Article 2
SCHEDULE 1
PART 1Authorised development
A nationally significant infrastructure project as defined in sections 14 and 21 of the 2008 Act, comprising—
Work No.01 – Construction of AGI at the Immingham facility comprising equipment for the control of the authorised development, within the location shown on Sheet 1 of the Works Plan, including:
schedule 1 part 1 paragraph an1 (a)a fenced compound area containing;
schedule 1 part 1 paragraph a in1 (i)security lighting;
schedule 1 part 1 paragraph a iin1 (ii)parking;
schedule 1 part 1 paragraph a iiin1 (iii)cathodic protection measures (including grounded);
schedule 1 part 1 paragraph a ivn1 (iv)CCTV cameras, intrusion detection systems and access control systems;
schedule 1 part 1 paragraph a vn1 (v)PIG launcher and receiver facilities (including a projectile blast wall);
schedule 1 part 1 paragraph a vin1 (vi)local equipment room;
schedule 1 part 1 paragraph a viin1 (vii)control mechanisms and electrical and instrumentation kiosk;
schedule 1 paragraph a viii (viii)venting system including vent pipework, valves and vent stack;
schedule 1 paragraph a ix (ix)analyser house; and
schedule 1 paragraph a x (x)supporting utilities;
schedule 1 part 1 paragraph bn1 (b)above ground control boxes;
schedule 1 part 1 paragraph cn1 (c)above/below ground pipework and isolation valves;
schedule 1 part 1 paragraph dn1 (d)below ground cables and cable ducts;
schedule 1 part 1 paragraph en1 (e)hard standing;
schedule 1 part 1 paragraph fn1 (f)drainage works, including creation of connections to existing drainage system; and
schedule 1 part 1 paragraph gn1 (g)landscaping.
Work No.02 – Construction of a 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.1km length between Work No. 1 and Work No. 3 including:
schedule 1 part 1 paragraph an2 (a)construction and installation of the pipeline by trenched and trenchless methods, including pipeline installation in existing crossing sleeve, on existing pipe racks, trenchless installation technique pit works, the creation of reception pits, and launch pits, and installation of concrete-lined sleeve tunnels;
schedule 1 part 1 paragraph bn2 (b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
schedule 1 part 1 paragraph cn2 (c)installation of buried fibre optic cables for transfer of electronic communications;
schedule 1 part 1 paragraph dn2 (d)construction of a haul road, temporary construction accesses and working areas and laydown area;
schedule 1 part 1 paragraph en2 (e)reinstatement, ecological and environmental works; and
schedule 1 part 1 paragraph fn2 (f)drainage works including creation of connections to existing drainage system
as shown on Sheet 1 of the Works Plan.
Work No.03 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.2km length between Work No.1 and Work No.4 including:
schedule 1 part 1 paragraph an3 (a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
schedule 1 part 1 paragraph bn3 (b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
schedule 1 part 1 paragraph cn3 (c)installation of buried fibre optic cables for transfer of electronic communications;
schedule 1 part 1 paragraph dn3 (d)construction of a haul road, temporary construction accesses and working areas and laydown area;
schedule 1 part 1 paragraph en3 (e)reinstatement, ecological and environmental works; and
schedule 1 part 1 paragraph fn3 (f)drainage works including creation of connections to existing drainage system
as shown on Sheets 1 and 2 of the Works Plan.
Work No.04 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1km length between Work No. 3 and Work No. 5 including:
schedule 1 part 1 paragraph an4 (a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
schedule 1 part 1 paragraph bn4 (b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
schedule 1 part 1 paragraph cn4 (c)installation of buried fibre optic cables for transfer of electronic communications;
schedule 1 part 1 paragraph dn4 (d)construction of a haul road, temporary construction accesses and working areas and laydown area;
schedule 1 part 1 paragraph en4 (e)reinstatement, ecological and environmental works; and
schedule 1 part 1 paragraph fn4 (f)drainage works including creation of connections to existing drainage system
as shown on Sheet 2 of the Works Plan.
Work No.05 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 300 metres length between Work No. 2, Work No. 4, and Work No. 6 including:
schedule 1 part 1 paragraph an5 (a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
schedule 1 part 1 paragraph bn5 (b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
schedule 1 part 1 paragraph cn5 (c)installation of buried fibre optic cables for transfer of electronic communications;
schedule 1 part 1 paragraph dn5 (d)construction of a haul road, temporary construction accesses and working areas and laydown area;
schedule 1 part 1 paragraph en5 (e)reinstatement, ecological and environmental works; and
schedule 1 part 1 paragraph fn5 (f)drainage works including creation of connections to existing drainage system
as shown on Sheet 2 of the Works Plan.
Work No.06 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.4km length between Work No. 5 and Work No. 8 including:
schedule 1 part 1 paragraph an6 (a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
schedule 1 part 1 paragraph bn6 (b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
schedule 1 part 1 paragraph cn6 (c)installation of underground fibre optic cables for transfer of electronic communications;
schedule 1 part 1 paragraph dn6 (d)construction of a haul road, temporary construction accesses and working areas and laydown area;
schedule 1 part 1 paragraph en6 (e)reinstatement, ecological and environmental works; and
schedule 1 part 1 paragraph fn6 (f)drainage works including creation of connections to existing drainage system
as shown on Sheet 3 of the Works Plan.
Work No.07 – The creation and use of a temporary logistics and construction compound (North Construction Compound) for the use during the construction of the authorised development, within the location shown on Sheet 4 of the Works Plan, including:
schedule 1 part 1 paragraph an7 (a)temporary office, welfare and security facilities;
schedule 1 part 1 paragraph bn7 (b)a parking area;
schedule 1 part 1 paragraph cn7 (c)power supplies and lighting;
schedule 1 part 1 paragraph dn7 (d)pipe equipment and fittings storage;
schedule 1 part 1 paragraph en7 (e)plant storage;
schedule 1 part 1 paragraph fn7 (f)a fabrication area;
schedule 1 part 1 paragraph gn2 (g)workshop/repair facility;
schedule 1 part 1 paragraph hn1 (h)a plant wheel wash area;
schedule 1 part 1 paragraph in1 (i)waste management areas; and
schedule 1 part 1 paragraph jn1 (j)fencing and gating.
Work No.08 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.8km length between Work No. 6 and Work No. 9 including:
schedule 1 part 1 paragraph an8 (a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
schedule 1 part 1 paragraph bn8 (b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
schedule 1 part 1 paragraph cn8 (c)installation of underground fibre optic cables for transfer of electronic communications;
schedule 1 part 1 paragraph dn8 (d)construction of a haul road, temporary construction accesses and working areas and laydown area;
schedule 1 part 1 paragraph en8 (e)reinstatement, ecological and environmental works; and
schedule 1 part 1 paragraph fn8 (f)drainage works including creation of connections to existing drainage system
as shown on Sheet 5 of the Works Plan.
Work No.09 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.7km length between Work No. 8 and Work No. 10 including:
schedule 1 part 1 paragraph an9 (a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
schedule 1 part 1 paragraph bn9 (b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
schedule 1 part 1 paragraph cn9 (c)installation of underground fibre optic cables for transfer of electronic communications;
schedule 1 part 1 paragraph dn9 (d)construction of a haul road, temporary construction accesses and working areas and laydown area;
schedule 1 part 1 paragraph en9 (e)reinstatement, ecological and environmental works; and
schedule 1 part 1 paragraph fn9 (f)drainage works including creation of connections to existing drainage system
as shown on Sheet 6 of the Works Plan.
Work No.10 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.5km length between Work No. 9 and Work No. 11 including:
schedule 1 part 1 paragraph an10 (a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
schedule 1 part 1 paragraph bn10 (b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
schedule 1 part 1 paragraph cn10 (c)installation of underground fibre optic cables for transfer of electronic communications;
schedule 1 part 1 paragraph dn10 (d)construction of a haul road, temporary construction accesses and working areas and laydown area;
schedule 1 part 1 paragraph en10 (e)reinstatement, ecological and environmental works; and
schedule 1 part 1 paragraph fn10 (f)drainage works including creation of connections to existing drainage system
as shown on Sheet 7 of the Works Plan.
