SCHEDULE 1AUTHORISED DEVELOPMENT

PART 2PARAMETERS TABLE

(1)

Component

(2)

Maximum dimensions

(m)

(2)

Maximum height above Finished Floor Level (FFL)

(m)

(2)

Maximum height AOD

(m)

ERF (Work No. 1)Tipping hall87.5 x 603137.6
Bunker hall92 x 404349.6
Boiler hall105 x 605561.6
Flue gas treatment hall41 x 604551.6
Turbine hall80 x 372531.6
Bottom ash hall37 x 372531.6
Transformer compound52 x 221016.6
Switchyard93 x 441014.6
Offices and admin facilities30 x 1004349.6
Fire water tank11.3 diameter19.325.9
Fire water pumphouse6 x 66.513.1
Gatehouses32 x 12511.6
Visual barriers4.511.1
ERF stack windshield (Work No. 1A)10 diameter120126.6
Back up boilers stack windshield (Work No. 1A)3 diameter5359.6
Back-up generator stack (Work No. 1A)0.85 diameter5561.6
Carbon capture utilisation and storage facility (Work No. 1B)79 x 665056.6
Carbon dioxide storage tanks (Work No. 1B)28 x 202026.6
Visitor centre (Work No. 1C)41 x 361619.05
Elevated walkway (Work No. 1 and 1C)700 x 41217.05
Air-cooled condensers/Air blast chillers (Work No. 1D)75 x 355056.6
RHTF and CBMF (Work No. 2)process building and storage areas280 x 1302530.1
Admin buildings62 x 102126.1
Rail Infrastructure (Work No. 3)Footbridge No. 155.385
Footbridge No. 248.561
Access road (Work No. 5)5.2
Plastic recycling facility (Work No. 6)Pre-processed material storage65 x 351013.9
Heat exchange building35 x 171518.9
Post processed storage5 x 16.41518.9
Electrical rooms15 x 71013.9
Process building130 x 802528.9
Admin building62 x 102124.9
Hydrogen electrolyser (Work No. 7)Northern Gas AGI60 x 6059.6
Northern hydrogen production and storage facility100 x 25812.6

Vehicle refuelling station

(Work No. 8)

95 x 8012.515.5
Hydrogen refuelling station (Work No. 8)Southern Gas AGI60 x 60510.1
Southern hydrogen production and storage facility100 x 25811.6
Battery storage facility (Work No. 9)115 x 588.511.5