SCHEDULE 14PARAMETERS

PART 1TERMINAL PUMPING STATION (WORK No. 16)

(1)

Item

(2)

Maximum design parameter

Finished ground level (FGL) (+ or – 0.5m)  9.5m Above Ordnance Datum (AOD)
Invert level (lowest internal point) of incoming sewer  -13.0m AOD (22.5m below FGL)
Depth of terminal pumping stationNo deeper than 25.5m below AOD (35m below FGL) including lowest point of piles  
Height of terminal pumping station  Up to 11.5m AOD (2m above FGL)
Configuration   Circular 24m external diameter
Maximum flow capacity  7,000 l/s
Overall footprint of terminal pumping station area65m x 115m

PART 2STORM TANKS (WORK No. 14)

(1) Item(2) Maximum design parameter
Finished ground level (+ or – 0.5m)9.5m AOD
Storm tank area71m long x 54m wide
Depth4.5m AOD (5m below FGL)
Foundations-15.5m AOD (25m below FGL)
Height14.5m AOD (5m above FGL)
Stormwater storage capacityNo less than 20,400m3

PART 3INLET WORKS (WORK No. 4)

(1) Item(2) Maximum design parameter
Finished ground level (+ or – 0.5m)9.5m AOD
Elevated screen channel – configuration12m wide x 3m deep x 60m long
Elevated grit removal chambers – configuration16m wide x 3m deep x 17m long
Elevated flow measurement channel – configuration5m wide x 3m deep x 22m long
Inlet works - Height17.5m AOD (8m above FGL)
Inlet works - Depth

7.5m AOD (2m below FGL) to underside of structure

Inlet works - Foundations-15.5m AOD (25m below FGL)
Screenings handling plant12m x 9m
Screenings handling plant height13.5m AOD (4m above FGL)
Number of screenings handling plant2 No.
Grit handling plant8m x 3m
Grit handling plant height13.5m AOD (4m above FGL)
Footprint of odour control unit20m x 10m
Odour control unit diameter5m
Odour control unit height14.5m AOD (5m above FGL)
Number of odour control units2 No.
Number of odour control unit exhaust stacks2 No.
Carbon vessel height13.5m AOD (4m above FGL)
Odour control unit exhaust stack height25.5m AOD (16m above FGL)
Overall footprint of inlet works area90m x 75m

PART 4PRIMARY SETTLEMENT TANKS (WORK No. 6)

(1) Item(2) Maximum design parameter
Finished ground level (+ or – 0.5m)9.5m AOD
Total surface area of circular or rectangular primary settlement tanks6,451m2
Number of primary settlement tanks6 No.
Depth1.5m AOD (8m below FGL)
FoundationsPiles to a depth of -15.5m AOD (25m below FGL)
Height15.5m AOD (6m above FGL)
Overall footprint of primary settlement tanks area175m x 115m
Ferric dosing plant area including kiosk20m x 5m
Ferric dosing plant: height14.5m AOD (5m above FGL)

PART 5ACTIVATED SLUDGE PROCESS TANKS (WORK No. 10)

(1) Item(2) Maximum design parameter
Finished ground level (+ or – 0.5m)9m AOD
Area of individual activated sludge process tanks

Reactor – 20m wide x 90m long

Number of reactor tanks4 No.
Area of mixing and conditioning tank25m wide x 25m long
Area of interstage pumping station25m x 15m
Depth of activated sludge process tanks, mixing and conditioning tank and interstage pumping station3m AOD (6m below FGL)
Height of activated sludge process tanks, mixing and conditioning tank and interstage pumping station17m AOD (8m above FGL)
Foundation depth of overall activated sludge process area-16m AOD (25m below FGL)
Blower Building – height14m AOD (5m above FGL)
Blower Building footprint25m x 15m
Overall footprint of activated sludge process area115m x 135m

PART 6FINAL SETTLEMENT TANKS (WORK No. 11)