Work No.11 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.6km length between Work No. 10 and Work No. 12 including:
schedule 1 part 1 paragraph an11 (a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
schedule 1 part 1 paragraph bn11 (b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
schedule 1 part 1 paragraph cn11 (c)installation of underground fibre optic cables for transfer of electronic communications;
schedule 1 part 1 paragraph dn11 (d)construction of a haul road, temporary construction accesses and working areas and laydown area;
schedule 1 part 1 paragraph en11 (e)reinstatement, ecological and environmental works; and
schedule 1 part 1 paragraph fn11 (f)drainage works including creation of connections to existing drainage system
as shown on Sheet 8 of the Works Plan.
Work No.12 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.4km length between Work No. 11 and Work No. 13 including:
schedule 1 part 1 paragraph an12 (a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
schedule 1 part 1 paragraph bn12 (b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
schedule 1 part 1 paragraph cn12 (c)installation of underground fibre optic cables for transfer of electronic communications;
schedule 1 part 1 paragraph dn12 (d)construction of a haul road, temporary construction accesses and working areas and laydown area;
schedule 1 part 1 paragraph en12 (e)reinstatement, ecological and environmental works; and
schedule 1 part 1 paragraph fn12 (f)drainage works including creation of connections to existing drainage system
as shown on Sheet 9 of the Works Plan.
Work No.13 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.6km length between Work No. 12 and Work No. 14 including:
schedule 1 part 1 paragraph an13 (a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
schedule 1 part 1 paragraph bn13 (b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
schedule 1 part 1 paragraph cn13 (c)installation of underground fibre optic cables for transfer of electronic communications;
schedule 1 part 1 paragraph dn13 (d)construction of a haul road, temporary construction accesses and working areas and laydown area;
schedule 1 part 1 paragraph en13 (e)reinstatement, ecological and environmental works; and
schedule 1 part 1 paragraph fn13 (f)drainage works including creation of connections to existing drainage system
as shown on Sheet 10 of the Works Plan.
Work No.14 – Construction of a BVS at Washingdales Lane, within the location shown on Sheet 10 of the Works Plan, including:
schedule 1 part 1 paragraph an14 (a)a fenced compound area containing:
schedule 1 part 1 paragraph a in2 (i)security lighting and CCTV cameras;
schedule 1 part 1 paragraph a iin2 (ii)block valve;
schedule 1 part 1 paragraph a iiin2 (iii)parking area;
schedule 1 part 1 paragraph a ivn2 (iv)cathodic protection measures;
schedule 1 part 1 paragraph a vn2 (v)instrumentation and control kiosk; and
schedule 1 part 1 paragraph a vin2 (vi)vent stack;
schedule 1 part 1 paragraph bn14 (b)below ground pipework;
schedule 1 part 1 paragraph cn14 (c)above ground control boxes;
schedule 1 part 1 paragraph dn14 (d)hard standing;
schedule 1 part 1 paragraph en14 (e)soakaway type drainage system;
schedule 1 part 1 paragraph fn14 (f)landscaping;
and the following temporary requirements during construction activities:
schedule 1 part 1 paragraph gn3 (g)welfare and security facilities;
schedule 1 part 1 paragraph hn2 (h)parking area;
schedule 1 part 1 paragraph in2 (i)plant and materials storage area; and
schedule 1 part 1 paragraph jn2 (j)temporary waste management facility.
Work No.15 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 2.0km length between Work No. 13 and Work No. 16 including:
schedule 1 part 1 paragraph an15 (a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
schedule 1 part 1 paragraph bn15 (b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
schedule 1 part 1 paragraph cn15 (c)installation of underground fibre optic cables for transfer of electronic communications;
schedule 1 part 1 paragraph dn15 (d)construction of a haul road, temporary construction accesses and working areas and laydown area;
schedule 1 part 1 paragraph en15 (e)reinstatement, ecological and environmental works; and
schedule 1 part 1 paragraph fn15 (f)drainage works including creation of connections to existing drainage system
as shown on Sheet 11 of the Works Plan.
Work No.16 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.9km length between Work No. 15 and Work No. 17 including:
schedule 1 part 1 paragraph an16 (a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
schedule 1 part 1 paragraph bn16 (b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
schedule 1 part 1 paragraph cn16 (c)installation of underground fibre optic cables for transfer of electronic communications;
schedule 1 part 1 paragraph dn16 (d)construction of a haul road, temporary construction accesses and working areas and laydown area;
schedule 1 part 1 paragraph en16 (e)reinstatement, ecological and environmental works; and
schedule 1 part 1 paragraph fn16 (f)drainage works including creation of connections to existing drainage system
as shown on Sheet 12 of the Works Plan.
Work No.17 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.7km length between Work No. 16 and Work No. 18 including:
schedule 1 part 1 paragraph an17 (a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
schedule 1 part 1 paragraph bn17 (b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
schedule 1 part 1 paragraph cn17 (c)installation of underground fibre optic cables for transfer of electronic communications;
schedule 1 part 1 paragraph dn17 (d)construction of a haul road, temporary construction accesses and working areas and laydown area;
schedule 1 part 1 paragraph en17 (e)reinstatement, ecological and environmental works; and
schedule 1 part 1 paragraph fn17 (f)drainage works including creation of connections to existing drainage system
as shown on Sheet 13 of the Works Plan.
Work No.18 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.7km length between Work No. 17 and Work No. 19 including:
schedule 1 part 1 paragraph an18 (a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
schedule 1 part 1 paragraph bn18 (b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
schedule 1 part 1 paragraph cn18 (c)installation of underground fibre optic cables for transfer of electronic communications;
schedule 1 part 1 paragraph dn18 (d)construction of a haul road, temporary construction accesses and working areas and laydown area;
schedule 1 part 1 paragraph en18 (e)reinstatement, ecological and environmental works; and
schedule 1 part 1 paragraph fn18 (f)drainage works including creation of connections to existing drainage systems
as shown on Sheet 14 of the Works Plan.
Work No.19 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.6km length between Work No. 18 and Work No. 20 including:
schedule 1 part 1 paragraph an19 (a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
schedule 1 part 1 paragraph bn19 (b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
schedule 1 part 1 paragraph cn19 (c)installation of underground fibre optic cables for transfer of electronic communications;
schedule 1 part 1 paragraph dn19 (d)construction of a haul road, temporary construction accesses and working areas and laydown area;
schedule 1 part 1 paragraph en19 (e)reinstatement, ecological and environmental works; and
schedule 1 part 1 paragraph fn19 (f)drainage works including creation of connections to existing drainage system
as shown on Sheet 15 of the Works Plan.
Work No.20 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.6km length between Work No. 19 and Work No. 21 including:
schedule 1 part 1 paragraph an20 (a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
schedule 1 part 1 paragraph bn20 (b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
schedule 1 part 1 paragraph cn20 (c)installation of underground fibre optic cables for transfer of electronic communications;
schedule 1 part 1 paragraph dn20 (d)construction of a haul road, temporary construction accesses and working areas and laydown area;
schedule 1 part 1 paragraph en20 (e)reinstatement, ecological and environmental works; and
schedule 1 part 1 paragraph fn20 (f)drainage works including creation of connections to existing drainage system
as shown on Sheet 16 of the Works Plan.
