SCHEDULES
SCHEDULE 1AUTHORISED DEVELOPMENT
Work No. 2 – PERMANENT ACCESS ROAD
A new two-lane road access to the waste water treatment plant from the reconfigured A14 Junction 34/B1047 Horningsea Road junction the general arrangement of which is shown on sheet 1 of the highways plans including—
(a)landscaping;
(b)drainage;
(c)a weighbridge;
(d)automatic number plate recognition cameras;
(e)signage;
(f)street lighting at the junction with Work No. 1; and
(g)connections to Work No. 1 and Work No. 3 and to the access and circulation roads to be constructed within the inner boundary of Work No. 15.