ID badges: Hide | Show

SCHEDULES

SCHEDULE 1AUTHORISED DEVELOPMENT

Work No. 33 – WATERBEACH PIPELINE NORTH

Up to two waste water pipelines laid underground between a point of connection with waste water infrastructure to be provided as part of the Waterbeach New Town development and Work No. 35 and Work No. 36, including—

schedule 1 paragraph wrapper33 a (a)crossings of the river Cam, the King’s Lynn railway line and Low Fen Drove Way using horizontal directional drilling technique in accordance with the code of construction practice, but otherwise laid using either open cut trenching or horizontal directional drilling technique;

schedule 1 paragraph wrapper33 b (b)new accesses and access improvements;

schedule 1 paragraph wrapper33 c (c)temporary shafts;

schedule 1 paragraph wrapper33 d (d)horizontal directional drilling launch and exit pits;

schedule 1 paragraph wrapper33 e (e)welfare, storage and laydown areas;

schedule 1 paragraph wrapper33 f (f)temporary haul roads;

schedule 1 paragraph wrapper33 g (g)dewatering, drainage works and restoration of existing land drainage;

schedule 1 paragraph wrapper33 h (h)ditch crossing, diversion and associated protection works;

schedule 1 paragraph wrapper33 i (i)mud and soil handling;

schedule 1 paragraph wrapper33 j (j)associated infrastructure including air valves and other pipework fittings and fixtures;

schedule 1 paragraph wrapper33 k (k)permanent accesses for future maintenance and replacement of the pipelines; and

schedule 1 paragraph wrapper33 l (l)connections to Work No. 35 and Work No. 36.