SCHEDULES
Article 49
SCHEDULE 16DOCUMENTS TO BE CERTIFIED
PART 1DOCUMENTS FORMING PART OF THE ENVIRONMENTAL STATEMENT TO BE CERTIFIED
(1) Document Reference | (2) Examination Library Reference | (3) Document Name | (4) Version | (5) Date |
---|---|---|---|---|
6.2.1 | REP6-119 | Environmental Statement – Volume 2 Chapter 1 Introduction | B | 01 August 2024 |
6.2.2 | REP6-141 | Environmental Statement – Volume 2 Chapter 2 Policy and Legislative context | B | 01 August 2024 |
6.2.3 | REP6-163 | Environmental Statement – Volume 2 Chapter 3 - Alternatives | B | 01 August 2024 |
6.2.4 | REP6-172 | Environmental Statement – Volume 2 Chapter 4 The Proposed Development | B | 01 August 2024 |
6.2.5 | REP6-173 | Environmental Statement – Volume 2 Chapter 5 Approach to the Environmental Impact Assessment | B | 01 August 2024 |
6.2.6 | REP6-175 | Environmental Statement – Volume 2 Chapter 6 Coastal processes | B | 01 August 2024 |
6.2.7 | REP6-177 | Environmental Statement – Volume 2 Chapter 7 Other marine users | B | 01 August 2024 |
6.2.8 | REP6-179 | Environmental Statement – Volume 2 Chapter 8 Fish and shellfish ecology | C | 01 August 2024 |
6.2.9 | REP6-181 | Environmental Statement – Volume 2 Chapter 9 Benthic, subtidal and intertidal ecology | D | 01 August 2024 |
6.2.10 | REP6-121 | Environmental Statement – Volume 2 Chapter 10 Commercial fisheries | B | 01 August 2024 |
6.2.11 | Post-examination | Environmental Statement – Volume 2 Chapter 11 Marine mammals (clean) | F | December 2024 |
6.2.12 | REP6-125 | Environmental Statement – Volume 2 Chapter 12 Offshore and intertidal ornithology | B | 01 August 2024 |
6.2.13 | REP6-127 | Environmental Statement – Volume 2 Chapter 13 Shipping and navigation | B | 01 August 2024 |
6.2.14 | REP6-129 | Environmental Statement – Volume 2 Chapter 14 Civil and military aviation | B | 01 August 2024 |
6.2.15 | REP6-131 | Environmental Statement – Volume 2 Chapter 15 Seascape, landscape and visual impact assessment | B | 01 August 2024 |
6.2.16 | REP6-133 | Environmental Statement – Volume 2 Chapter 16 Marine archaeology | C | 01 August 2024 |
6.2.17 | REP6-135 | Environmental Statement – Volume 2 Chapter 17 Socioeconomics | B | 01 August 2024 |
6.2.18 | REP6-137 | Environmental Statement – Volume 2 Chapter 18 Landscape and visual impact | C | 01 August 2024 |
6.2.19 | REP6-139 | Environmental Statement – Volume 2 Chapter 19 Air quality | B | 01 August 2024 |
6.2.20 | REP6-143 | Environmental Statement – Volume 2 Chapter 20 Soils and agriculture | B | 01 August 2024 |
6.2.21 | REP6-145 | Environmental Statement – Volume 2 Chapter 21 Noise and vibration (clean) | C | 01 August 2024 |
6.2.22 | REP6-147 | Environmental Statement – Volume 2 Chapter 22 Terrestrial ecology and nature conservation | D | 01 August 2024 |
6.2.23 | REP6-149 | Environmental Statement – Volume 2 Chapter 23 Transport | B | 01 August 2024 |
6.2.24 | REP6-151 | Environmental Statement – Volume 2 Chapter 24 Ground conditions | B | 01 August 2024 |
6.2.25 | REP6-153 | Environmental Statement – Volume 2 Chapter 25 Historic environment (clean) | D | 01 August 2024 |
6.2.26 | REP6-155 | Environmental Statement – Volume 2 Chapter 26 Water environment | B | 01 August 2024 |
6.2.27 | REP6-157 | Environmental Statement – Volume 2 Chapter 27 Major accidents and disasters | B | 01 August 2024 |
6.2.28 | REP6-159 | Environmental Statement – Volume 2 Chapter 28 Population and human health | B | 01 August 2024 |
6.2.29 | REP6-161 | Environmental Statement – Volume 2 Chapter 29 Climate change | B | 01 August 2024 |
6.2.30 | REP6-165 | Environmental Statement – Volume 2 Chapter 30 Inter-related effects | B | 01 August 2024 |
6.2.31 | REP6-167 | Environmental Statement – Volume 2 Chapter 31 Summary | B | 01 August 2024 |