(1) Item(2) Maximum design parameter
Finished ground level (+ or – 0.5m)9m AOD
Configuration of individual final settlement tanks8 No. circular tanks each with a 39m diameter
Depth4m AOD (5m below FGL)
FoundationsPiles to a depth of -16m AOD (25m below FGL)
Height18m AOD (9m above FGL)
Return activated sludge/surplus activated sludge pumps18 No.
Overall footprint of final settlement tanks including combined return activated sludge/surplus activated sludge pumping station130m x 225m

PART 7TERTIARY TREATMENT PLANT (WORK No. 13)

(1) Item(2) Maximum design parameter
Finished ground level (+ or – 0.5m)9.5m AOD
Depth of filtration plant4.5m AOD (5m below FGL)
Foundation depth-15.5m AOD (25m below FGL)
Height of filtration plant19.5m AOD (10m above FGL)
Ferric dosing plant area20m x 12m
Ferric dosing plant: height17m AOD (7.5m above FGL)
Overall footprint of tertiary treatment plant60m x 40m

PART 8SLUDGE STORAGE CAPACITY (WORK No. 8)

(1) Item(2) Number(3) Maximum design parameter(4) Maximum height
Finished ground level (+ or – 0.5m)9m AOD
Imported and indigenous primary sludge tanks2

Maximum sludge capacity of 1,295m3 each

Subject to maximum sludge capacity, maximum 16.5m diameter

Subject to maximum sludge capacity, 17.5m AOD (8.5m above FGL)
Foundation depth

Piles to a depth of -16m AOD (25m below FGL)

Un-thickened sludge tanks3

Maximum sludge capacity of 1,327m3 each

Subject to maximum sludge capacity, maximum 16.5m diameter

Subject to maximum sludge capacity, 17.5m AOD (8.5m above FGL)
Foundation depthPiles to a depth of -16m AOD (25m below FGL)
Imports and screening area   80m x 50m

17.5m AOD (8.5m above FGL)

(excluding vent stack, see Part 10 below)

PART 9THICKENING EQUIPMENT (WORK No. 8)

(1) Item(2) Number(3) Maximum design parameter(4) Maximum height
Finished ground level (+ or – 0.5m)   9m AOD   
Building to house thickening equipment128m x 18m19m AOD (10m above FGL)
FoundationsPiles to a depth of -16m AOD (25m below FGL)
Thickened sludge blending tank1

Maximum sludge capacity of 800m3

Subject to maximum sludge capacity, maximum 11.5m diameter

Subject to maximum sludge capacity, 19m AOD (10m above FGL)
Overall footprint of thickening area   70m x 25m19m AOD (10m above FGL)
FoundationsPiles to a depth of -16m AOD (25m below FGL)

PART 10ODOUR CONTROL PLANT (WORK No. 8)

(1) Item(2) Number(3) Maximum design parameter(4) Maximum height
Finished ground level (+ or – 0.5m)   9m AOD   
Sludge treatment centre odour control unit 1120m x 10mVent stack 25m AOD (16m above FGL)
Sludge treatment centre odour control unit 2120m x 10mVent stack 25m AOD (16m above FGL)

PART 11DIGESTERS (WORK No. 8)

(1) Item(2) Number(3) Maximum design parameter(4) Maximum diameter(5) Maximum height
Finished ground level (+ or – 0.5m)   9m AOD      
Digesters capacity24,900m322m

30.4m AOD (21.4m above FGL)

Post digestion storage capacity2400m38.5m

18.5m AOD (9.5m above FGL)

Heating, pasteurisation and hydrolysis (HpH) heating tank capacity1400m37m24m AOD (15m above FGL)
Heating, pasteurisation and hydrolysis (HpH) pasteurisation tank capacity2400m37m24m AOD (15m above FGL)
Heating, pasteurisation and hydrolysis (HpH) hydrolysis tank capacity11,500m314m24m AOD (15m above FGL)
Overall footprint of digestion plant area   100m x 60m   30.4m AOD (21.4m above FGL)
Depth of piled foundations   -16 AOD (25m below FGL)   

PART 12CAKE DEWATERING AND STORAGE (WORK No. 8)

