SCHEDULE 14PARAMETERS

PART 20TRANSFER TUNNEL (WORK Nos. 18 and 27)

(1) Item(2) Diameter(3) Height(4) Depth to Invert (+ or – 0.5m)(5) Existing and finished ground level (+ or – 0.5m)
Shaft 1 (interception shaft) (Work No. 18)Maximum 9m--11.0m AOD (18m below FGL)7m AOD (0m above FGL)
Shaft 1 vent stack and odour control height (Work No. 18)   17m AOD (10m above FGL)6m AOD (1m below FGL)7m AOD (0m above FGL)
Shaft 2 (Work No. 18)12m-

-11.0m AOD (18m below FGL)

7m AOD (0m above FGL)
Shaft 1 and 2 combined option (Work No. 18)Remaining shaft 9m – temporary excavation 20m x 10m--11.0m AOD (18m below FGL)7m AOD (0m above FGL)
Shaft 3 (Work No. 27)12.5m-

-11.5m AOD (21m below FGL)

9.5m AOD (0m above FGL)
Shaft 4 (Work No. 27)9.0m-

-12.0m AOD (21m below FGL)

9.0m AOD (0m above FGL)
Shaft 5 (Work No. 27)12.5m-

-12.5m AOD (23.5m below FGL)

11.0m AOD (0m above FGL)