6.2.32 | REP6-169 | Environmental Statement – Volume 2 Chapter 32 ES Addendum | C | 01 August 2024 |
6.3.1 | APP-073 | Environmental Statement – Volume 3 Chapter 1 Introduction - Figures | A | 08 August 2023 |
6.3.1.1 | APP-073 | Rampion 2 ES Volume Figure 1.1 Proposed DCO Order limits | A | 08 August 2023 |
6.3.2 | APP-074 | Environmental Statement – Volume 3 Chapter 2 Policy and legislative context – figures | A | 08 August 2023 |
6.3.3 | REP6-190 | Environmental Statement – Volume 3 Chapter 3 Alternative – figures | B | 01 August 2024 |
6.3.4 | APP-076 | Environmental Statement – Volume 3 Chapter 4 The Proposed Development – Figures (Part 1 of 2) | A | 08 August 2023 |
6.3.4 | APP-077 | Environmental Statement – Volume 3 Chapter 4 The Proposed Development – Figures (Part 2 of 2) | A | 08 August 2023 |
6.3.5 | APP-078 | Environmental Statement – Volume 3 Chapter 5 Approach to the Environmental Impact Assessment (EIA) – Figures | A | 08 August 2023 |
6.3.6 | APP-079 | Environmental Statement – Volume 3 Chapter 6 Coastal processes – figures | A | 08 August 2023 |
6.3.7 | APP-080 | Environmental Statement – Volume 3 Chapter 7 Other marine users – figures | A | 08 August 2023 |
6.3.8 | REP6-191 | Environmental Statement – Volume 3 Chapter 8 Fish and shellfish – Figures | C | 01 August 2024 |
6.3.9 | REP2-010 | Environmental Statement – Volume 3 Chapter 9 Benthic, subtidal and intertidal ecology - figures | B | 20 March 2024 |
6.3.10 | APP-083 | Environmental Statement – Volume 3 Chapter 10 Commercial fisheries – figures | A | 08 August 2023 |
6.3.11 | APP-084 | Environmental Statement – Volume 3 Chapter 11 Marine Mammals - figures | A | 08 August 2023 |
6.3.12 | APP-085 | Environmental Statement – Volume 3 Chapter 12 Offshore and intertidal ornithology – figures | A | 08 August 2023 |
6.3.13 | APP-086 | Environmental Statement – Volume 3 Chapter 13 Shipping and navigation – figures | A | 08 August 2023 |
6.3.14 | APP-087 | Environmental Statement – Volume 3 Chapter 14 Civil and military aviation study area – figures | A | 08 August 2023 |
6.3.15 | APP-088 | Environmental Statement – Volume 3 Chapter 15 Seascape, landscape and visual impact assessment – figures (Part 1 of 8) | A | 08 August 2023 |
6.3.15 | APP-089 | Environmental Statement – Volume 3 Chapter 15 Seascape, landscape and visual impact assessment – figures (Part 2 of 8) | A | 08 August 2023 |
6.3.15 | APP-090 | Environmental Statement – Volume 3 Chapter 15 Seascape, landscape and visual impact assessment – figures (Part 3 of 8) | A | 08 August 2023 |
6.3.15 | APP-091 | Environmental Statement – Volume 3 Chapter 15 Seascape, landscape and visual impact assessment – figures (Part 4 of 8) | A | 08 August 2023 |
6.3.15 | APP-092 | Environmental Statement – Volume 3 Chapter 15 Seascape, landscape and visual impact assessment – figures (Part 5 of 8) | A | 08 August 2023 |
6.3.15 | APP-093 | Environmental Statement – Volume 3 Chapter 15 Seascape, landscape and visual impact assessment – figures (Part 6 of 8) | A | 08 August 2023 |
6.3.15 | APP-094 | Environmental Statement – Volume 3 Chapter 15 Seascape, landscape and visual impact assessment – figures (Part 7 of 8) | A | 08 August 2023 |
6.3.15 | APP-095 | Environmental Statement – Volume 3 Chapter 15 Seascape, landscape and visual impact assessment – figures (Part 8 of 8) | A | 08 August 2023 |
6.3.16 | APP-096 | Environmental Statement – Volume 3 Chapter 16 Marine archaeology – figures | A | 08 August 2023 |
6.3.17 | APP-097 | Environmental Statement – Volume 3 Chapter 17 Socioeconomics - figures | A | 08 August 2023 |
6.3.18 | REP6-184 | Environmental Statement – Volume 3 Chapter 18 landscape and visual impact assessment – figures (Part 1 of 6) | D | 01 August 2024 |