(1) Item(2) Number(3) Maximum design parameter(4) Maximum height
Finished ground level (+ or – 0.5m)9m AOD
Cake storage barn or silo130m x 40m18m AOD (9m above FGL)
Dewatering centrifuges/volutes220m x 20mGantry height 17m AOD (8m above FGL)
Foundation depth

Piles to a depth of -16m AOD (25m below FGL)

Overall footprint of dewatering and cake storage area60m x 50m (9m above FGL)   

PART 13LIQUOR TREATMENT PLANT (WORK No. 8)

(1) Item(2) Maximum design parameter(3) Maximum height
Finished ground level (+ or – 0.5m)9m AOD
Reactor25m diameter18m AOD (9m above FGL)
Stilling tank5m diameter18m AOD (9m above FGL)
Settlement tank15m diameter18m AOD (9m above FGL)
Foundation depthPiles to a depth of -16m AOD (25m below FGL)
Total area of liquor treatment plant75m x 40m18m AOD (9m above FGL)

PART 14NUTRIENT RECOVERY OPTION (WORK No. 8)

(1) Item(2) Maximum design parameter
Finished ground level (+ or – 0.5m)9m AOD
Number of stripping/scrubbing columns3 No.
Stripping/scrubbing column heights27m AOD (18m above FGL)
Stripping/scrubbing column diameters3m
Feed pumping station – depth4m AOD (5m below FGL)
Foundation depthPiles to a depth of -16m AOD (25m below FGL)
Total Area50m x 50m
Total height27m AOD (18m above FGL)

PART 15GAS HANDLING EQUIPMENT OPTIONS (WORK Nos. 8 and 9)

(1) Item(2) Number(3) Maximum design parameters(4) Maximum height(5) Maximum Capacity
Finished ground level (+ or – 0.5m)9m AOD
Gas holder/gas bag (Work No. 8)117m diameter29m AOD (20m above FGL) including lightning protection2,000m3
Flare stack (Work No. 8)124m AOD (15m above FGL)2,000m3/hr
Footprint of biogas storage and operational area (Work No. 8)170m x 50m
Foundation depthPiles to a depth of -16m AOD (25m below FGL)
EITHER            
Biogas upgrading plant (Work No. 9)150m x 50m21m AOD (12m above FGL)1,000m3/hr
OR            
Combined heat and power (CHP) plant (Work No. 9)2 CHP engines50m x 50m33m AOD (24m above FGL) stack combined with boiler flue (see Part 16 below)1.5 MW thermal input per CHP engine (total maximum 3MWth)

PART 16STEAM RAISING BOILER (WORK No. 8)

(1) Item(2) Number(3) Maximum design parameter(4) Maximum height
Finished ground level (+ or – 0.5m)9m AOD
Boiler building120m x 20m

17.5m AOD (8.5m above FGL)

Boiler stack1

2m diameter plus access platform

Stack 33m AOD (24m above FGL)
Overall footprint of boiler plant35m x 25m
Boiler capacity23.5MWth each, one operational, one standby, total maximum 7MWth   
Foundation depthPiles to a depth of -16m AOD (25m below FGL)

PART 17INTERNAL ROADS (FURTHER WORKS WITHIN THE INNER BOUNDARY OF WORK No. 15)

(1) Item(2) Maximum design parameter
Width of two way roads8m wide
Width of one way roads4m wide
Total area of internal roads35,500m2

PART 18BUILDINGS AND OTHER FACILITIES (WORK Nos. 3, 7, 19 and FURTHER WORKS)

(1) Item(2) Main parameters(3) Maximum height
Gateway building (Work No. 19)58.2m x 17.1m

18.5m AOD (9m above FGL)

Piled foundations to a depth of -15.5m AOD (25m below FGL)

Workshop building (Work No. 7)55m x 16m

19.5m AOD (10m above FGL)

Piled foundations to a depth of -15.5m AOD (25m below FGL)

