SCHEDULES
SCHEDULE 15PROTECTIVE PROVISIONS
PART 6FOR THE PROTECTION OF LOCAL HIGHWAY AUTHORITIES
Statutory undertakers (highways)
86.—(1) During construction of the specified works prior to the issue (or deemed issue) of any provisional certificate of completion the undertaker must at no cost to the local highway authority carry out or procure the carrying out of such works of protection or alteration as are necessary as a result of the construction of the specified works to the plant, equipment and other apparatus of a statutory undertaker (highways) on the site of the specified works.
(2) The undertaker must cause all new highway or other drains or sewers, gas and water mains, pipes, electric cables (if any) or telecommunications cables and ducts (if any) or other apparatus which are to be laid by the undertaker under the specified works together with all necessary connections from them to the boundary of the specified works to be laid under the specified works before the foundation of the specified works are laid and must also cause the connections from electric cables to street lamps to be laid before the paving of any footways comprised in the specified works is carried out.