6.3.18 | REP6-185 | Environmental Statement – Volume 3 Chapter 18 landscape and visual impact assessment – figures (Part 2 of 6) | D | 01 August 2024 |
6.3.18 | REP6-183 | Environmental Statement – Volume 3 Chapter 18 landscape and visual impact assessment – figures (Part 3 of 6) | C | 01 August 2024 |
6.3.18 | REP6-186 | Environmental Statement – Volume 3 Chapter 18 landscape and visual impact assessment – figures (Part 4 of 6) | D | 01 August 2024 |
6.3.18 | REP6-187 | Environmental Statement – Volume 3 Chapter 18 landscape and visual impact assessment – figures (Part 5 of 6) | B | 01 August 2024 |
6.3.18 | REP6-188 | Environmental Statement – Volume 3 Chapter 18 landscape and visual impact assessment – figures (Part 6 of 6) | D | 01 August 2024 |
6.3.19 | APP-104 | Environmental Statement – Volume 3 Chapter 19 Air quality – figures | A | 08 August 2023 |
6.3.20 | APP-105 | Environmental Statement – Volume 3 Chapter 20 Soils and agriculture – figures | A | 08 August 2023 |
6.3.21 | PEPD-022 | Environmental Statement – Volume 3 Chapter 21 Noise and vibration – figures | B | 16 January 2024 |
6.3.23 | APP-107 | Environmental Statement – Volume 3 Chapter 23 Transport – figures (Part 1 of 4) | A | 08 August 2023 |
6.3.23 | APP-108 | Environmental Statement – Volume 3 Chapter 23 Transport – figures (Part 2 of 4) | A | 08 August 2023 |
6.3.23 | APP-109 | Environmental Statement – Volume 3 Chapter 23 Transport – figures (Part 3 of 4) | A | 08 August 2023 |
6.3.23 | APP-110 | Environmental Statement – Volume 3 Chapter 23 Transport – figures (Part 4 of 4) | A | 08 August 2023 |
6.3.24 | APP-111 | Environmental Statement – Volume 3 Chapter 24 Ground conditions – figures | A | 08 August 2023 |
6.3.25 | APP-112 | Environmental Statement – Volume 3 Chapter 25 Historic environment – figures (Part 1 of 5) | A | 08 August 2023 |
6.3.25 | APP-113 | Environmental Statement – Volume 3 Chapter 25 Historic environment – figures (Part 2 of 5) | A | 08 August 2023 |
6.3.25 | REP4-031 | Environmental Statement – Volume 3 Chapter 25 Historic environment – figures (Part 3 of 5) | B | 03 June 2024 |
6.3.25 | REP6-189 | Environmental Statement – Volume 3 Chapter 25 Historic environment – figures (Part 4 of 5) | C | 01 August 2024 |
6.3.25 | APP-116 | Environmental Statement – Volume 3 Chapter 25 Historic environment – figures (Part 5 of 5) | A | 08 August 2023 |
6.3.26 | APP-117 | Environmental Statement – Volume 3 Chapter 26 Water Environment – figures (Part 1 of 2) | A | 08 August 2023 |
6.3.26 | APP-118 | Environmental Statement – Volume 3 Chapter 26 Water Environment – figures (Part 2 of 2) | A | 08 August 2023 |
6.3.28 | APP-119 | Environmental Statement – Volume 3 Chapter 28 Population and human health – figures | A | 08 August 2023 |
6.4.1.1 | APP-120 | Environmental Statement – Volume 4 Appendix 1.1 Competent experts | A | 08 August 2023 |
6.4.3.1 | APP-121 | Environmental Statement – Volume 4 Appendix 3.1 Supporting information | A | 08 August 2023 |
6.4.4.1 | APP-122 | Environmental Statement – Volume 4 Appendix 4.1 Crossing schedule | A | 08 August 2023 |
6.4.4.2 | APP-123 | Environmental Statement – Volume 4 Appendix 4.1 Crossing schedule | A | 08 August 2023 |
6.4.4.3 | TBC | Environmental Statement – Volume 4 Appendix 4.3 Proposed Development parameters | B | 01 August 2024 |
6.4.5.1 | APP-125 | Environmental Statement – Volume 4 Appendix 5.1 Planning Inspectorate’s scoping opinion | A | 08 August 2023 |
6.4.5.2 | APP-126 | Environmental Statement – Volume 4 Appendix 5.2 Response to the Scoping Opinion | A | 08 August 2023 |
6.4.5.3 | APP-127 | Environmental Statement – Volume 4 Appendix 5.3 Cumulative effects assessment detailed onshore search and screening criteria | A | 08 August 2023 |
