SCHEDULES
SCHEDULE 1AUTHORISED DEVELOPMENT
Work No. 18 – INTERCEPTION AND FIRST CONSTRUCTION SHAFT
Interception shaft to intercept incoming waste water flows from the existing Riverside tunnel and receive flows from a new 750mm gravity main within Work No. 17 with an internal diameter of up to 12.5 metres and with a depth of up to 20 metres including—
(a)ventilation stack extending up to 10 metres above the proposed ground level;
(b)vortex drop pipe;
(c)odour control unit comprising small roadside boxes housing carbon filters and local panels;
(d)welfare and laydown area, hard standing and storage area;
(e)dewatering;
(f)security fencing;
(g)soil handling;
(h)crane working space;
(i)decommissioning works to redundant mains;
(j)local control panels;
(k)kiosks;
(l)closed circuit television cameras and columns;
(m)lightning protection infrastructure including masts, finials, earth matts and bonding;
(n)chemical storage and dosing plant;
(o)a temporary shaft associated with the construction of Work No. 27; and
(p)connections to Work Nos. 17, 26 and 27.