Work No.21 – Construction of a BVS at Thoroughfare Road within the location shown on Sheet 16 of the Works Plan, including:
schedule 1 part 1 paragraph an21 (a)a fenced compound area containing:
schedule 1 part 1 paragraph a in3 (i)security lighting and CCTV cameras;
schedule 1 part 1 paragraph a iin3 (ii)block valve;
schedule 1 part 1 paragraph a iiin3 (iii)parking area;
schedule 1 part 1 paragraph a ivn3 (iv)cathodic protection measures
schedule 1 part 1 paragraph a vn3 (v)instrumentation and control kiosk;
schedule 1 part 1 paragraph a vin3 (vi)vent stack.
schedule 1 part 1 paragraph bn21 (b)below ground pipework;
schedule 1 part 1 paragraph cn21 (c)above ground control boxes;
schedule 1 part 1 paragraph dn21 (d)hard standing;
schedule 1 part 1 paragraph en21 (e)soakaway type drainage system;
schedule 1 part 1 paragraph fn21 (f)landscaping;
and the following temporary requirements during construction activities:
schedule 1 part 1 paragraph gn4 (g)welfare and security facilities;
schedule 1 part 1 paragraph hn3 (h)parking area;
schedule 1 part 1 paragraph in3 (i)plant and materials storage area; and
schedule 1 part 1 paragraph jn3 (j)temporary waste management facility.
Work No.22 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.6km length between Work No. 21 and Work No. 23 including:
schedule 1 part 1 paragraph an22 (a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
schedule 1 part 1 paragraph bn22 (b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
schedule 1 part 1 paragraph cn22 (c)installation of underground fibre optic cables for transfer of electronic communications;
schedule 1 part 1 paragraph dn22 (d)construction of a haul road, temporary construction accesses and working areas and laydown area;
schedule 1 part 1 paragraph en22 (e)reinstatement, ecological and environmental works; and
schedule 1 part 1 paragraph fn22 (f)drainage works including creation of connections to existing drainage system
as shown on Sheet 17 of the Works Plan.
Work No.23 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.7km length between Work No. 22 and Work No. 24 including:
schedule 1 part 1 paragraph an23 (a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
schedule 1 part 1 paragraph bn23 (b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
schedule 1 part 1 paragraph cn23 (c)installation of underground fibre optic cables for transfer of electronic communications;
schedule 1 part 1 paragraph dn23 (d)construction of a haul road, temporary construction accesses and working areas and laydown area;
schedule 1 part 1 paragraph en23 (e)reinstatement, ecological and environmental works; and
schedule 1 part 1 paragraph fn23 (f)drainage works including creation of connections to existing drainage system
as shown on Sheet 18 of the Works Plan.
Work No.24 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.5km length between Work No. 23 and Work No. 25 including:
schedule 1 part 1 paragraph an24 (a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
schedule 1 part 1 paragraph bn24 (b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
schedule 1 part 1 paragraph cn24 (c)installation of underground fibre optic cables for transfer of electronic communications;
schedule 1 part 1 paragraph dn24 (d)construction of a haul road, temporary construction accesses and working areas and laydown area;
schedule 1 part 1 paragraph en24 (e)reinstatement, ecological and environmental works; and
schedule 1 part 1 paragraph fn24 (f)drainage works including creation of connections to existing drainage system
as shown on Sheet 19 of the Works Plan.
Work No.25 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.9km length between Work No. 24 and Work No. 26 including:
schedule 1 part 1 paragraph an25 (a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
schedule 1 part 1 paragraph bn25 (b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
schedule 1 part 1 paragraph cn25 (c)installation of underground fibre optic cables for transfer of electronic communications;
schedule 1 part 1 paragraph dn25 (d)construction of a haul road, temporary construction accesses and working areas and laydown area;
schedule 1 part 1 paragraph en25 (e)reinstatement, ecological and environmental works; and
schedule 1 part 1 paragraph fn25 (f)drainage works including creation of connections to existing drainage system
as shown on Sheet 20 of the Works Plan.
Work No.26 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.6km length between Work No. 25 and Work No. 27 including:
schedule 1 part 1 paragraph an26 (a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
schedule 1 part 1 paragraph bn26 (b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
schedule 1 part 1 paragraph cn26 (c)installation of underground fibre optic cables for transfer of electronic communications;
schedule 1 part 1 paragraph dn26 (d)construction of a haul road, temporary construction accesses and working areas and laydown area;
schedule 1 part 1 paragraph en26 (e)reinstatement, ecological and environmental works; and
schedule 1 part 1 paragraph fn26 (f)drainage works including creation of connections to existing drainage system
as shown on Sheet 21 of the Works Plan.
Work No.27 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.7km length between Work No. 26 and Work No. 28 including:
schedule 1 part 1 paragraph an27 (a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
schedule 1 part 1 paragraph bn27 (b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
schedule 1 part 1 paragraph cn27 (c)installation of underground fibre optic cables for transfer of electronic communications;
schedule 1 part 1 paragraph dn27 (d)construction of a haul road, temporary construction accesses and working areas and laydown area;
schedule 1 part 1 paragraph en27 (e)reinstatement, ecological and environmental works; and
schedule 1 part 1 paragraph fn27 (f)drainage works including creation of connections to existing drainage system
as shown on Sheet 22 of the Works Plan.
Work No.28 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.7km length between Work No. 27 and Work No. 29 including:
schedule 1 part 1 paragraph an28 (a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
schedule 1 part 1 paragraph bn28 (b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
schedule 1 part 1 paragraph cn28 (c)installation of underground fibre optic cables for transfer of electronic communications;
schedule 1 part 1 paragraph dn28 (d)construction of a haul road, temporary construction accesses and working areas and laydown area;
schedule 1 part 1 paragraph en28 (e)reinstatement, ecological and environmental works; and
schedule 1 part 1 paragraph fn28 (f)drainage works including creation of connections to existing drainage system
as shown on Sheet 23 of the Works Plan.
Work No.29 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.7km length between Work No. 28 and Work No. 30 including:
schedule 1 part 1 paragraph an29 (a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
schedule 1 part 1 paragraph bn29 (b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
schedule 1 part 1 paragraph cn29 (c)installation of underground fibre optic cables for transfer of electronic communications;
schedule 1 part 1 paragraph dn29 (d)construction of a haul road, temporary construction accesses and working areas and laydown area;
schedule 1 part 1 paragraph en29 (e)reinstatement, ecological and environmental works; and
schedule 1 part 1 paragraph fn29 (f)drainage works including creation of connections to existing drainage system
as shown on Sheet 24 of the Works Plan.
Work No.30 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.5km length between Work No. 29 and Work No. 31 including:
schedule 1 part 1 paragraph an30 (a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
schedule 1 part 1 paragraph bn30 (b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
schedule 1 part 1 paragraph cn30 (c)installation of underground fibre optic cables for transfer of electronic communications;
schedule 1 part 1 paragraph dn30 (d)construction of a haul road, temporary construction accesses and working areas and laydown area;
schedule 1 part 1 paragraph en30 (e)reinstatement, ecological and environmental works; and
schedule 1 part 1 paragraph fn30 (f)drainage works including creation of connections to existing drainage system
as shown on Sheet 25 of the Works Plan.
Work No.31 – Construction of a BVS at Louth Road within the location shown on Sheet 25 and Sheet 26 of the Works Plan, including:
schedule 1 part 1 paragraph an31 (a)a fenced compound area containing:
schedule 1 part 1 paragraph a in4 (i)security lighting and CCTV cameras;
schedule 1 part 1 paragraph a iin4 (ii)block valve;
schedule 1 part 1 paragraph a iiin4 (iii)parking area;
schedule 1 part 1 paragraph a ivn4 (iv)cathodic protection measures;
schedule 1 part 1 paragraph a vn4 (v)instrumentation and control kiosk;
schedule 1 part 1 paragraph a vin4 (vi)vent stack;
schedule 1 part 1 paragraph bn31 (b)below ground pipework;
schedule 1 part 1 paragraph cn31 (c)above ground control boxes;
schedule 1 part 1 paragraph dn31 (d)hard standing;
schedule 1 part 1 paragraph en31 (e)soakaway type drainage system;
schedule 1 part 1 paragraph fn31 (f)landscaping;
and the following temporary requirements during construction activities:
schedule 1 part 1 paragraph gn5 (g)welfare and security facilities;
schedule 1 part 1 paragraph hn4 (h)parking area;
schedule 1 part 1 paragraph in4 (i)plant and materials storage area; and
schedule 1 part 1 paragraph jn4 (j)temporary waste management facility.