6.4.5.4 | APP-128 | Environmental Statement – Volume 4 Appendix 5.4 Cumulative effects assessment shortlisted developments | A | 08 August 2023 |
6.4.6.1 | APP-129 | Environmental Statement – Volume 4 Appendix 6.1 Coastal processes technical report baseline description | A | 08 August 2023 |
6.4.6.2 | APP-130 | Environmental Statement – Volume 4 Appendix 6.2 Coastal processes model design and validation | A | 08 August 2023 |
6.4.6.3 | REP5-044 | Environmental Statement – Volume 4 Appendix 6.3 Coastal processes technical report impact assessment | B | 09 July 2024 |
6.4.8.1 | APP-132 | Environmental Statement – Volume 4 Appendix 8.1 Herring annual heatmaps | A | 08 August 2023 |
6.4.8.2 | APP-133 | Environmental Statement – Volume 4 Appendix 8.2 Black bream nests | A | 08 August 2023 |
6.4.8.3 | REP2-011 | Environmental Statement – Volume 4 Appendix 8.3 Underwater noise study for sea bream disturbance | B | 20 March 2024 |
6.4.8.4 | PEPD-023 | Environmental Statement – Volume 4 Appendix 8.4 Black seabream underwater noise technical note and survey results – Revision A | A | 16 January 2024 |
6.4.9.1 | APP-135 | Environmental Statement – Volume 4 Appendix 9.1 Predictive seabed mapping methods reports | A | 08 August 2023 |
6.4.9.2 | APP-136 | Environmental Statement – Volume 4 Appendix 9.2 Offshore wind farm intertidal habitats survey report | A | 08 August 2023 |
6.4.9.3 | APP-137 | Environmental Statement – Volume 4 Appendix 9.3 Rampion 2 Offshore wind farm subtidal benthic characterisation survey report | A | 08 August 2023 |
6.4.9.4 | APP-138 | Environmental Statement – Volume 4 Appendix 9.4 Geophysical survey Part 1 of 7 | A | 08 August 2023 |
6.4.9.4 | APP-139 | Environmental Statement – Volume 4 Appendix 9.4 Geophysical survey Part 2 of 7 | A | 08 August 2023 |
6.4.9.4 | APP-140 | Environmental Statement – Volume 4 Appendix 9.4 Geophysical survey Part 3 of 7 | A | 08 August 2023 |
6.4.9.4 | APP-141 | Environmental Statement – Volume 4 Appendix 9.4 Geophysical survey Part 4 of 7 | A | 08 August 2023 |
6.4.9.4 | APP-142 | Environmental Statement – Volume 4 Appendix 9.4 Geophysical survey Part 5 of 7 | A | 08 August 2023 |
6.4.9.4 | APP-143 | Environmental Statement – Volume 4 Appendix 9.4 Geophysical survey Part 6 of 7 | A | 08 August 2023 |
6.4.9.4 | APP-144 | Environmental Statement – Volume 4 Appendix 9.4 Geophysical survey Part 7 of 7 | A | 08 August 2023 |
6.4.9.5 | APP-145 | Rampion 2 ES Volume 4 Appendix 9.5 Technical Note Cable corridor area mitigation for sensitive features | A | 08 August 2023 |
6.4.10.1 | APP-146 | Environmental Statement – Volume 4 Appendix 10.1 Commercial fisheries technical baseline report | A | 08 August 2023 |
6.4.11.1 | APP-147 | Environmental Statement – Volume 4 Appendix 11.1 Marine mammal baseline technical report | A | 08 August 2023 |
6.4.11.2 | APP-148 | Environmental Statement – Volume 4 Appendix 11.2 Marine mammal quantitative underwater noise impact assessment | A | 08 August 2023 |
6.4.11.3 | REP5-046 | Environmental Statement – Volume 4 Appendix 11.3 Underwater noise assessment technical report | B | 09 July 2024 |
6.4.11.4 | Post-examination | Environmental Statement – Volume 4 Appendix 11.4 Bottlenose Dolphin Population Modelling | B | October 2024 |
6.4.12.1 | APP-150 | Environmental Statement – Volume 4 Appendix 12.1 Offshore and intertidal ornithology baseline technical report | A | 08 August 2023 |
6.4.12.2 | APP-151 | Environmental Statement – Volume 4 Appendix 12.2 Offshore and intertidal ornithology displacement analysis | A | 08 August 2023 |
6.4.12.3 | APP-152 | Environmental Statement – Volume 4 Appendix 12.3 Offshore and intertidal ornithology collision risk modelling | A | 08 August 2023 |
