ID badges: Hide | Show

SCHEDULE CALCULATION OF FEES

PART 3Tables of Fees

TABLE 1

FEES FOR APPEALS IN RESPECT OF APPLICATIONS FOR PLANNING PERMISSION AND APPLICATIONS FOR APPROVAL, CONSENT OR AGREEMENT REQUIRED BY A CONDITION IMPOSED ON A GRANT OF PLANNING PERMISSION IN PRINCIPLE

Category of developmentFee payable
RESIDENTIAL DEVELOPMENT
(a)

Where the number of dwellinghouses to be created by the development does not exceed 10, £286 for each dwellinghouse,

(b)

Where the number of dwellinghouses to be created by the development is fewer than 50, £286 for each of the first 10 dwellinghouses, and £214 for each dwellinghouse thereafter,

(c)

Where the number of dwellinghouses to be created by the development is 50 or more, £286 for each of the first 10 dwellinghouses, £214 for each dwellinghouse in excess of 10 up to 49 dwellinghouses, and £119 for each dwellinghouse in excess of 50, subject to a maximum total of £71,424 .

New dwellings
1. Construction of buildings, structures or erections for use as residential accommodation (other than development within categories 2 to 6).
Existing dwellingsWhere the application relates to—
2. The carrying out of operations which will result in the enlargement, improvement or other alteration of an existing dwelling.
(a)

one dwelling, £143,

(b)

2 or more dwellings, £286.

3.
(a)

The carrying out of operations, including the erection of a building within the curtilage of an existing dwellinghouse, for purposes ancillary to the enjoyment of the dwellinghouse as such, or

£143.
(b)

the erection or construction of gates, fences, walls or other means of enclosure along a boundary of the curtilage of an existing dwellinghouse.

£143.
NON-RESIDENTIAL BUILDINGS
4. The construction of buildings, structures or erections including extensions (other than construction within categories 1, 5, and 6).
(a)

Where no floor area is created or the gross floor space created does not exceed 50 square metres, £143,

(b)

Where the gross floor space created exceeds 50 square metres, £286 in respect of any gross floor space up to 100 square metres,

(c)

Where the gross floor space exceeds 100 square metres, £286 plus £286 per 100 square metres in respect of any gross floor space exceeding 100 square metres and up to 4,000 square metres,

(d)

Where the gross floor space exceeds 4,000 square metres, £11,440 plus £143 per 100 square metres in respect of any gross floor space exceeding 4,000 square metres, subject to a maximum of £71,424,

(e)

Where no buildings are to be created, £286 per 0.1 hectare of site area, subject to a maximum of £71,424.

Agricultural buildings
5. The erection, on land used for the purposes of agriculture, of buildings to be used for agricultural purposes (other than buildings in category 6).
(a)

Where the ground area to be covered by the development does not exceed 500 square metres, £238,

(b)

Where the ground area to be covered by the development exceeds 500 square metres, £238 plus £238 for each 100 square metres in excess of 500 square metres, subject to a maximum of £11,904.

Glasshouses and polytunnels
6. The erection of glasshouses or polytunnels to be used for agricultural purposes.£48 for each 100 square metres of ground area to be covered by the development subject to a maximum of £2,381.
ENERGY GENERATION
7. The erection of wind turbines and the carrying out of other operations in connection with the construction of the generating station, including the construction or installation of any means of access to the generating station, pipes or other conduits, and overhead lines.
(a)

Where the number of turbines does not exceed 3—

(i)

where none of the turbines have a ground to hub height exceeding 15 metres, £595,

(ii)

where one or more of the turbines has a ground to hub height exceeding 15 metres, but not exceeding 50 metres, £1,190,

(iii)

where one or more of the turbines has a ground to hub height exceeding 50 metres, £2,380.

(b)

Where the number of turbines does exceed 3, £238 for each 0.1 hectare of site area, subject to a maximum of £71,424.

8. The construction of a hydro-electric generating station and the carrying out of any other operations in connection with the construction of the generating station, including the construction or installation of any means of access to the generating station, pipes or other conduits, and overhead lines.£238 for each 0.1 hectare of site area, subject to a maximum of £11,904.
9. The construction of a solar electric generating station and the carrying out of any other operations in connection with the construction of the generating station, including the construction or installation of any means of access to the generating station, pipes or other conduits, and overhead lines.£238 for each 0.1 hectare of site area, subject to a maximum of £11,904.
10. The carrying out of any operations connected with the exploratory drilling for oil or natural gas.
(a)

Where the site area does not exceed 0.1 hectares, £476,

(b)

Where the site area exceeds 0.1 hectares, £476 in respect of the first 0.1 hectares of site area, plus £238 for each 0.1 hectare of site area in excess of 0.1 hectares, subject to a maximum of £71,424.

