SCHEDULES
SCHEDULE 15PROTECTIVE PROVISIONS
PART 9FOR THE PROTECTION OF CAMBRIDGE WATER
Acquisition of land
130. Where the undertaker is notifying Cambridge Water of any proposed works under this Part of this Schedule then unless otherwise agreed between the parties, the following will be provided to Cambridge Water—
(a)the exact position of the works;
(b)the level at which they are proposed to be constructed, renewed or moved;
(c)the manner of their construction or renewal including details of excavation and positioning of plant;
(d)the position of all apparatus including existing apparatus and apparatus to be retained;
(e)detailed drawings showing the alterations proposed to the apparatus; and
(f)any maintenance required.