and a new private means of access from Thames Chase Forest to the new culvert; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. 9O and MU72
44-09 and 44-17Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MU79, MU80, MU82 and MU83
44-10, 44-44 and 44-84Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU80
44-11Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU86
44-13, 44-14 and 44-94Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU72
44-16 and 44-90Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU84
44-20Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU83
44-22 and 44-56Temporary possession of railway line to facilitate the construction of earthworks associated with the new A122 Lower Thames Crossing two-lane link road from the M25 northbound carriageway to M25 junction 29 link road.Work No. 9D
44-64, 44-72 and 44-73To facilitate the improvements to the existing highway M25 northbound and existing highway M25 southbound, and to provide temporary storage, laydown areas and working space.Work No. 9E
44-68Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MU81 and MU84
44-80Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MU81 and MU83
44-81Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MU72, MU79, MU81, MU82 and MU83
44-85, 44-87 and 44-93To facilitate utility works, and to provide temporary storage, laydown areas and working space.Work No. MU72
44-86 and 44-91Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MU72, MU79, MU80, MU81, MU82 and MU83
44-88Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MU72, MU79, MU80 and MU82
44-89, 44-95 and 44-96Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MU80 and MU81
44-92To facilitate utility works, and to provide temporary storage, laydown areas and working space.Work No. MU84
44-98, 44-99 and 44-100Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU81
44-101, 44-102, 44-103, 44-104, 44-105, 44-106, 44-107, 44-108, 44-109, 44-110, 44-111, 44-113, 44-114, 44-115, 44-116, 44-117, 44-118 and 44-119Provision for temporary access and traffic management for the temporary construction compound.Work No. CA15A
44-112, 44-120, 44-121, 44-122, 44-123 and 44-124Provision for access for utility works.Work No. MU84
45-01, 45-02, 45-03, 45-04, 45-05, 45-06, 45-07, 45-09, 45-12, 45-39, 45-43, 45-45, 45-46, 45-69 and 45-70Improvement works to a section of the existing two-lane dual carriageway A127 highway.Work No. 9J
45-08, 45-15, 45-16, 45-17, 45-18, 45-20, 45-22, 45-28, 45-67 and 45-68To facilitate the improvement works to a section of the existing two-lane dual carriageway A127 highway, and to provide temporary storage, laydown areas and working space.Work No. 9J
45-10, 45-11, 45-19, 45-21, 45-23, 45-24, 45-25, 45-26, 45-29, 45-31, 45-33, 45-38, 45-42, 45-50, 45-52 and 45-62Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU91
45-47, 45-48 and 45-49Improvements to the existing two-lane link road between A127 eastbound and M25 junction 29 roundabout.Work No. 9H
45-66Improvements to the existing two-lane link road between A127 eastbound and M25 junction 29 roundabout; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. 9H and MU91
45-71Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU88
45-72Improvements to the existing two-lane link road between A127 eastbound and M25 junction 29 roundabout; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. 9H and MU88
45-79, 45-88 and 45-107To facilitate utility works, and to provide temporary storage, laydown areas and working space.Work No. MU87
45-87, 45-89 and 45-108Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the installation of poles and pole mounted transformers.Work No. MU87
45-99 and 45-100Improvement works to the existing private means of access between the improved M25 junction 29 roundabout and Codham Hall Lane.; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. 9I and MU88
45-105To facilitate utility works, and to provide temporary storage, laydown areas and working space.Work No. MU88
45-110 and 45-112Provision for access for utility works.Work No. MU87
45-111Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the installation of poles and pole mounted transformers.Works Nos. MU86 and MU87
45-120Construction of protection measures for retention of the existing infrastructure.Work No. 9P
45-121Temporary construction compound at surface for facilitating main works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the installation of poles and pole mounted transformers.Works Nos. CA16, MU85, MU87 and MUT32
45-132Temporary construction compound at surface for facilitating main works.Work No. CA16
45-137, 45-139, 45-141, 45-143, 45-144, 45-145, 45-146, 45-147, 45-148, 45-149, 45-150, 45-151, 45-152, 45-153, 45-154, 45-159, 45-161, 45-164, 45-166, 45-167, 45-178, 45-179 and 45-180Provision for temporary access and traffic management for the temporary construction compound.Work No. CA16
45-155 and 45-160Provision for temporary access and traffic management for the temporary construction compound; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. CA16, MU85 and MUT32
45-158Provision for temporary access and traffic management for the temporary construction compound; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. CA16 and MU85
45-165, 45-168, 45-171, 45-172, 45-173 and 45-174Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU85
45-169Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Works Nos. MU85 and MUT32
45-175, 45-176 and 45-177Provision for access for utility works.Work No. MU84
46-01, 46-02 and 46-03Improvement works to a section of the existing two-lane dual carriageway A127 highway.Work No. 9J
46-04Implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds.Work No. E51
46-06Implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds Installation of a high-pressure gas pipeline; and the establishment of a temporary utilities logistic hub for facilitating utility works.Works Nos. E51, G10 and ULH2
46-08, 46-09, 46-11, 46-12 and 46-13Installation of a high-pressure gas pipeline.Work No. G10
46-23, 46-24 and 46-25Provision for access for utility works.Work No. MU92
46-26Utility works, including the installation or diversion of underground utilities within a multi-utility corridor.Work No. MU92
46-52To facilitate utility works, and to provide temporary storage, laydown areas and working space.Work No. MU92
46-55Installation of a high-pressure gas pipeline; and the establishment of a temporary utilities logistic hub for facilitating utility works.Works Nos. G10 and ULH2
47-26Implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds.Work No. E51