SCHEDULES

SCHEDULE 1AUTHORISED PROJECT

PART 3REQUIREMENTS

Detailed design approval – extension to National Grid substation

schedule 1 paragraph 9 9.—(1) Works comprising Work No. 20 (excluding onshore site preparation works) must not commence until details of—

schedule 1 paragraph 9 1 a (a)siting and layout;

schedule 1 paragraph 9 1 b (b)scale and quantum of development and its uses;

schedule 1 paragraph 9 1 c (c)existing and proposed finished ground levels;

schedule 1 paragraph 9 1 d (d)landscaping;

schedule 1 paragraph 9 1 e (e)access; and

schedule 1 paragraph 9 1 f (f)external appearance, form and materials for any buildings structures and other infrastructure including boundary treatment,

of the extension to the National Grid substation at Bolney have been submitted to and approved in writing by the relevant planning authority in consultation with the highway authority and Work No. 20 must be carried out in accordance with the approved details.

(2) Any details provided by the undertaker pursuant to sub-paragraph (1) must accord with the principles set out in the relevant part of the design and access statement unless otherwise agreed with the relevant planning authority, take account of climate change allowances, accord with the drainage arrangements approved pursuant to requirement 17, and be within the Order limits.

(3) To the extent comprised in Work No. 20—

schedule 1 paragraph 9 3 a (a)there must be no more than two buildings;

schedule 1 paragraph 9 3 b (b)operational buildings must be no more than no more than 12 metres in height above finished ground level;

schedule 1 paragraph 9 3 c (c)the maximum height of any associated infrastructure must be no more than 12 metres in height above finished ground level;

schedule 1 paragraph 9 3 d (d)the maximum building length must be no more than 35 metres;

schedule 1 paragraph 9 3 e (e)the maximum building width must be no more than 20 metres; and

schedule 1 paragraph 9 3 f (f)the maximum height of any other infrastructure must be no more than 12 metres.

(4) For the purposes of paragraph (3) “finished ground level” will be defined in accordance with the design and access statement.