FISH AND SHELLFISH FARMING
11. The placing or assembly of equipment in any part of any marine waters for the purposes of fish farming.£95 for each 0.1 hectare of the surface area of the marine waters to be used in relation to the placement or assembly of any equipment for the purposes of fish farming and £36 for each 0.1 hectare of the sea bed to be used in relation to such development, subject to a maximum of £11,904.
12. The placing or assembly of equipment in any part of any marine waters for the purposes of shellfish farming.£52 for each 0.1 hectare of the surface area of the marine waters to be used in relation to the placement or assembly of any equipment for the purposes of shellfish farming, subject to a maximum of £11,904.
13. The erection, alteration or replacement of plant or machinery.
(a)

Where the site area does not exceed 5 hectares, £238 for each 0.1 hectare of site area,

(b)

Where the site area exceeds 5 hectares, £11,900 plus £119 for each 0.1 hectare of the site area in excess of 5 hectares, subject to a maximum of £71,424.

14. The construction of car parks, service roads and other means of access on land used for the purposes of a single undertaking, where the development is required for a purpose incidental to the existing use of the land.£238

15. Operations for the winning and working of minerals (not including peat).

(a)

Where the site area does not exceed 0.1 hectare, £476,

(b)

Where the site area exceeds 0.1 hectare, but does not exceed 15 hectares, £476 plus £238 for each 0.1 hectare of the site area in excess of 0.1 hectare,

(c)

Where the site area exceeds 15 hectares, £35,938, plus £119 for each 0.1 hectare of site area in excess of 15 hectares, subject to a maximum of £71,424.

16. Operations for the extraction of peat.
(a)

£238 for each 0.1 hectare of site area, subject to a maximum of £2,857.

17. The carrying out of any operations not coming within any of the above categories.
(a)

Where the site area does not exceed 0.1 hectare, £476,

(b)

Where the site area exceeds 0.1 hectare, but does not exceed 15 hectares, £476 plus £238 for each 1 hectare of the site area in excess of 0.1 hectare,

(c)

Where the site area exceeds 15 hectares, £4,046 plus £119 for each 0.1 hectare of the site area in excess of 15 hectares, subject to a maximum of £71,424.

USE OF LAND
18. The use of land for the disposal of refuse or waste materials or for the deposit of material remaining after minerals have been extracted from land.
(a)

Where the site area does not exceed 0.1 hectare, £476,

(b)

Where the site area exceeds 0.1 hectare, but does not exceed 15 hectares, £476 plus £238 for each 0.1 hectare of the site area in excess of 0.1 hectare,

(c)

Where the site area exceeds 15 hectares, £35,938 plus £119 for each 0.1 hectare of the site area in excess of 15 hectares, subject to a maximum of £71,424.

19. The use of land for the storage of minerals in the open.
(a)

Where the site area does not exceed 0.1 hectare, £476,

(b)

Where the site area exceeds 0.1 hectare, but does not exceed 15 hectares, £476 plus £238 for each 0.1 hectare of the site area in excess of 0.1 hectare,

(c)

Where the site area exceeds 15 hectares, £35,938 plus £119 for each 0.1 hectare of the site area in excess of 15 hectares, subject to a maximum of £71,424.

CHANGE OF USE OF BUILDINGS OR LAND
20. The change of use of a building to use as one or more dwellinghouses.
(a)

Where the number of dwellinghouses to be created by the development does not exceed 10, £286 for each dwellinghouse,

(b)

Where the number of dwellinghouses to be created by the development is fewer than 50, £286 for each of the first 10 dwellinghouses, £214 for each dwellinghouse thereafter,

(c)

Where the number of dwellinghouses to be created by the development is 50 or more, £286 for each of the first 10 dwellinghouses, £214 for each dwellinghouse in excess of 10 up to 49 dwellinghouses, and £119 for each dwellinghouse in excess of 50, subject to a maximum of £71, 424.

21. A material change in the use of a building (other than a change of use referred to in category 20).
(a)

Where the gross floor space does not exceed 100 square metres, £286,

(b)

Where the gross floor space exceeds 100 square metres, £286 plus £286 per 100 square metres up to 4,000 square metres,

(c)

Where the gross floor space exceeds 4,000 square metres, £11,440 plus £143 per 100 square metres in respect of any gross floor space exceeding 4,000 square metres, subject to a maximum of £71,424.

