Work No. 33 – WATERBEACH PIPELINE NORTH
Up to two waste water pipelines laid underground between a point of connection with waste water infrastructure to be provided as part of the Waterbeach New Town development and Work No. 35 and Work No. 36, including—
(a)crossings of the river Cam, the King’s Lynn railway line and Low Fen Drove Way using horizontal directional drilling technique in accordance with the code of construction practice, but otherwise laid using either open cut trenching or horizontal directional drilling technique;
(b)new accesses and access improvements;
(c)temporary shafts;
(d)horizontal directional drilling launch and exit pits;
(e)welfare, storage and laydown areas;
(f)temporary haul roads;
(g)dewatering, drainage works and restoration of existing land drainage;
(h)ditch crossing, diversion and associated protection works;
(i)mud and soil handling;
(j)associated infrastructure including air valves and other pipework fittings and fixtures;
(k)permanent accesses for future maintenance and replacement of the pipelines; and
(l)connections to Work No. 35 and Work No. 36.