Article 24
SCHEDULE 7Land in which only new rights etc., may be acquired
(1) Number of plot shown on land plans | (2) Purpose for which rights may be acquired |
---|---|
1/43, 35/20, 35/24, 35/30, 35/34, 35/36, 36/3, 36/4, 36/5, 36/6, 36/7, 36/11 | Rights for the purposes of the construction, installation, operation, maintenance and decommissioning of the authorised development to— schedule 7 paragraph an1 (a)pass and re-pass with or without vehicles, plant, machinery, apparatus, equipment and materials for the purposes of laying down, installing, adjusting, altering, constructing, using, maintaining, repairing, renewing, inspecting, removing and replacing the authorised development, the inspection, testing, maintenance, renewal, upgrading, replacement and removal of the pipeline and connection into any adjacent pipeline and associated works, to take plant and equipment on to adjoining land; schedule 7 paragraph bn1 (b)make such investigations in or on the Land which is ancillary for the purposes of exercise of the rights; schedule 7 paragraph cn1 (c)construct, use, maintain and improve a permanent means of access including visibility splays, and retain, maintain, straighten, widen, repair, alter, upgrade and use existing access routes for the purposes of accessing the Land, adjoining land and highway; schedule 7 paragraph dn1 (d)place and use plant, machinery, structures and temporary structures within the Land, and to erect temporary signage and provide measures for the benefit of public and personnel safety; schedule 7 paragraph en1 (e)fell, lop or cut, coppice wood, uproot trees or hedges or shrubs which now or hereafter may be standing on the Land; schedule 7 paragraph fn1 (f)repair, improve, renew, remove, relocate and plant trees, woodland, shrubs, hedgerows, seeding and other ecological measures together with the right to maintain, inspect and replant such trees, shrubs and landscaping; schedule 7 paragraph gn1 (g)install, execute, implement, retain, repair, improve, renew, relocate, maintain and carry out mitigation, maintenance, remediation works for environmental or ecological mitigation or enhancement works, including temporary works for noise alleviation measures and the installation of temporary barriers for the protection of fauna; schedule 7 paragraph hn1 (h)erect and remove temporary fencing, gates, walls, barriers or other means of enclosure; and schedule 7 paragraph in1 (i)lay out temporary paths and bridleways for public use as temporary diversions for public rights of way which are interfered with during any period in which construction, maintenance, repair or renewal decommissioning is being carried out. A restrictive covenant over the Land for the benefit of the remainder of the Order land to: schedule 7 paragraph jn1 (j)prevent anything being done which may interfere with free flow and passage of carbon dioxide along the pipeline or electronic communications through the cables and fibre optic cables ancillary to the pipeline, or support for the authorised development; schedule 7 paragraph kn1 (k)prevent anything to be done in or upon the Land or any part thereof for the purpose of the erection of any buildings or construction erection or works of any kind (including the foundations or footings thereto); schedule 7 paragraph ln1 (l)prevent the planting or growing within the Land of any trees, shrubs or underwood without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed provided that the proposed trees, shrubs or underwood would not cause damage to the relevant part of the authorised development nor make it materially more difficult or expensive to access the relevant part of the authorised development); and schedule 7 paragraph mn1 (m)prevent carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt, or interfere with the exercise of the rights or damage the authorised development. |
1/52, 1/55, 1/56, 1/62, 1/63, 1/65, 1/66, 10/8, 10/9, 10/13, 10/14, 10/15, 10/16, 16/7, 16/8, 25/8, 25/9, 26/1, 35/24, 35/27, 35/29, 35/32, 35/39, 35/40, 35/41, 36/2 | The right to enter and remain upon the land for the purposes of the construction, operation, maintenance and decommissioning of the authorised development and to— schedule 7 paragraph an2 (a)install, construct, maintain, use, improve, cleanse, repair, replace and remove cables, conduits, service media and associated apparatus that are used for the purposes of transmitting or distributing electricity and communications within that part of the land over which the new rights are acquired schedule 7 paragraph bn2 (b)pass and re-pass with or without vehicles, plant, machinery, apparatus, equipment and materials for the purposes of laying down, installing, adjusting, altering, constructing, using, maintaining, repairing, renewing, inspecting, removing and replacing cables, conduits, service media and associated apparatus as part of the authorised development; schedule 7 paragraph cn2 (c)make such investigations in or on the Land which is ancillary for the purposes of exercise of the rights; schedule 7 paragraph dn2 (d)place and use plant, machinery, structures and temporary structures within the Land, and to erect temporary signage and provide measures for the benefit of public and personnel safety; schedule 