22. A material change in the use of land (other than—

(a)

a change of use within category 21, or

(b)

a change of use within categories 18 or 19, or

(c)

a change in the use of equipment placed or assembled in marine waters for the purposes of fish farming or shellfish farming).

£238 per 0.1 hectare of site area subject to a maximum of £2,381.

TABLE 2

FEES FOR APPEALS IN RESPECT OF APPLICATIONS FOR PLANNING PERMISSION IN PRINCIPLE

Category of developmentFee payable
RESIDENTIAL DEVELOPMENT
New dwellings
1. Construction of buildings, structures or erections for use as residential accommodation.
(a)

Where only one dwellinghouse is to be created, £286,

(b)

Where more than one dwellinghouse is to be created and the site area does not exceed 2.5 hectares, £286 for each 0.1 hectare of the site area,

(c)

Where more than one dwellinghouse is to be created and site area exceeds 2.5 hectares, £286 for each 0.1 hectare up to 2.5 hectares of the site area, and then £143 for each 0.1 hectare in excess of 2.5 hectares, subject to a maximum of £35,712.

NON-RESIDENTIAL BUILDINGS
2. The construction of buildings, structures or erections including extensions.£286 for each 0.1 hectare up to 2.5 hectares of the site area, and then £143 for each 0.1 hectare in excess of 2.5 hectares, subject to a maximum of £35,712.

TABLE 3

FEES FOR APPEALS IN RESPECT OF APPLICATIONS FOR A CERTIFICATE OF LAWFUL USE OR DEVELOPMENT UNDER SECTION 150 OR A CERTIFICATE OF PROPOSED USE OR DEVELOPMENT UNDER SECTION 151 OF THE ACT

Category of developmentFee payable
CERTIFICATES OF LAWFULNESS OF EXISTING USE OR DEVELOPMENT
1. An appeal in respect of an application under section 150(1)(a) or (b) of the Act (or both as the case may be).The amount that would be payable in respect of an application for planning permission to institute the use or carry out the operations specified in the application (or an application to do both, as the case may be).
2. An appeal in respect of an application under section 150(1)(c) of the Act.£143.
CERTIFICATES OF LAWFULNESS FOR PROPOSED USE OR DEVELOPMENT
3. An appeal in respect of an application under section 151(1) of the Act (apart from one within category 4).Half the amount that would be payable in respect of an application for planning permission to institute the use or carry out the operations specified in the application (or an application to do both, as the case may be).
4. An appeal in respect of an application under section 151(1)(a) where the use specified is use as one or more separate dwellinghouses.£286 for each dwellinghouse, subject to a maximum of £71,424.

TABLE 4

FEES IN RELATION TO APPLICATIONS FOR APPROVAL UNDER THE GENERAL PERMITTED DEVELOPMENT ORDER

Category of developmentFee payable
1. An appeal in respect of an application made for approval of the planning authority required in relation to development under schedule 1 of the General Permitted Development Order (other than one within categories 2 to 9).£83.
2. An appeal in respect of an application made by virtue of paragraph (4A) of Class 18 of Part 6 (agricultural buildings and operations) of schedule 1 of the General Permitted Development Order.No fee.
3. An appeal in respect of an application made by virtue of paragraph (4) of Class 18B of Part 6 (agricultural buildings and operations) of schedule 1 of the General Permitted Development Order.£248.
4. An appeal in respect of an application made by virtue of paragraph (5) of Class 18C of Part 6 (agricultural buildings and operations) of schedule 1 of the General Permitted Development Order.£248.
5. An appeal in respect of an application made by virtue of paragraph (4) of Class 21A of Part 6A (fish farming) of schedule 1 of the General Permitted Development Order.£310.
6. An appeal in respect of an application made by virtue of paragraph (4) of Class 22A of Part 7 (forestry buildings and operations) of schedule 1 of the General Permitted Development Order.£248.
7. An appeal in respect of an application made by virtue of paragraph (4) of Class 22 of Part 7 (forestry buildings and operations) of schedule 1 of the General Permitted Development Order.No fee.
8. An appeal in respect of an application made by virtue of paragraph (5) of Class 22B of Part 7 (forestry buildings and operations) of schedule 1 of the General Permitted Development Order.£248.
9. An appeal in respect of an application made by virtue of sub-paragraph (23) of Class 67 of Part 20 (development by electronic communications code operators) of schedule 1 of the General Permitted Development Order.£310.