Work No.32 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.7km length between Work No. 31 and Work No. 33 including:
schedule 1 part 1 paragraph an32 (a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
schedule 1 part 1 paragraph bn32 (b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
schedule 1 part 1 paragraph cn32 (c)installation of underground fibre optic cables for transfer of electronic communications;
schedule 1 part 1 paragraph dn32 (d)construction of a haul road, temporary construction accesses and working areas and laydown area;
schedule 1 part 1 paragraph en32 (e)reinstatement, ecological and environmental works; and
schedule 1 part 1 paragraph fn32 (f)drainage works including creation of connections to existing drainage system
as shown on Sheet 26 of the Works Plan.
Work No.33 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.5km length between Work No. 32 and Work No. 34 including:
schedule 1 part 1 paragraph an33 (a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
schedule 1 part 1 paragraph bn33 (b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
schedule 1 part 1 paragraph cn33 (c)installation of underground fibre optic cables for transfer of electronic communications;
schedule 1 part 1 paragraph dn33 (d)construction of a haul road, temporary construction accesses and working areas and laydown area;
schedule 1 part 1 paragraph en33 (e)reinstatement, ecological and environmental works; and
schedule 1 part 1 paragraph fn33 (f)drainage works including creation of connections to existing drainage system
as shown on Sheet 27 of the Works Plan.
Work No.34 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.5km length between Work No. 33 and Work No. 35 including:
schedule 1 part 1 paragraph an34 (a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
schedule 1 part 1 paragraph bn34 (b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
schedule 1 part 1 paragraph cn34 (c)installation of underground fibre optic cables for transfer of electronic communications;
schedule 1 part 1 paragraph dn34 (d)construction of a haul road, temporary construction accesses and working areas and laydown area;
schedule 1 part 1 paragraph en34 (e)reinstatement, ecological and environmental works; and
schedule 1 part 1 paragraph fn34 (f)drainage works including creation of connections to existing drainage system
as shown on Sheet 28 of the Works Plan.
Work No.35 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.8km length between Work No. 34 and Work No. 36 including:
schedule 1 part 1 paragraph an35 (a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
schedule 1 part 1 paragraph bn35 (b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
schedule 1 part 1 paragraph cn35 (c)installation of underground fibre optic cables for transfer of electronic communications;
schedule 1 part 1 paragraph dn35 (d)construction of a haul road, temporary construction accesses and working areas and laydown area;
schedule 1 part 1 paragraph en35 (e)reinstatement, ecological and environmental works; and
schedule 1 part 1 paragraph fn35 (f)drainage works including creation of connections to existing drainage system
as shown on Sheet 29 of the Works Plan.
Work No.36 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.7km length between Work No. 35 and Work No. 37 including:
schedule 1 part 1 paragraph an36 (a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
schedule 1 part 1 paragraph bn36 (b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
schedule 1 part 1 paragraph cn36 (c)installation of underground fibre optic cables for transfer of electronic communications;
schedule 1 part 1 paragraph dn36 (d)construction of a haul road, temporary construction accesses and working areas and laydown area;
schedule 1 part 1 paragraph en36 (e)reinstatement, ecological and environmental works; and
schedule 1 part 1 paragraph fn36 (f)drainage works including creation of connections to existing drainage system
as shown on Sheet 30 of the Works Plan.
Work No.37 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.9km length between Work No. 36 and Work No. 38 including:
schedule 1 part 1 paragraph an37 (a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
schedule 1 part 1 paragraph bn37 (b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
schedule 1 part 1 paragraph cn37 (c)installation of underground fibre optic cables for transfer of electronic communications;
schedule 1 part 1 paragraph dn37 (d)construction of a haul road, temporary construction accesses and working areas and laydown area;
schedule 1 part 1 paragraph en37 (e)reinstatement, ecological and environmental works; and
schedule 1 part 1 paragraph fn37 (f)drainage works including creation of connections to existing drainage system
as shown on Sheet 31 of the Works Plan.
Work No.37a – Construction and use of a temporary access and laydown location at Lordship Road for use during the construction of the authorised development at the location shown on Sheet 31 of the Works Plan including:
schedule 1 part 1 paragraph an38 (a)temporary office, welfare and security facilities;
schedule 1 part 1 paragraph bn38 (b)a parking area;
schedule 1 part 1 paragraph cn38 (c)laydown / materials storage area;
schedule 1 part 1 paragraph dn38 (d)waste management facilities; and
schedule 1 part 1 paragraph en38 (e)fencing and gating.
Work No.38 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.9km length between Work No. 37 and Work No. 39 including:
schedule 1 part 1 paragraph an39 (a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
schedule 1 part 1 paragraph bn39 (b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
schedule 1 part 1 paragraph cn39 (c)installation of underground fibre optic cables for transfer of electronic communications;
schedule 1 part 1 paragraph dn39 (d)construction of a haul road, temporary construction accesses and working areas and laydown area;
schedule 1 part 1 paragraph en39 (e)reinstatement, ecological and environmental works; and
schedule 1 part 1 paragraph fn38 (f)drainage works including creation of connections to existing drainage system
as shown on Sheet 32 of the Works Plan.
Work No.39 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.6km length between Work No. 38 and Work No. 40 including:
schedule 1 part 1 paragraph an40 (a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
schedule 1 part 1 paragraph bn40 (b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
schedule 1 part 1 paragraph cn40 (c)installation of underground fibre optic cables for transfer of electronic communications;
schedule 1 part 1 paragraph dn40 (d)construction of a haul road, temporary construction accesses and working areas and laydown area;
schedule 1 part 1 paragraph en40 (e)reinstatement, ecological and environmental works; and
schedule 1 part 1 paragraph fn39 (f)drainage works including creation of connections to existing drainage system
as shown on Sheet 33 of the Works Plan.
Work No.40 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 1.5km length between Work No. 39 and Work No. 41 including:
schedule 1 part 1 paragraph an41 (a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
schedule 1 part 1 paragraph bn41 (b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
schedule 1 part 1 paragraph cn41 (c)installation of underground fibre optic cables for transfer of electronic communications;
schedule 1 part 1 paragraph dn41 (d)construction of a haul road, temporary construction accesses and working areas and laydown area;
schedule 1 part 1 paragraph en41 (e)reinstatement, ecological and environmental works; and
schedule 1 part 1 paragraph fn40 (f)drainage works including creation of connections to existing drainage system
as shown on Sheet 34 of the Works Plan.
Work No.41 – Construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 437 metres length between Work No. 40 and Work No. 43 including:
schedule 1 part 1 paragraph an42 (a)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
schedule 1 part 1 paragraph bn42 (b)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
schedule 1 part 1 paragraph cn42 (c)installation of underground fibre optic cables for transfer of electronic communications;
schedule 1 part 1 paragraph dn42 (d)construction of a haul road, temporary construction accesses and working areas and laydown area;
schedule 1 part 1 paragraph en42 (e)reinstatement, ecological and environmental works; and
schedule 1 part 1 paragraph fn41 (f)drainage works including creation of connections to existing drainage system
as shown on Sheet 35 of the Works Plan.