7 paragraph en2 (e)fell, lop or cut, coppice wood, uproot trees or hedges or shrubs which now or hereafter may be standing on the Land; schedule 7 paragraph fn2 (f)repair, improve, renew, remove, relocate and plant trees, woodland, shrubs, hedgerows, seeding and other ecological measures together with the right to maintain, inspect and replant such trees, shrubs and landscaping; schedule 7 paragraph gn2 (g)install, execute, implement, retain, repair, improve, renew, relocate, maintain and carry out mitigation, maintenance, remediation works for environmental or ecological mitigation or enhancement works, including temporary works for noise alleviation measures and the installation of temporary barriers for the protection of fauna; schedule 7 paragraph hn2 (h)erect and remove temporary fencing, gates, walls, barriers or other means of enclosure; and schedule 7 paragraph in2 (i)lay out temporary paths and bridleways for public use as temporary diversions for public rights of way which are interfered with during any period in which construction, maintenance, repair or renewal decommissioning is being carried out. A restrictive covenant over the Land for the benefit of the remainder of the Order land to— schedule 7 paragraph jn2 (j)prevent anything being done which may interfere with free flow and passage of carbon dioxide along the pipeline or electronic communications through the cables and fibre optic cables ancillary to the pipeline, or support for the authorised development; schedule 7 paragraph kn2 (k)prevent anything to be done in or upon the Land or any part thereof for the purpose of the erection of any buildings or construction erection or works of any kind (including the foundations or footings thereto); schedule 7 paragraph ln2 (l)prevent the planting or growing within the Land of any trees, shrubs or underwood without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed provided that the proposed trees, shrubs or underwood would not cause damage to the relevant part of the authorised development nor make it materially more difficult or expensive to access the relevant part of the authorised development); and schedule 7 paragraph mn2 (m)prevent carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt, or interfere with the exercise of the rights or damage the authorised development. |
36/12, 36/13, 36/14, 36/15, 36/16 | The right to enter and remain upon the land for the purposes of the operation, maintenance and decommissioning of the authorised development and to— schedule 7 paragraph an3 (a)use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, divert, make safe, make incapable of operation, replace and remove the existing pipeline together with ancillary equipment including cathodic protection; schedule 7 paragraph bn3 (b)enter and be upon that part of the land over which the new rights are acquired and remain with or without all necessary plant, vehicles, machinery, materials, drilling fluids, apparatus and equipment for the purposes of using, maintaining, repairing, renewing, upgrading, inspecting, surveying, cleansing, re-laying, diverting, making safe, making incapable of operation, replacing and removing the pipeline and ancillary equipment to include cathodic protection; schedule 7 paragraph cn3 (c)retain and use the existing pipeline and ancillary equipment within that part of the land over which the new rights are acquired for the purpose of the transmission of carbon dioxide and for associated purposes; schedule 7 paragraph dn3 (d)place and use apparatus, materials (including matting, trackways, hard standing and other material in connection with construction of haul and access roads and storage areas), plant, machinery, trench shuttering, temporary structures and welfare accommodation for the maintenance, repairing, renewing, upgrading, inspecting, removal and replacing of the pipeline and ancillary equipment to include cathodic protection within that part of the land over which the new rights are acquired; and to construct, lay down, use and remove temporary haul and access roads, trackways, matting and other suitable materials, including for any necessary temporary bridging of statutory undertakers’ apparatus, other apparatus, conduits, watercourses, ditches and drains; and to effect access to the highway; schedule 7 paragraph en3 (e)install, keep, maintain, replace, renew and remove pipeline marker posts, test posts and aerial markers within that part of the land over which the new rights are acquired, to identify the location of the pipeline (subject to the undertaker seeking to locate the marker posts so as to minimise interference with the owner’s future use and operations within the land); schedule 7 paragraph fn3 (f)fell, lop, prune or cut trees, shrubs or hedges or remove roots of trees, hedges or shrubs within that part of the land over which the new rights are acquired for the purposes of using, maintaining, repairing, renewing, upgrading, inspecting, surveying, cleansing, re-laying, diverting, making safe, making incapable of operation, replacing and removing the pipeline and ancillary equipment; schedule 7 paragraph gn3 (g)use, inspect, modify, maintain, adjust, alter, support, renew, repair, improve, extend, test or