ID badges: Hide | Show

SCHEDULES

SCHEDULE 2REQUIREMENTS

PART 2REQUIREMENTS PERTAINING TO CONSTRUCTION

Surface and foul water drainage

schedule 2 paragraph 13 13.—(1) No part of the authorised development may commence until for that part written details of a surface and foul water drainage plan, including means of pollution control and monitoring, have been submitted and approved in writing by the relevant planning authority following consultation with the Environment Agency, the lead local flood authority and the relevant water and sewerage undertakers.

(2) The details submitted under sub-paragraph (1) must be in accordance with the drainage principles set out in the design principles, and must include—

schedule 2 paragraph 13 2 a (a)the specification for the surface and foul water drainage plant, including performance specifications for discharge levels in accordance with paragraph 7.5-7.7 of the drainage design statement;

schedule 2 paragraph 13 2 b (b)details on the means on long-term monitoring to be carried out; and

schedule 2 paragraph 13 2 c (c)details on the mitigation measures to be implemented if the performance specifications referred to in sub-paragraph (a) are not met.

(3) The authorised development must be carried out in accordance with the details approved under sub-paragraph (1).

term surface and foul water drainage plant (4) In paragraph 13(2), “surface and foul water drainage plant” means the surface and foul water drainage plant to be constructed under Work Nos. 4d and 4v, or any other water treatment plant, drainage system and its treatment and discharge, and any other related works to be constructed under the terms of this Order.