District Network Operator (DNO) enclosure (Work No. 19)5m x 10m12.5m AOD (3m above FGL)
Vehicle parking (Work Nos. 3, 7 and Further Works)4,000m2N/A

56 staff (including LGVs);

7 HGVs;

3 trailers;

12 visitor vehicle parking spaces (including two disabled spaces);

1 visitor coach parking space

Provision for 50 bicycles

PART 19CONSTRUCTION COMPOUNDS (WORK Nos. 18, 25, 28, 32 and 34)

(1) Item(2) Maximum design parameter
Existing Cambridge waste water treatment plant tunnel interception shaft (shaft 1)/pipe jack reception shaft (shaft 2) (Work Nos. 18 and 25)60m x 130m
Pipe jack intermediate shaft 3 (Work No. 28)64m x 60m
Pipe jack intermediate shaft 4 (Work No. 28)64m x 60m
Pipe jack intermediate shaft 5 (Work No. 28)64m x 60m
Riverside compound for treated effluent discharge point (Work No. 32)40m x 25m
Waterbeach Primary Compound located at the North end of the pipeline (Work No. 34)100m x 100m
Additional transient compounds along the Waterbeach pipeline at 1km spacing between the Main Construction Compound and the Primary Compound (Work No. 34)80m x 20m

PART 20TRANSFER TUNNEL (WORK Nos. 18 and 27)

(1) Item(2) Diameter(3) Height(4) Depth to Invert (+ or – 0.5m)(5) Existing and finished ground level (+ or – 0.5m)
Shaft 1 (interception shaft) (Work No. 18)Maximum 9m--11.0m AOD (18m below FGL)7m AOD (0m above FGL)
Shaft 1 vent stack and odour control height (Work No. 18)   17m AOD (10m above FGL)6m AOD (1m below FGL)7m AOD (0m above FGL)
Shaft 2 (Work No. 18)12m-

-11.0m AOD (18m below FGL)

7m AOD (0m above FGL)
Shaft 1 and 2 combined option (Work No. 18)Remaining shaft 9m – temporary excavation 20m x 10m--11.0m AOD (18m below FGL)7m AOD (0m above FGL)
Shaft 3 (Work No. 27)12.5m-

-11.5m AOD (21m below FGL)

9.5m AOD (0m above FGL)
Shaft 4 (Work No. 27)9.0m-

-12.0m AOD (21m below FGL)

9.0m AOD (0m above FGL)
Shaft 5 (Work No. 27)12.5m-

-12.5m AOD (23.5m below FGL)

11.0m AOD (0m above FGL)

PART 21OUTFALL STRUCTURE (WORK No. 32)

(1) Item(2) Length/dimensions (+ or – 0.5m)(3) Depth to invert (+ or – 0.5m)(4) Existing and finished ground level (+ or – 0.5m)
Finished ground level (+ or – 0.5m)4.5m AOD (0m above FGL)
Outfall structure12m long x 7m wide x 5m deep0.5m AOD (4m below FGL)4.5m AOD (0m above FGL)
North Sheet piled protection20m-5.0m AOD (9.5m below FGL)4.5m AOD (0m above FGL)
South Sheet piled protection35m-5.0m AOD (10.5m below FGL)5.5m AOD (0m above FGL)

PART 22SOLAR INSTALLATION (WORK Nos. 7, 15 and 19)

(1) Item(2) Maximum area(3) Minimum area
Total solar installation7.0 Hectares0.0 Hectares

PART 23HEIGHTS OF SLIM STRUCTURES NOT INCLUDED IN OTHER PARTS

(1) Item(2) Height(3) Existing and finished Ground level (+ or – 0.5m)
Heights of crane jibs during construction (all Work Nos.)50m above existing ground level equating to 60.0m AODNo greater than 10.0m AOD
Lighting columns (Work Nos. 2, 3 and further works)15m AOD (5m above FGL)No greater than 10.0m AOD

PART 24PARAPET OVER THE A14 (WORK No. 1)

(1) Item(2) Height
Equestrian parapet over the A14 forming part of the highway works within Work No. 11.8m