6.4.12.4 | APP-153 | Environmental Statement – Volume 4 Appendix 12.4 Offshore and intertidal ornithology migratory collision risk modelling | A | 08 August 2023 |
6.4.12.5 | APP-154 | Environmental Statement – Volume 4 Appendix 12.5 Offshore and intertidal ornithology population viability analysis | A | 08 August 2023 |
8.25 | REP4-065 | Environmental Statement – Volume 4 Appendix 8 In-combination Assessment update for Guillemot and Razorbill | B | 3 June 2024 |
6.4.12.6 | REP6-193 | Environmental Statement – Volume 4 Appendix 12.6 Great Black-backed gull Cumulative assessment and PVA | A | 01 August 2024 |
6.4.13.1 | APP-155 | Environmental Statement – Volume 4 Appendix 13.1 Navigational risk assessment | A | 08 August 2023 |
6.4.14.1 | APP-156 | Environmental Statement – Volume 4 Appendix 14.1 Airspace analysis and radar modelling | A | 08 August 2023 |
6.4.15.1 | APP-157 | Environmental Statement – Volume 4 Appendix 15.1 Seascape, landscape and visual impact assessment consultation responses | A | 08 August 2023 |
6.4.15.2 | APP-158 | Environmental Statement – Volume 4 Appendix 15.2 Seascape, landscape and visual impact assessment methodology | A | 08 August 2023 |
6.4.15.3 | APP-159 | Environmental Statement – Volume 4 Appendix 15.3 Simple seascape, landscape and visual impact assessment | A | 08 August 2023 |
6.4.15.4 | APP-160 | Environmental Statement – Volume 4 Appendix 15.4 Viewpoint assessment | A | 08 August 2023 |
6.4.15.5 | APP-161 | Environmental Statement – Volume 4 Appendix 15.5 Assessment of aviation and navigation night-time lighting | A | 08 August 2023 |
6.4.15.6 | PEPD-024 | Environmental Statement – Volume 4 Appendix 15.6 Supplementary night-time viewpoint assessment | A | 16 January 2024 |
6.4.16.1 | REP3-017 | Environmental Statement – Volume 4 Appendix 16.1 Marine archaeology technical report | B | 25 April 2024 |
6.4.17.1 | APP-163 | Environmental Statement – Volume 4 Appendix 17.1 Socioeconomics method statement | A | 08 August 2023 |
6.4.17.2 | APP-164 | Environmental Statement – Volume 4 Appendix 17.2 Socioeconomics cost and sourcing report | A | 08 August 2023 |
6.4.17.3 | APP-165 | Environmental Statement – Volume 4 Appendix 17.3 Socioeconomics technical baseline | A | 08 August 2023 |
6.4.17.4 | APP-166 | Environmental Statement – Volume 4 Appendix 17.4 Assessment of sensitivity of public rights of way | A | 08 August 2023 |
6.4.18.1 | APP-167 | Environmental Statement – Volume 4 Appendix 18.1 Landscapes and visual impact assessment methodology | A | 08 August 2023 |
6.4.18.2 | REP6-194 | Environmental Statement – Volume 4 Appendix 18.2 Viewpoint analysis | D | 01 August 2024 |
6.4.18.3 | REP6-196 | Environmental Statement – Volume 4 Appendix 18.3 Landscape assessment | C | 01 August 2024 |
6.4.18.4 | REP6-198 | Environmental Statement – Volume 4 Appendix 18.4 Visual assessment | C | 01 August 2024 |
6.4.18.5 | REP6-200 | Environmental Statement – Volume 4 Appendix 18.5 Residential visual amenity assessment | C | 01 August 2024 |
6.4.18.6 | REP4-035 | Environmental Statement – Volume 4 Appendix 18.6 Viewpoint directory | B | 03 June 2024 |
6.4.19.1 | APP-173 | Environmental Statement – Volume 4 Appendix 19.1 Full results of construction road traffic modelling | A | 08 August 2023 |
6.4.19.2 | APP-174 | Environmental Statement – Volume 4 Appendix 19.2 Full results of construction plant modelling | A | 08 August 2023 |
6.4.20.1 | APP-175 | Environmental Statement – Volume 4 Appendix 20.1 Detailed agricultural land classification report | A | 08 August 2023 |
6.4.21.1 | PEPD-025 | Environmental Statement – Volume 4 Appendix 21.1 Baseline sound report (clean) | B | 16 January 2024 |