Work No.43 –
schedule 1 part 1 paragraph an43 (a)construction of a buried 24-inch (610 millimetre) external diameter Carbon Dioxide (CO2) pipeline section of approximately 304 metres length between Work No. 41 and Work No. 44 including:
schedule 1 part 1 paragraph a in5 (i)construction and installation of the pipeline by trenched and trenchless methods, including trenchless installation technique pit works, the creation of reception pits, and launch pits;
schedule 1 part 1 paragraph a iin5 (ii)installation of pipeline marker posts and cathodic protection test posts along the pipeline route;
schedule 1 part 1 paragraph a iiin5 (iii)installation of underground fibre optic cables for transfer of electronic communications;
schedule 1 part 1 paragraph a ivn5 (iv)construction of a haul road, temporary construction accesses and working areas and laydown area;
schedule 1 part 1 paragraph a vn5 (v)reinstatement, ecological and environmental works; and
schedule 1 part 1 paragraph a vin5 (vi)drainage works including creation of connections to existing drainage system
as shown on Sheet 35 of the Works Plan.
Work No.44 –
schedule 1 part 1 paragraph an44 (a)construction of an AGI comprising equipment for the control and interface of the pipeline to the Theddlethorpe Facility, within the location shown on Sheet 35 of the Works Plan, including:
schedule 1 part 1 paragraph a in6 (i)a fenced compound area containing;
schedule 1 paragraph a i aa (aa)security lighting;
schedule 1 paragraph a i bb (bb)parking;
schedule 1 paragraph a i cc (cc)cathodic protection measures (including groundbeds)
schedule 1 paragraph a i dd (dd)CCTV cameras, intrusion detection systems and access control systems;
schedule 1 paragraph a i ee (ee)PIG launcher and receiver facilities (including a projectile blast wall);
schedule 1 paragraph a i ff (ff)local equipment room;
schedule 1 paragraph a i gg (gg)supporting infrastructure;
schedule 1 paragraph a i hh (hh)control mechanisms and electrical and instrumentation kiosk; and
schedule 1 paragraph a i ii (ii)venting system including vent pipework, valves and vent stack;
schedule 1 part 1 paragraph a iin6 (ii)above ground control boxes
schedule 1 part 1 paragraph a iiin6 (iii)above/below ground pipework and isolation valves;
schedule 1 part 1 paragraph a ivn6 (iv)below ground cables and cable ducts;
schedule 1 part 1 paragraph a vn6 (v)hard standing;
schedule 1 part 1 paragraph a vin6 (vi)drainage works, including creation of connections to existing drainage system; and
schedule 1 part 1 paragraph a viin2 (vii)landscaping.
Work No.47 – The creation and use of a temporary logistics and construction compound (Southern Construction Compound) for the use during the construction of the authorised development, within the location shown on Sheet 35 of the Works Plan, including:
schedule 1 part 1 paragraph an45 (a)welfare and security facilities;
schedule 1 part 1 paragraph bn43 (b)a parking area;
schedule 1 part 1 paragraph cn43 (c)temporary lighting;
schedule 1 part 1 paragraph dn43 (d)pipe equipment and fittings storage;
schedule 1 part 1 paragraph en43 (e)plant storage;
schedule 1 part 1 paragraph fn42 (f)a plant wheel wash area;
schedule 1 part 1 paragraph gn6 (g)waste processing and management areas; and
schedule 1 part 1 paragraph hn5 (h)fencing and gating.
Work No.48 – Removal and replacement of an existing isolation valve with a new isolation valve at the Dune Valve Station, within the location shown on Sheet 36 of the Works Plan.
Associated Development
Associated development within the meaning of section 115(2) of the 2008 Act comprising—
Work No.01a – The creation and use of a temporary working area for use during the construction of the AGI works at the Immingham facility, within the location shown on Sheet 1 of the Works Plan, including;
schedule 1 part 1 paragraph wrapper1 an1 (a)office, welfare and security facilities;
schedule 1 part 1 paragraph wrapper1 bn1 (b)a parking area;
schedule 1 part 1 paragraph wrapper1 cn1 (c)plant and materials storage;
schedule 1 part 1 paragraph wrapper1 dn1 (d)waste processing and management areas; and
schedule 1 part 1 paragraph wrapper1 en1 (e)fencing and gating.
Work No.01b – The creation and use of a vehicular access to Work No. 1 from Rosper Road, within the location shown on Sheet 1 of the Works Plan, including;
schedule 1 part 1 paragraph wrapper1 an2 (a)improvement of road surfacing and provision of new hard surfacing;
schedule 1 part 1 paragraph wrapper1 bn2 (b)creation of a new bellmouth junction and visibility splays; and
schedule 1 part 1 paragraph wrapper1 cn2 (c)installation of utilities.
Work No.01c – Installation and use of cables and fibre optic cables within Rosper Road to the Immingham facility as shown on Sheet 1 of the Works Plan for supply of electricity and electronic communications.
Work No.03a – Construction and use of a temporary access and laydown location at Humber Road for use during construction of the authorised development at the location shown on Sheet 1 of the Works Plan including:
schedule 1 part 1 paragraph wrapper1 an3 (a)temporary office, welfare and security facilities;
schedule 1 part 1 paragraph wrapper1 bn3 (b)a parking area; and
schedule 1 part 1 paragraph wrapper1 cn3 (c)fencing and gating.
Work No.03b – Construction and use of a temporary access and laydown location at A1173 – Manby Road for use during the construction of the authorised development at the location shown on Sheet 1 of the Works Plan including:
schedule 1 part 1 paragraph wrapper1 an4 (a)temporary office, welfare and security facilities;
schedule 1 part 1 paragraph wrapper1 bn4 (b)a parking area;
schedule 1 part 1 paragraph wrapper1 cn4 (c)laydown / materials storage area;
schedule 1 part 1 paragraph wrapper1 dn2 (d)waste management facilities; and
schedule 1 part 1 paragraph wrapper1 en2 (e)fencing and gating.
Work No.06a – Construction and use of a temporary access and laydown location at Habrough Road for use during the construction of the authorised development at the location shown on Sheet 3 of the Works Plan including:
schedule 1 part 1 paragraph wrapper1 an5 (a)temporary office, welfare and security facilities;
schedule 1 part 1 paragraph wrapper1 bn5 (b)a parking area;
schedule 1 part 1 paragraph wrapper1 cn5 (c)laydown / materials storage area;
schedule 1 part 1 paragraph wrapper1 dn3 (d)waste management facilities; and
schedule 1 part 1 paragraph wrapper1 en3 (e)fencing and gating.
Work No.07a – Creation and use of temporary access from Habrough Road, within the location shown on Sheet 4 of the Works Plan, including:
schedule 1 part 1 paragraph wrapper1 an6 (a)improvement of an existing junction with the public road; and
schedule 1 part 1 paragraph wrapper1 bn6 (b)improvement of road surfacing (i.e. temporary stone surface).
Work No.07b – Installation and use of cables and fibre optic cables from within Habrough Road as shown on Sheet 4 of the Works Plan for supply of electricity and electronic communications.
Work No.08a – Construction and use of a temporary access and laydown location at Roxton Road for use during the construction of the authorised development at the location shown on Sheet 5 of the Works Plan including:
schedule 1 part 1 paragraph wrapper1 an7 (a)temporary office, welfare and security facilities;
schedule 1 part 1 paragraph wrapper1 bn7 (b)a parking area;
schedule 1 part 1 paragraph wrapper1 cn6 (c)laydown / materials storage area;
schedule 1 part 1 paragraph wrapper1 dn4 (d)waste management facilities; and
schedule 1 part 1 paragraph wrapper1 en4 (e)fencing and gating.
Work No.09a – Creation and use of a temporary access from Roxton Road for construction of the authorised development, within the location shown on Sheet 6 of the Works Plan, including:
schedule 1 part 1 paragraph wrapper1 an8 (a)improvement of an existing junction with the public road; and
schedule 1 part 1 paragraph wrapper1 bn8 (b)improvement of road surfacing (i.e. temporary stone surface).
