SCHEDULES
SCHEDULE 1AUTHORISED DEVELOPMENT
Terminal and associated works
Work No. 3a(01) — Within the area of land shown on the Works Plans as Work No. 3a(01), the construction of a new Pier C to Terminal 1 (T1) accessible from existing Pier B to be built on two levels including the construction of an external canopy from the southern end of the new pier.
Work No. 3a(02) — Within the area of land shown on the Works Plans as Work No. 3a(02), works to extend the existing T1 building to its northern side at ground floor level to increase the size of the immigration area.
Work No. 3a(03) — Within the area of land shown on the Works Plans as Work No. 3a(03), works to extend the southern area of existing T1 on two levels to accommodate increased security and check-in facilities at ground floor level and to increase the area of the departure lounge at first floor level.
Work No. 3a(04) — Within the area of land shown on the Works Plans as Work No. 3a(04), works to extend the northern area of the existing T1 at first floor level over the existing airside road system to increase the area of the departure lounge.
Work No. 3a(05) — Within the area of land shown on the Works Plans as Work No. 3a(05), works to expand the area of the existing baggage hall within T1.
Work No. 3b(01) — Within the area of land shown on the Works Plans as Work No. 3b(01), the construction of an airport terminal building (T2) to include provision for landside access by light train system (Work No. 3g), a new road system (Works Nos. 6b and 6c), a pedestrian plaza (Work No. 3f) in direct contact with a new apron (Work No. 2a). The terminal buildings to include provision for—
(a)building superstructure;
(b)check-in hall;
(c)passenger security screening;
(d)baggage handling system;
(e)departure lounge;
(f)immigration and customs facilities;
(g)food kiosks, cafes, restaurants and retail units;
(h)support accommodation and operational areas for terminal management and welfare facilities for airport staff; and
(i)waste handling facilities.
Work No. 3b(02) — Within the area of land shown on the Works Plans as Work No. 3b(02), the construction of an extension to T2 (Work No. 3b(01) in direct contact with Works Nos. 2a and 2b. To include—
(a)expansion of passenger and baggage handling facilities;
(b)localised internal remodelling; and
(c)additional food kiosks, cafes, restaurants, retail and welfare facilities.
Work No. 3c(01) — Within the area of land shown on the Works Plans as Work No. 3c(01), the construction of a pier, connected to the new T2 building (Work No. 3b(01)) and the new apron (Work No. 2a), to serve up to 14 aircraft stands. To include—
(a)construction of piled foundations;
(b)vehicle and pedestrian access routes and parking areas;
(c)vertical circulation nodes to each aircraft stand each with a fixed link bridge connection from pier at upper level; and
(d)bridge connection from pier to T2.
Work No. 3c(02) — Within the area of land shown on the Works Plans as Work No. 3c(02), the construction of a pier, connected to the new T2 building (Work No. 3b(02)) and the new apron (Work No. 2b), to serve up to 14 aircraft stands. To include—
(a)construction of piled foundations;
(b)vehicle and pedestrian access routes and parking areas;
(c)vertical circulation nodes to each aircraft stand each with a fixed link bridge connection from pier at upper level; and
(d)two storey bridge connection from pier to T2.
Work No. 3d — Within the area of land shown on the Works Plans as Work No. 3d, the construction of a new coach station to connect with airport operational roads (Work No. 6c(02)). To include—
(a)drainage works;
(b)construction of a canopy;
(c)hard and soft landscaping;
(d)wayfinding features; and
(e)fixtures, fittings and equipment.
Work No. 3e(01) — Within the area of land shown on the Works Plans as Work No. 3e(01), the construction of a passenger drop off zone to connect with airport operational roads (Work No. 6c). To include—
(a)drainage works;
(b)hard and soft landscaping; and
(c)parking entry and exit gates, internal roads and parking areas.
Work No. 3e(02) — Within the area of land shown on the Works Plans as Work No. 3e(02), the construction of a passenger drop off zone to connect with airport operational roads (Work No. 6c). To include—
(a)drainage works;
(b)road access security features;
(c)hard and soft landscaping; and
(d)parking entry and exit gates, internal roads and parking areas.
Work No. 3f — Within the area of land described shown on the Works Plans as Work No. 3f, the construction of a pedestrianised plaza to the landside part of T2 (Work No. 3b(01)). To include—
(a)drainage works;
(b)security features and structures;
(c)hard and soft landscaping;
(d)wayfinding features; and
(e)street furniture and lighting.
Work No. 3g — Within the area of land shown on the Works Plans as Work No. 3g, the extension of the Luton DART light rail system connecting T1 with the T2 along with the construction of a new Luton DART station at T2. To include—
(a)construction of a tunnel;
(b)construction of T2 station box;
(c)T2 station fit out works; and
(d)modifications to T1 Station, including platform screen doors and relocation of transport system maintenance area to T2 station.
Work No. 3h — Within the area of land shown on the Works Plans as Work No. 3h, the construction of buildings and other infrastructure supporting the function and operation of T2. To include—
(a)service yard including loading bays and segregated waste bailing/compaction/storage;
(b)hard and soft landscaping;
(c)safeguarded parking zone; and
(d)energy centre, centralised facility for T2 heating and cooling plant outside the operational envelope of the terminal.
Work No. 3i —Within the area of land shown on the Works Plans as Work No. 3i, the construction of airport operations and maintenance buildings supporting the airport including but not limited to a security gatehouse, airside operations facility, ground support equipment maintenance area and airside vehicle maintenance area. To include—
(a)drainage system;
(b)hard and soft landscaping;
(c)external vehicle/pedestrian access and circulation work;
(d)security systems, including boundary fencing;
(e)warehouse type buildings;
(f)internal workshops, management and welfare facilities;
(g)controlled access operational parking; and
(h)loading bays.