6.4.21.2 | PEPD-027 | Environmental Statement – Volume 4 Appendix 21.2 Construction plant list (clean) | B | 16 January 2024 |
6.4.21.3 | APP-178 | Environmental Statement – Volume 4 Appendix 21.3 Preliminary operational noise predictions | A | 08 August 2023 |
6.4.22.1 | APP-179 | Environmental Statement – Volume 4 Appendix 22.1 Policy and legislation tables | A | 08 August 2023 |
6.4.22.2 | APP-180 | Environmental Statement – Volume 4 Appendix 22.2 Terrestrial ecology desk study | A | 08 August 2023 |
6.4.22.3 | APP-181 | Environmental Statement – Volume 4 Appendix 22.3 Extended phase 1 habitat survey report | A | 08 August 2023 |
6.4.22.4 | APP-182 | Environmental Statement – Volume 4 Appendix 22.4 National vegetation classification survey report 2021-2022 | A | 08 August 2023 |
6.4.22.5 | APP-183 | Environmental Statement – Volume 4 Appendix 22.5 Hedgerow survey report | A | 08 August 2023 |
6.4.22.6 | APP-184 | Environmental Statement – Volume 4 Appendix 22.6 Fisheries habitat survey report | A | 08 August 2023 |
6.4.22.7 | APP-185 | Environmental Statement – Volume 4 Appendix 22.7 Great crested newt environmental DNA survey report 2021 – 2023 | A | 08 August 2023 |
6.4.22.8 | APP-186 | Environmental Statement – Volume 4 Appendix 22.8 Passive and active bat activity report | A | 08 August 2023 |
6.4.22.9 | APP-187 | Environmental Statement – Volume 4 Appendix 22.9 Hazel dormouse report 2020 – 2022 | A | 08 August 2023 |
6.4.22.10 | APP-188 | Environmental Statement – Volume 4 Appendix 22.10 Invertebrate survey report | A | 08 August 2023 |
6.4.22.11 | APP-189 | Environmental Statement – Volume 4 Appendix 22.11 Badger, otter and water vole survey reports (NON-CONFIDENTIAL) | A | 08 August 2023 |
6.4.22.12 | APP-190 | Environmental Statement – Volume 4 Appendix 22.12 Reptile survey | A | 08 August 2023 |
6.4.22.13 | APP-191 | Environmental Statement – Volume 4 Appendix 22.13 Breeding bird survey | A | 08 August 2023 |
6.4.22.14 | APP-192 | Environmental Statement – Volume 4 Appendix 22.14 Onshore winter bird report 2020 – 2022 | A | 08 August 2023 |
6.4.22.15 | REP6-204 | Environmental Statement – Volume 4 Appendix 22.15 Biodiversity net gain information | D | 01 August 2024 |
6.4.22.16 | REP5-058 | Environmental Statement – Volume 4 Appendix 22.16 Arboricultural impact assessment | C | 09 July 2024 |
6.4.22.17 | APP-195 | Environmental Statement – Volume 4 Appendix 22.17 Bat tree ground level visual assessment survey report | A | 08 August 2023 |
6.4.22.18 | PEPD-029 | Environmental Statement – Volume 4 Appendix 22.18 Passive and active bat activity report 2023 | A | 16 January 2024 |
6.4.22.19 | PEPD-030 | Environmental Statement – Volume 4 Appendix 22.19 Hazel dormouse report 2023 | A | 16 January 2024 |
6.4.23.1 | REP6-206 | Environmental Statement – Volume 4 Appendix 23.1 Abnormal indivisible loads assessment | B | 01 August 2024 |
6.4.23.2 | REP6-208 | Environmental Statement – Volume 4 Appendix 23.2 Traffic generation technical note (clean) | E | 01 August 2024 |
6.4.24.1 | APP-198 | Environmental Statement – Volume 4 Appendix 24.1 Phase 1 geo-environmental desk study | A | 08 August 2023 |
6.4.25.1 | APP-199 | Environmental Statement – Volume 4 Appendix 25.1 Gazetteer of 14 Onshore heritage assets | A | 08 August 2023 |
6.4.25.2 | APP-200 | Environmental Statement – Volume 4 Appendix 25.2 Onshore historic environment desk study Part 1 of 2 | A | 08 August 2023 |
6.4.25.2 | APP-201 | Environmental Statement – Volume 4 Appendix 25.2 Onshore historic environment desk study Part 2 of 2 | A | 08 August 2023 |
6.4.25.3 | APP-202 | Environmental Statement – Volume 4 Appendix 25.3 Onshore desk-based geoarchaeological and paleoenvironmental assessment report | A | 08 August 2023 |