Work No.10a – Construction and use of a temporary access and laydown location at Keelby Road for use during the construction of the authorised development at the location shown on Sheet 7 of the Works Plan including:
schedule 1 part 1 paragraph wrapper1 an9 (a)temporary office, welfare and security facilities;
schedule 1 part 1 paragraph wrapper1 bn9 (b)a parking area;
schedule 1 part 1 paragraph wrapper1 cn7 (c)laydown / materials storage area;
schedule 1 part 1 paragraph wrapper1 dn5 (d)waste management facilities; and
schedule 1 part 1 paragraph wrapper1 en5 (e)fencing and gating.
Work No.11a – Construction and use of a temporary access and laydown location at A1173 – Riby Road for use during the construction of the authorised development at the location shown on Sheet 8 of the Works Plan including:
schedule 1 part 1 paragraph wrapper1 an10 (a)temporary office, welfare and security facilities;
schedule 1 part 1 paragraph wrapper1 bn10 (b)a parking area;
schedule 1 part 1 paragraph wrapper1 cn8 (c)laydown / materials storage area;
schedule 1 part 1 paragraph wrapper1 dn6 (d)waste management facilities; and
schedule 1 part 1 paragraph wrapper1 en6 (e)fencing and gating.
Work No.12a – Creation and use of a temporary access on Lay-By off A18 – Barton Street for construction of the authorised development, within the location shown on Sheet 9 of the Works Plan, including:
schedule 1 part 1 paragraph wrapper1 an11 (a)improvement of an existing junction with the public road; and
schedule 1 part 1 paragraph wrapper1 bn11 (b)improvement of road surfacing (i.e. temporary stone surface).
Work No.12b – Creation and use of a temporary access on Lay-By off A18 – Barton Street for construction of the authorised development, within the location shown on Sheet 9 of the Works Plan, including:
schedule 1 part 1 paragraph wrapper1 an12 (a)improvement of an existing junction with the public road; and
schedule 1 part 1 paragraph wrapper1 bn12 (b)improvement of road surfacing (i.e. temporary stone surface).
Work No.13a – Construction and use of a temporary access and laydown location at Washingdales Lane for use during the construction of the authorised development at the location shown on Sheet 10 of the Works Plan including:
schedule 1 part 1 paragraph wrapper1 an13 (a)temporary office, welfare and security facilities;
schedule 1 part 1 paragraph wrapper1 bn13 (b)a parking area;
schedule 1 part 1 paragraph wrapper1 cn9 (c)laydown / materials storage area;
schedule 1 part 1 paragraph wrapper1 dn7 (d)waste management facilities; and
schedule 1 part 1 paragraph wrapper1 en7 (e)fencing and gating.
Work No.14a – Creation and use of a vehicular access from Washingdales Lane to Work No. 14, within the location shown on Sheet 10 of the Works Plan, including:
schedule 1 part 1 paragraph wrapper1 an14 (a)improvement of road surfacing and provision of new hard surfacing;
schedule 1 part 1 paragraph wrapper1 bn14 (b)creation of a new bellmouth junction and visibility splays; and
schedule 1 part 1 paragraph wrapper1 cn10 (c)installation of utilities.
Work No.14b – Installation and use of cables and fibre optic cables within A18 (Barton Street) to Work No. 14 as shown on Sheet 10 of the Works Plan for supply of electricity and electronic communications.
Work No.15b – Construction and use of a temporary access and laydown location at Road A46 for use during the construction of the authorised development at the location shown on Sheet 11 of the Works Plan including:
schedule 1 part 1 paragraph wrapper1 an15 (a)temporary office, welfare and security facilities;
schedule 1 part 1 paragraph wrapper1 bn15 (b)a parking area;
schedule 1 part 1 paragraph wrapper1 cn11 (c)laydown / materials storage area;
schedule 1 part 1 paragraph wrapper1 dn8 (d)waste management facilities; and
schedule 1 part 1 paragraph wrapper1 en8 (e)fencing and gating.
Work No.15c – Construction and use of a temporary access and laydown location at Old Main Road for use during the construction of the authorised development at the location shown on Sheet 11 of the Works Plan including:
schedule 1 part 1 paragraph wrapper1 an16 (a)temporary office, welfare and security facilities;
schedule 1 part 1 paragraph wrapper1 bn16 (b)a parking area;
schedule 1 part 1 paragraph wrapper1 cn12 (c)laydown / materials storage area;
schedule 1 part 1 paragraph wrapper1 dn9 (d)waste management facilities; and
schedule 1 part 1 paragraph wrapper1 en9 (e)fencing and gating.
Work No.16b – The creation and use of a temporary logistics and construction compound (Central Construction Compound) for use during the construction of the authorised development, within the location shown on Sheet 12 of the Works Plan including:
schedule 1 part 1 paragraph wrapper1 an17 (a)office, welfare and security facilities;
schedule 1 part 1 paragraph wrapper1 bn17 (b)a parking area;
schedule 1 part 1 paragraph wrapper1 cn13 (c)temporary lighting;
schedule 1 part 1 paragraph wrapper1 dn10 (d)pipe equipment and fittings storage;
schedule 1 part 1 paragraph wrapper1 en10 (e)plant storage;
schedule 1 paragraph wrapper1 f (f)a plant wheel wash area;
schedule 1 paragraph wrapper1 g (g)waste management areas; and
schedule 1 paragraph wrapper1 h (h)fencing and gating.
Work No.16c – Creation and use of a temporary access from Road A18 (Barton Street) for construction of the authorised development, within the location shown on Sheet 12 of the Works Plan, including:
schedule 1 part 1 paragraph wrapper1 an18 (a)creation of a new bellmouth junction with the public highway; and
schedule 1 part 1 paragraph wrapper1 bn18 (b)improvement of road surfacing (i.e. temporary stone surface).
Work No.17a – Construction and use of a temporary access and laydown location at Beelsby Road for use during the construction of the authorised development at the location shown on Sheet 13 of the Works Plan including:
schedule 1 part 1 paragraph wrapper1 an19 (a)temporary office, welfare and security facilities;
schedule 1 part 1 paragraph wrapper1 bn19 (b)a parking area;
schedule 1 part 1 paragraph wrapper1 cn14 (c)laydown / materials storage area;
schedule 1 part 1 paragraph wrapper1 dn11 (d)waste management facilities; and
schedule 1 part 1 paragraph wrapper1 en11 (e)fencing and gating.
Work No.17b – Creation and use of a temporary access from Road A18 (Barton Street) for construction of the authorised development, within the location shown on Sheet 13 of the Works Plan, including:
schedule 1 part 1 paragraph wrapper1 an20 (a)creation of a new bellmouth junction with the public road; and
schedule 1 part 1 paragraph wrapper1 bn20 (b)improvement of road surfacing (i.e. temporary stone surface).
Work No.18a – Creation and use of a temporary access for construction of the authorised development within the location shown on Sheet 14 of the Works Plan, including:
schedule 1 part 1 paragraph wrapper1 an21 (a)creation of a new bellmouth junction with the public road; and
schedule 1 part 1 paragraph wrapper1 bn21 (b)installation of road surfacing (i.e. temporary stone surface).
Work No.21a – Creation and use of a vehicular access from Thoroughfare Road to Work No. 21, within the location shown on Sheet 16 of the Works Plan, including:
schedule 1 part 1 paragraph wrapper1 an22 (a)improvement of road surfacing and provision of new hard surfacing;
schedule 1 part 1 paragraph wrapper1 bn22 (b)creation of a new bellmouth junction and visibility splays; and
schedule 1 part 1 paragraph wrapper1 cn15 (c)installation of utilities.
Work No.21b – Installation and use of cables and fibre optic cables within Thoroughfare Road to Work No. 21 as shown on Sheet 16 of the Works Plan for supply of electricity and electronic communications.
Work No.21c – Creation and use of a temporary access from Thoroughfare Road for construction of the authorised development, within the location shown on Sheet 16 of the Works Plan, including:
schedule 1 part 1 paragraph wrapper1 an23 (a)improvement of an existing junction with the public road; and
schedule 1 part 1 paragraph wrapper1 bn23 (b)improvement of road surfacing (i.e. temporary stone surface).
