Work No. 36 – WATERBEACH PIPELINE SOUTH

The provision of the Waterbeach pipeline south works as follows—

(a)up to two waste water pipelines laid between Work No. 33 and the boundary of the existing Cambridge waste water treatment works including crossings of the river Cam, the A14, Horningsea Road, Fen Road and the King’s Lynn railway line using horizontal directional drilling technique in accordance with the code of construction practice, but otherwise laid using either open cut tracking or horizontal directional drilling technique;

(b)up to two waste water pipelines laid underground and above ground within the existing Cambridge waste water treatment works;

(c)new accesses and access improvements;

(d)temporary shafts;

(e)horizontal directional drilling launch and exit pits;

(f)welfare, storage and laydown areas;

(g)temporary haul roads;

(h)dewatering, drainage works and restoration of existing land drainage;

(i)ditch crossing, diversion and associated protection works;

(j)mud and soil handling;

(k)associated infrastructure including air valves and other pipework fittings and fixtures;

(l)permanent accesses for future maintenance and replacement of the pipelines;

(m)connections to Work Nos. 33 and 35 and at the existing Cambridge waste water treatment works; and

(n)decommissioning of all or part of this Work.