Work No. 8 – SLUDGE TREATMENT CENTRE
A sludge treatment centre comprising—
(a)sludge reception facilities for imported primary settled sludge and surplus activated sludge;
(b)up to 2 imported and indigenous primary sludge tanks;
(c)up to 3 unthickened sludge tanks;
(d)screens;
(e)up to 2 odour control units with vent stacks;
(f)thickening building including a sludge blending tank;
(g)up to two anaerobic sludge digesters;
(h)up to 2 post digestion storage tanks and vacuum de-gassing units;
(i)a heating, pasteurisation and hydrolysis process heating tank;
(j)up to 2 heating, pasteurisation and hydrolysis process pasteurisation tanks;
(k)a heating, pasteurisation and hydrolysis process hydrolysis tank;
(l)up to 2 dewatering centrifuges/volutes;
(m)cake storage barn and silo area;
(n)either—
(i)a liquor treatment plant including a reactor, a stilling tank and a settlement tank; and/or
(ii)a nutrient recovery plant including three stripping/scrubbing columns and a feed pumping station; and/or
(iii)a hybrid liquor treatment plant and nutrient recovery plant;
(o)biogas handling equipment including up to 2 gas holders and a flare stack;
(p)boiler building and boiler stack;
(q)final effluent heat recovery and treatment plant;
(r)chemical storage and dosing plant;
(s)aviation obstruction lighting; and
(t)connections to Work Nos. 4, 6, 9, 10, 11 and 13.