Work No.24a – Construction and use of a temporary access and laydown location at White Road for use during the construction of the authorised development at the location shown on Sheet 19 of the Works Plan including:
schedule 1 part 1 paragraph wrapper1 an24 (a)temporary office, welfare and security facilities;
schedule 1 part 1 paragraph wrapper1 bn24 (b)a parking area;
schedule 1 part 1 paragraph wrapper1 cn16 (c)laydown / materials storage area;
schedule 1 part 1 paragraph wrapper1 dn12 (d)waste management facilities; and
schedule 1 part 1 paragraph wrapper1 en12 (e)fencing and gating.
Work No.24b – Creation and use of a temporary access from White Road for construction of the authorised development, within the location shown on Sheet 19 of the Works Plan, including:
schedule 1 part 1 paragraph wrapper1 an25 (a)improvement of an existing junction with the public road; and
schedule 1 part 1 paragraph wrapper1 bn25 (b)improvement of road surfacing (i.e. temporary stone surface).
Work No.24c – Construction and use of a temporary access and laydown location at White Road for use during the construction of the authorised development at the location shown on Sheet 19 of the Works Plan including:
schedule 1 part 1 paragraph wrapper1 an26 (a)temporary office, welfare and security facilities;
schedule 1 part 1 paragraph wrapper1 bn26 (b)a parking area; and
schedule 1 part 1 paragraph wrapper1 cn17 (c)fencing and gating.
Work No.25a – Creation and use of a temporary access from Road A16 for construction of the authorised development, within the location shown on Sheet 20 of the Works Plan, including:
schedule 1 part 1 paragraph wrapper1 an27 (a)improvement of an existing junction with the public road; and
schedule 1 part 1 paragraph wrapper1 bn27 (b)improvement of road surfacing (i.e. temporary stone surface).
Work No.25b – Creation and use of a temporary access from Road A16 for construction of the authorised development, within the location shown on Sheet 20 of the Works Plan, including:
schedule 1 part 1 paragraph wrapper1 an28 (a)improvement of an existing junction with the public road; and
schedule 1 part 1 paragraph wrapper1 bn28 (b)improvement of road surfacing (i.e. temporary stone surface).
Work No.25c – Construction and use of a temporary access and laydown location at Road A16 – Louth Road for use during the construction of the authorised development at the location shown on Sheet 20 of the Works Plan including:
schedule 1 part 1 paragraph wrapper1 an29 (a)temporary office, welfare and security facilities;
schedule 1 part 1 paragraph wrapper1 bn29 (b)a parking area; and
schedule 1 part 1 paragraph wrapper1 cn18 (c)fencing and gating.
Work No.26a – Construction and use of a temporary access and laydown location at Pear Tree Lane for use during the construction of the authorised development at the location shown on Sheet 21 of the Works Plan including:
schedule 1 part 1 paragraph wrapper1 an30 (a)temporary office, welfare and security facilities;
schedule 1 part 1 paragraph wrapper1 bn30 (b)a parking area;
schedule 1 part 1 paragraph wrapper1 cn19 (c)laydown / materials storage area;
schedule 1 part 1 paragraph wrapper1 dn13 (d)waste management facilities; and
schedule 1 part 1 paragraph wrapper1 en13 (e)fencing and gating.
Work No.28a – Construction and use of a temporary access and laydown location at Fotherby Road (Little Grimsby Lane) for use during the construction of the authorised development at the location shown on Sheet 23 of the Works Plan including:
schedule 1 part 1 paragraph wrapper1 an31 (a)temporary office, welfare and security facilities;
schedule 1 part 1 paragraph wrapper1 bn31 (b)a parking area; and
schedule 1 part 1 paragraph wrapper1 cn20 (c)fencing and gating.
Work No.29a – Creation and use of a temporary construction access from Brackenborough Road for construction of the authorised development, within the location shown on Sheet 24 of the Works Plan, including:
schedule 1 part 1 paragraph wrapper1 an32 (a)creation of a new bellmouth junction with the public road; and
schedule 1 part 1 paragraph wrapper1 bn32 (b)improvement of road surfacing (i.e. temporary stone surface).
Work No.29b – Creation and use of a temporary construction access from Brackenborough Road for construction of the authorised development, within the location shown on Sheet 24 of the Works Plan, including:
schedule 1 part 1 paragraph wrapper1 an33 (a)creation of a new bellmouth junction with the public road; and
schedule 1 part 1 paragraph wrapper1 bn33 (b)improvement of road surfacing (i.e. temporary stone surface).
Work No.31a – Creation and use of a vehicular access from Louth Road to Work No. 31, within the location shown on Sheet 25 and Sheet 26 of the Works Plan, including:
schedule 1 part 1 paragraph wrapper1 an34 (a)improvement of road surfacing and provision of new hard surfacing;
schedule 1 part 1 paragraph wrapper1 bn34 (b)creation of a new bellmouth junction and visibility splays; and
schedule 1 part 1 paragraph wrapper1 cn21 (c)installation of utilities.
Work No.31b – Installation and use of cables and fibre optic cables within Louth Road to Work No. 30 as shown on Sheet 25 and Sheet 26 of the Works Plan for supply of electricity and electronic communications.
Work No.32a - Construction and use of a temporary access and laydown location at Louth Road for use during the construction of the authorised development at the location shown on Sheet 25 and Sheet 26 of the Works Plan including:
schedule 1 part 1 paragraph wrapper1 an35 (a)temporary office, welfare and security facilities;
schedule 1 part 1 paragraph wrapper1 bn35 (b)a parking area;
schedule 1 part 1 paragraph wrapper1 cn22 (c)laydown / materials storage area;
schedule 1 part 1 paragraph wrapper1 dn14 (d)waste management facilities; and
schedule 1 part 1 paragraph wrapper1 en14 (e)fencing and gating.
Work No.33a – Construction and use of a temporary access and laydown location at Louth Road for use during the construction of the authorised development at the location shown on Sheet 27 of the Works Plan including:
schedule 1 part 1 paragraph wrapper1 an36 (a)temporary office, welfare and security facilities;
schedule 1 part 1 paragraph wrapper1 bn36 (b)a parking area;
schedule 1 part 1 paragraph wrapper1 cn23 (c)laydown / materials storage area;
schedule 1 part 1 paragraph wrapper1 dn15 (d)waste management facilities; and
schedule 1 part 1 paragraph wrapper1 en15 (e)fencing and gating.
Work No.34a – Construction and use of a temporary access and laydown location at Marsh Lane for use during the construction of the authorised development at the location shown on Sheet 28 of the Works Plan including:
schedule 1 part 1 paragraph wrapper1 an37 (a)temporary office, welfare and security facilities;
schedule 1 part 1 paragraph wrapper1 bn37 (b)a parking area; and
schedule 1 part 1 paragraph wrapper1 cn24 (c)fencing and gating.
Work No.34b – Creation and use of a temporary construction access from Red Leas Lane for construction of the authorised development, within the location shown on Sheet 28 of the Works Plan, including:
schedule 1 part 1 paragraph wrapper1 an38 (a)creation of a new bellmouth junction with the public road; and
schedule 1 part 1 paragraph wrapper1 bn38 (b)improvement of road surfacing (i.e. temporary stone surface).
Work No.34c – Creation and use of a temporary construction access from Pick Hill Lane for construction of the authorised development, within the location shown on Sheet 28 of the Works Plan, including:
schedule 1 part 1 paragraph wrapper1 an39 (a)creation of a new bellmouth junction with the public road; and
schedule 1 part 1 paragraph wrapper1 bn39 (b)improvement of road surfacing (i.e. temporary stone surface).