6.4.25.4 | PEPD-031 | Environmental Statement – Volume 4 Appendix 25.4 Onshore geophysical survey report Part 1 of 8 (clean) | B | 16 January 2024 |
6.4.25.4 | PEPD-113 | Environmental Statement – Volume 4 Appendix 25.4 Onshore geophysical survey report Part 2 of 8 | B | 16 January 2024 |
6.4.25.4 | PEPD-114 | Environmental Statement – Volume 4 Appendix 25.4 Onshore geophysical survey report Part 3 of 8 | B | 16 January 2024 |
6.4.25.4 | PEPD-115 | Environmental Statement – Volume 4 Appendix 25.4 Onshore geophysical survey report Part 4 of 8 | B | 16 January 2024 |
6.4.25.4 | PEPD-116 | Environmental Statement – Volume 4 Appendix 25.4 Onshore geophysical survey report Part 5 of 8 | B | 16 January 2024 |
6.4.25.4 | PEPD-117 | Environmental Statement – Volume 4 Appendix 25.4 Onshore geophysical survey report Part 6 of 8 | B | 16 January 2024 |
6.4.25.4 | PEPD-118 | Environmental Statement – Volume 4 Appendix 25.4 Onshore geophysical survey report Part 7 of 8 | B | 16 January 2024 |
6.4.25.4 | PEPD-119 | Environmental Statement – Volume 4 Appendix 25.4 Onshore geophysical survey report Part 8 of 8 Revision B (Clean) | B | 16 January 2024 |
6.4.25.5 | APP-211 | Environmental Statement – Volume 4 Appendix 25.5 Oakendene parkland historic landscape assessment | A | 08 August 2023 |
6.4.25.6 | APP-212 | Environmental Statement – Volume 4 Appendix 25.6 Archaeological trial trenching at Brook Barn Farm | A | 08 August 2023 |
6.4.25.7 | APP-213 | Environmental Statement – Volume 4 Appendix 25.7 Settings assessment scoping report | A | 08 August 2023 |
6.4.25.8 | APP-214 | Environmental Statement – Volume 4 Appendix 25.8 Onshore heritage asset baseline report | A | 08 August 2023 |
6.4.26.1 | APP-215 | Environmental Statement – Volume 4 Appendix 26.1 Detailed water environment baseline information | A | 08 August 2023 |
6.4.26.2 | REP4-039 | Environmental Statement – Volume 4 Appendix 26.2 Flood risk assessment | B | 03 June 2024 |
6.4.26.3 | APP-217 | Environmental Statement – Volume 4 Appendix 26.3 Water framework directive compliance assessment | A | 08 August 2023 |
6.4.26.4 | APP-218 | Environmental Statement – Volume 4 Appendix 26.4 Hydrological risk assessment | A | 08 August 2023 |
6.4.28.1 | APP-219 | Environmental Statement – Volume 4 Appendix 28.1 Human health baseline | A | 08 August 2023 |
6.4.28.2 | APP-220 | Environmental Statement – Volume 4 Appendix 28.2 Electro magnetic field health evidence base | A | 08 August 2023 |
6.4.28.3 | APP-221 | Environmental Statement – Volume 4 Appendix 28.3 Equalities impact assessment | A | 08 August 2023 |
6.4.29.1 | APP-222 | Environmental Statement – Volume 4 Appendix 29.1 Supporting data for the green house green assessment | A | 08 August 2023 |
PART 2OTHER DOCUMENTS TO BE CERTIFIED
(1) Document Reference | (2) Examination Library Reference | (3) Document Name | (4) Version | (5) Date |
---|---|---|---|---|
2.1.2 | AS-025 | Land plans onshore | C | 18 July 2024 |
2.2.1 | PEPD-004 | Offshore works plans | B | 16 January 2024 |
2.2.2 | AS-026 | Onshore works plans | C | 18 July 2024 |
2.4 | AS-027 | Special category land plans | C | 18 July 2024 |
2.5 | REP6-004 | Access rights of way and streets plan | C | 01 August 2024 |
2.6 | REP6-005 | Tree preservation order and hedgerow plan | F | 01 August 2024 |
2.7 | APP-014 | Open access land plan | A | 08 August 2023 |
2.11 | APP-018 | Offshore Order limits and grid co-ordinates plan | A | 08 August 2023 |
4.3 | REP6-016 | Book of reference | D | 01 August 2024 |
5.8 | REP5-023 | Design and access statement | C | 09 July 2024 |
7.1 | REP5-062 | Outline operational drainage plan | D | 09 July 2024 |
7.2 | REP6-224 | Outline code of construction practice | G | 01 August 2024 |
