SCHEDULES
SCHEDULE 8PROTECTIVE PROVISIONS
PART 6FOR THE PROTECTION OF LOCAL HIGHWAY AUTHORITIES
Construction of the specified works
schedule 8 paragraph 58 58. The specified works must be carried out by the undertaker to the reasonable satisfaction of the relevant highway authority in accordance with—
schedule 8 paragraph 58 a (a)the relevant detailed design information approved by the relevant highway authority under paragraph 55 or as subsequently varied by agreement between the undertaker and the relevant highway authority;
schedule 8 paragraph 58 b (b)the DMRB, the specification for highway works, together with all other relevant standards as required by the relevant highway authority to include, inter alia, all relevant interim advice notes, the Traffic Signs Manual and the Traffic Signs Regulations and General Directions 2016(1) save to the extent that exceptions from those standards apply which have been approved by the relevant highway authority; and
schedule 8 paragraph 58 c (c)all aspects of the Construction (Design and Management) Regulations 2015(2) or any statutory amendment or variation of the same and in particular the undertaker, as client, must ensure that all client duties (as defined in the said regulations) are undertaken to the reasonable satisfaction of the relevant highway authority.