SCHEDULE 15PROTECTIVE PROVISIONS
PART 9FOR THE PROTECTION OF CAMBRIDGE WATER
Acquisition of land
schedule 15 paragraph 130 130. Where the undertaker is notifying Cambridge Water of any proposed works under this Part of this Schedule then unless otherwise agreed between the parties, the following will be provided to Cambridge Water—
schedule 15 paragraph 130 a (a)the exact position of the works;
schedule 15 paragraph 130 b (b)the level at which they are proposed to be constructed, renewed or moved;
schedule 15 paragraph 130 c (c)the manner of their construction or renewal including details of excavation and positioning of plant;
schedule 15 paragraph 130 d (d)the position of all apparatus including existing apparatus and apparatus to be retained;
schedule 15 paragraph 130 e (e)detailed drawings showing the alterations proposed to the apparatus; and
schedule 15 paragraph 130 f (f)any maintenance required.