Part 3Connected listed building applications
Chapter 1Applications and publicity
Publicity for applications: Secretary of State
36.—(1) This article applies where the Secretary of State considers that the connected listed building application is connected to the Crown development application and that the application is valid (within the meaning of article 32(5)).
(2) Before the end of the period of 5 working days beginning with the day the notice required by article 32(6) was sent, the Secretary of State must publish the following information on a website—
(a)the address or location of the listed building,
(b)a description of the proposed works,
(c)the date by which any representations about the connected listed building application must be made, which must not be before the last day of the period of 21 days beginning with the day on which the information is published,
(d)details of where and when the application may be inspected, and
(e)the Secretary of State’s address for receipt of representations about the application.
(3) As soon as reasonably practicable after publishing the information required by paragraph (2), the Secretary of State must—
(a)publicise the connected listed building application by publication of the requisite notice in a newspaper circulating in the locality in which the listed building to which the application relates is situated, and
(b)make copies of the application and any documents accompanying it available on the website referred to in paragraph (2).
(4) In this article, “requisite notice” means a notice in the form set out in Schedule 5 or in a form substantially to the same effect.
(5) When computing the number of days in paragraph (2)(c), any day which is a public holiday must be disregarded.