cleanse and to connect in to existing drainage, watercourses, sewers or culverts and to manage water flows in existing drains, watercourses and culverts, including by way of damming and overpumping within that part of the land over which the new rights are acquired; schedule 7 paragraph hn3 (h)alter, re-lay, maintain, adjust or remove existing pipes, cables or conduits or service media and associated apparatus (including apparatus of statutory undertakers) within that part of the land over which the new rights are acquired; schedule 7 paragraph in3 (i)install, construct, maintain, use, improve, cleanse, repair, replace and remove new pipes, cables, conduits, service media and associated apparatus that are used for the purposes of transmitting or distributing electricity, communications, carbon dioxide, gas, oil, water supply, sewerage and drainage (including apparatus of statutory undertakers) within that part of the land over which the new rights are acquired; schedule 7 paragraph jn3 (j)erect, maintain and remove temporary fencing for site safety and to create, retain and remove temporary secure works compounds within that part of the land over which the new rights are acquired; schedule 7 paragraph kn3 (k)remove fences, hedges, gates or other barriers during any period during which laying down, construction, installation, adjusting, altering, testing, maintaining, repairing, renewing, upgrading, cleansing, relaying, diverting, making safe, making incapable of operation, replacing and removing the pipeline and ancillary equipment to include cathodic protection (subject to the prior erection of any temporary stock proof fencing as is reasonably required and the replacement, replanting or re-instatement of fences, hedges or other barriers following the exercise of the new rights); schedule 7 paragraph ln3 (l)install, maintain, use, inspect, modify, improve, adjust, repair, replace, extend, test, cleanse and remove temporary and permanent drainage; schedule 7 paragraph mn3 (m)carry out environmental surveys, mitigation works, maintenance and enhancement works within that part of the land over which the new rights are acquired; schedule 7 paragraph n (n)enter for the purposes of intrusive surveys including for site investigation and environmental surveys, making of boreholes, trial pits and archaeological trenches, auger hole sampling and the taking of soil and other samples, and to reinstate the land to its condition prior to commencement of such works; schedule 7 paragraph o (o)benefit from continuous vertical and lateral support for the pipeline and associated apparatus; and schedule 7 paragraph p (p)erect temporary signage and provide measures for benefit of public and personnel safety. A restrictive covenant over the Land for the benefit of the remainder of the Order land to— schedule 7 paragraph q (q)prevent any activity being undertaken on the Land which would interfere with the vertical or lateral support of the pipeline; schedule 7 paragraph r (r)prevent anything being done which may interfere with free flow and passage of carbon dioxide along the pipeline or electronic communications through the cables and fibre optic cables ancillary to the pipeline, or support for the authorised development; schedule 7 paragraph s (s)prevent anything to be done in or upon the Land or any part thereof for the purpose of the erection of any buildings or construction erection or works of any kind (including the foundations or footings thereto); schedule 7 paragraph t (t)prevent anything to be done by way of hard surfacing of the Land with concrete of any kind or with any other material or surface whatsoever without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed if the proposed surfacing would not cause damage to relevant part of the authorised development nor make it materially more difficult or expensive to maintain the authorised development); schedule 7 paragraph u (u)prevent anything to be done by way of mole draining or excavation of any kind in the Land nor any activities which would alter, increase or decrease ground cover or soil levels in any manner whatsoever without the consent in writing of the undertaker save as are reasonably required for agricultural activities (being ploughing to no deeper than 0.7m for the purposes of arable farming); schedule 7 paragraph v (v)prevent the planting or growing within the Land of any trees, shrubs or underwood without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed provided that the proposed trees, shrubs or underwood would not cause damage to the relevant part of the authorised development nor make it materially more difficult or expensive to access the relevant part of the authorised development); schedule 7 paragraph w (w)prevent, without the written consent of the undertaker, the carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt, or interfere with the exercise of the rights or damage the authorised development; and schedule 7 paragraph x (x)prevent any activity which would in the reasonable opinion of the undertaker result in the disturbance of the drainage works, ecological mitigation areas or areas of habitat creation including any ploughing or grazing without the prior written consent of the undertaker |