SCHEDULE 1AUTHORISED DEVELOPMENT

Work No. 18 – INTERCEPTION AND FIRST CONSTRUCTION SHAFT

Interception shaft to intercept incoming waste water flows from the existing Riverside tunnel and receive flows from a new 750mm gravity main within Work No. 17 with an internal diameter of up to 12.5 metres and with a depth of up to 20 metres including—

schedule 1 paragraph wrapper18 a (a)ventilation stack extending up to 10 metres above the proposed ground level;

schedule 1 paragraph wrapper18 b (b)vortex drop pipe;

schedule 1 paragraph wrapper18 c (c)odour control unit comprising small roadside boxes housing carbon filters and local panels;

schedule 1 paragraph wrapper18 d (d)welfare and laydown area, hard standing and storage area;

schedule 1 paragraph wrapper18 e (e)dewatering;

schedule 1 paragraph wrapper18 f (f)security fencing;

schedule 1 paragraph wrapper18 g (g)soil handling;

schedule 1 paragraph wrapper18 h (h)crane working space;

schedule 1 paragraph wrapper18 i (i)decommissioning works to redundant mains;

schedule 1 paragraph wrapper18 j (j)local control panels;

schedule 1 paragraph wrapper18 k (k)kiosks;

schedule 1 paragraph wrapper18 l (l)closed circuit television cameras and columns;

schedule 1 paragraph wrapper18 m (m)lightning protection infrastructure including masts, finials, earth matts and bonding;

schedule 1 paragraph wrapper18 n (n)chemical storage and dosing plant;

schedule 1 paragraph wrapper18 o (o)a temporary shaft associated with the construction of Work No. 27; and

schedule 1 paragraph wrapper18 p (p)connections to Work Nos. 17, 26 and 27.