SCHEDULE 14PARAMETERS

PART 19CONSTRUCTION COMPOUNDS (WORK Nos. 18, 25, 28, 32 and 34)

(1) Item(2) Maximum design parameter
Existing Cambridge waste water treatment plant tunnel interception shaft (shaft 1)/pipe jack reception shaft (shaft 2) (Work Nos. 18 and 25)60m x 130m
Pipe jack intermediate shaft 3 (Work No. 28)64m x 60m
Pipe jack intermediate shaft 4 (Work No. 28)64m x 60m
Pipe jack intermediate shaft 5 (Work No. 28)64m x 60m
Riverside compound for treated effluent discharge point (Work No. 32)40m x 25m
Waterbeach Primary Compound located at the North end of the pipeline (Work No. 34)100m x 100m
Additional transient compounds along the Waterbeach pipeline at 1km spacing between the Main Construction Compound and the Primary Compound (Work No. 34)80m x 20m