7.3 | APP-225 | Outline site waste management plan | A | 08 August 2023 |
7.4 | REP5-066 | Outline soils management plan | C | 09 July 2024 |
7.5 | APP-227 | Outline operational travel plan | A | 08 August 2023 |
7.6 | REP6-231 | Outline construction traffic management plan | G | 01 August 2024 |
7.7 | REP3-031 | Outline onshore construction workforce travel plan | B | 25 April 2024 |
7.8 | REP3-033 | Outline public rights of way management plan (clean) | B | 25 April 2024 |
7.9 | REP5-070 | Outline onshore written scheme of investigation | C | 09 July 2024 |
7.10 | REP6-212 | Outline landscape and ecology management plan | E | 01 August 2024 |
7.11 | REP6-214 | Outline project environmental management plan | C | 01 August 2024 |
7.12 | REP5-074 | Outline scour protection and cable protection plan | C | 09 July 2024 |
7.13 | REP6-216 | Outline marine written scheme of investigation | D | 01 August 2024 |
7.14 | REP6-218 | Draft piling marine mammal mitigation protocol | C | 01 August 2024 |
7.15 | REP5-078 | Draft UXO marine mammal mitigation protocol | B | 09 July 2024 |
7.16 | REP5-080 | Outline offshore operations and maintenance plan | C | 09 July 2024 |
7.17 | Post-examination | In-principle sensitive features mitigation plan | F | December 2024 |
7.18 | Post-examination | Offshore in-principle monitoring plan | F | December 2024 |
7.19 | REP6-222 | Outline fisheries liaison and co-existence plan (clean) | C | 01 August 2024 |
7.20 | APP-242 | Outline diver communications plan | A | 08 August 2023 |
7.21 | APP-243 | Evidence plan (Part 1 of 11) | A | 08 August 2023 |
7.21 | APP-244 | Evidence plan (Part 2 of 11) | A | 08 August 2023 |
7.21 | APP-245 | Evidence plan (Part 3 of 11) | A | 08 August 2023 |
7.21 | APP-246 | Evidence plan (Part 4 of 11) | A | 08 August 2023 |
7.21 | APP-247 | Evidence plan (Part 5 of 11) | A | 08 August 2023 |
7.21 | APP-248 | Evidence plan (Part 6 of 11) | A | 08 August 2023 |
7.21 | APP-249 | Evidence plan (Part 7 of 11) | A | 08 August 2023 |
7.21 | APP-250 | Evidence plan (Part 8 of 11) | A | 08 August 2023 |
7.21 | APP-251 | Evidence plan (Part 9 of 11) | A | 08 August 2023 |
7.21 | APP-252 | Evidence plan (Part 10 of 11) | A | 08 August 2023 |
7.21 | APP-253 | Evidence plan (Part 11 of 11) | A | 08 August 2023 |
7.22 | REP6-226 | Commitments register | F | 01 August 2024 |
7.23 | REP6-229 | Outline construction method statement | C | 01 August 2024 |
7.24 | PEPD-037 | Outline skills and employment strategy | B | 16 January 2024 |
8.86 | REP5-124 | Outline construction communication plan | A | 09 July 2024 |
8.87 | REP6-269 | Outline vegetation retention and removal plan | C | 01 August 2024 |
8.88 | REP5-126 | Outline cable specification and installation plan | A | 09 July 2024 |
8.85 | REP5-123 | Outline cable burial risk assessment | A | 09 July 2024 |
8.105 | REP6-236 | Horsham District mitigation and enhancement principles document | A | 01 August 2024 |
8.106 | REP6-237 | National Park enhancement and furtherance principles document | A | 01 August 2024 |
8.95 | REP6-273 | Public rights of way and landscape enhancement principles document | B | 01 August 2024 |
8.25.10 | REP1-028 | Appendix 10 – Further information for Action Point 42 – Proximity to marine wildlife | A | 28 February 2024 |
8.60 | REP5-111 | Outline noise and vibration management plan | B | 09 July 2024 |
8.62 | REP6-258 | Outline air quality management plan | C | 01 August 2024 |
8.64 | REP5-115 | Kittiwake implementation and monitoring plan | B | July 2024 |
8.89 | REP6-271 | Guillemot and Razorbill Implementation and Monitoring Plan | B | August 2024 |
Post-examination | Outline spawning herring piling restriction plan | 1.0 | 12 November 2024 |