Work No.36a – Creation and use of a temporary construction access from B1200 - Manby Middlegate Road for construction of the authorised development, within the location shown on Sheet 30 of the Works Plan, including:
schedule 1 part 1 paragraph wrapper1 an40 (a)creation of a new bellmouth junction with the public road; and
schedule 1 part 1 paragraph wrapper1 bn40 (b)improvement of road surfacing (i.e. temporary stone surface).
Work No.36b – Construction and use of a temporary access and laydown location at B1200 – Manby Middlegate Road for use during the construction of the authorised development at the location shown on Sheet 30 of the Works Plan including:
schedule 1 part 1 paragraph wrapper1 an41 (a)temporary office, welfare and security facilities;
schedule 1 part 1 paragraph wrapper1 bn41 (b)a parking area;
schedule 1 part 1 paragraph wrapper1 cn25 (c)laydown / materials storage area;
schedule 1 part 1 paragraph wrapper1 dn16 (d)waste management facilities; and
schedule 1 part 1 paragraph wrapper1 en16 (e)fencing and gating.
Work No.36c – Construction and use of a temporary access and laydown location at B1200 Manby Middlegate Road for use during the construction of the authorised development at the location shown on Sheet 30 of the Works Plan including:
schedule 1 part 1 paragraph wrapper1 an42 (a)temporary office, welfare and security facilities;
schedule 1 part 1 paragraph wrapper1 bn42 (b)a parking area;
schedule 1 part 1 paragraph wrapper1 cn26 (c)laydown / materials storage area;
schedule 1 part 1 paragraph wrapper1 dn17 (d)waste management facilities; and
schedule 1 part 1 paragraph wrapper1 en17 (e)fencing and gating.
Work No.36d – Improvement and use of an existing track as a temporary access for construction of the authorised development within the location shown on Sheet 30 of the Works Plan, including:
schedule 1 part 1 paragraph wrapper1 an43 (a)improvement of an existing track access; and
schedule 1 part 1 paragraph wrapper1 bn43 (b)improvement of the track surfacing (i.e. temporary stone surface).
Work No.40a – Construction and use of a temporary access and laydown location at Mill Road for use during the construction of the authorised development at the location shown on Sheet 34 of the Works Plan including:
schedule 1 part 1 paragraph wrapper1 an44 (a)temporary office, welfare and security facilities;
schedule 1 part 1 paragraph wrapper1 bn44 (b)a parking area; and
schedule 1 part 1 paragraph wrapper1 cn27 (c)fencing and gating.
Work No.41a – Creation and use of a temporary construction access from A1031- Maplethorpe Road for construction of the authorised development, within the location shown on Sheets 34 and 35 of the Works Plan, including:
schedule 1 part 1 paragraph wrapper1 an45 (a)creation of a new bellmouth junction with the public road; and
schedule 1 part 1 paragraph wrapper1 bn45 (b)improvement of road surfacing and provision of new hard surfacing.
Work No.41b – Construction and use of a temporary access and laydown location at Maplethorpe Road for use during the construction of the authorised development including trenchless crossing installation works at A1031- Maplethorpe Road within the location shown on Sheets 34 and 35 of the Works Plan, including:
schedule 1 part 1 paragraph wrapper1 an46 (a)office, welfare and security facilities;
schedule 1 part 1 paragraph wrapper1 bn46 (b)a parking area;
schedule 1 part 1 paragraph wrapper1 cn28 (c)laydown / materials storage area;
schedule 1 part 1 paragraph wrapper1 dn18 (d)waste processing and management areas; and
schedule 1 part 1 paragraph wrapper1 en18 (e)fencing and gating.
Work No.44a –improvement and use of an existing vehicular access from A1031- Maplethorpe Road to Work No. 44, within the location shown on Sheet 35 of the Works Plan, including improvement of existing road surfacing.
Work No.45 – Installation and use of cables and fibre optic cables to the Theddlethorpe Facility within the location shown on Sheet 35 of the Works Plan for supply of electricity and electronic communications.
Work No.46 – Creation and use of a temporary access for construction of the authorised development, within the location shown on Sheet 35 of the Works Plan, including:
schedule 1 part 1 paragraph wrapper1 an47 (a)creation of a new bellmouth junction with the existing road; and
schedule 1 part 1 paragraph wrapper1 bn47 (b)improvement of road surfacing (i.e. temporary stone surface).
Work No.47a – Improvement and use of an existing vehicular access for construction of the authorised development from A1031- Maplethorpe Road to Work No. 47, within the location shown on Sheet 35 of the Works Plan, including improvement of existing road surfacing.
Work No.48a –
schedule 1 part 1 paragraph wrapper1 an48 (a)installation and use of cables and fibre optic cables from Work No. 44 to Work No. 48 as shown on Sheets 35 and 36 of the Works Plan for supply of electricity and electronic communications;
Work No.48b – The creation and use of a vehicular access to Work No. 48 from North End Road, Mablethorpe within the location shown on Sheet 36 of the Works Plan including;
schedule 1 part 1 paragraph wrapper1 an49 (a)installation of any required visibility splay at an existing junction with the public road;
schedule 1 part 1 paragraph wrapper1 bn48 (b)road surfacing and provision of new hard surfacing; and
schedule 1 part 1 paragraph wrapper1 cn29 (c)installation of utilities.
Work No.48c – The creation and use of a temporary working area for use during the construction of the authorised development, within the location shown on the Works Plan, including construction of a temporary construction accesses and laydown area.
Further Associated Development
In connection with any of those works, within the Order limits, development comprising such other works as may be necessary or expedient for the purposes of or in connection with the relevant part of the authorised development which fall within the scope of work assessed in the environmental statement, including—
schedule 1 paragraph wrapper2 a (a)site preparation works, site clearance (including fencing, vegetation removal, demolition of existing structures and the creation of alternative footpaths); earthworks (including soil stripping and storage and site levelling) and pre-construction drainage works;
schedule 1 paragraph wrapper2 b (b)installation of wires, cables, conductors, pipes and ducts;
schedule 1 paragraph wrapper2 c (c)establishment of winching points and installation of temporary scaffolding;
schedule 1 paragraph wrapper2 d (d)construction works including—
schedule 1 paragraph wrapper2 d i (i)works to enable power supplies and temporary lighting;
schedule 1 paragraph wrapper2 d ii (ii)establishment of temporary working areas;
schedule 1 paragraph wrapper2 d iii (iii)installation of demarcation fencing/stockproof fencing/heras fencing or similar;
schedule 1 paragraph wrapper2 d iv (iv)earthworks;
schedule 1 paragraph wrapper2 d v (v)aerial markers, cathodic protection test posts, cathodic protection rectifier cabinets, sacrificial anodes, field boundary markers, manholes, marker posts, underground markers, tiles and tape;
schedule 1 paragraph wrapper2 e (e)works to place, alter, divert, relocate, remove or maintain the position of apparatus, services, plant and other equipment in a street, or in other land, including mains, sewers, drains, pipes, lights and cables;
schedule 1 paragraph wrapper2 f (f)works to alter the course of, or otherwise interfere with a watercourse, drainage works, attenuation ponds and temporary culverts;
schedule 1 paragraph wrapper2 g (g)landscaping, works associated with the provision of ecological mitigation and other works to mitigate any adverse effects of the construction, maintenance or operation of the authorised development;
schedule 1 paragraph wrapper2 h (h)works for the benefit or protection of land, structures, apparatus or equipment affected by the authorised development;
schedule 1 paragraph wrapper2 i (i)works for the purpose of habitat creation;
schedule 1 paragraph wrapper2 j (j)the felling, planting and maintenance of trees and hedgerows; and
schedule 1 paragraph wrapper2 k (k)such other works as may be necessary or expedient for the purposes of, or for purposes associated with or ancillary to, the construction, operation or maintenance of the authorised development.
PART 2Ancillary works
schedule 1 part 2 paragraph 1 1. Works within the Order limits which fall within the scope of the work assessed by the environmental statement comprising works for the benefit or protection of land affected by the authorised development.