Articles 33, 35 and 36

SCHEDULE 10LAND IN WHICH ONLY SUBSOIL OR NEW RIGHTS IN AND ABOVE SUBSOIL AND SURFACE MAY BE ACQUIRED

term the level of the surface of the land In this Schedule, “the level of the surface of the land” means—

schedule 10 paragraph a (a)in the case of any land on which a building is erected, the level of the surface of the ground adjoining the building;

schedule 10 paragraph b (b)in the case of a river (except in the case of the river Thames as provided in sub-paragraph (c)), dock, canal, navigation, watercourse or other water area, the level of the surface of the ground covered by water;

schedule 10 paragraph c (c)in the case of the river Thames comprised in plots 15-10, 15-11, 15-12, 16-42 and 16-43, the level of Ordnance Datum Newlyn; or

schedule 10 paragraph d (d)in any other case, ground surface level,

at the time of this Order coming into force.

(1)

Plot Reference Number shown on land plans

(2)

Depth of subsoil beneath the level of the surface of the land

(3)

Purpose for which the subsoil and new rights and restrictive covenants are required

13-3814 metresAcquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works.
13-4113 metresAcquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works.
13-4614 metresAcquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works.
13-4714 metresAcquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works.
13-4814 metresAcquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works ; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works.
13-5016 metresAcquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works.
14-04, 14-07, 14-08, 14-09, 14-10, 14-12, 14-13 and 14-141 metreAcquisition of subsoil and rights (including restrictive covenants) for provision of a directional drill pipe from construction compound.
14-057 metresAcquisition of subsoil and rights (including restrictive covenants) for provision of a directional drill pipe from construction compound.
14-064 metresAcquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and construction of a new permanent ground protection tunnel and access shafts to undertake ground treatment works above the new A122 Lower Thames Crossing tunnel.
14-119 metresAcquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; construction of a new permanent ground protection tunnel and access shafts to undertake ground treatment works above the new A122 Lower Thames Crossing tunnel; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works.
14-1511 metresAcquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and construction of a new permanent ground protection tunnel and access shafts to undertake ground treatment works above the new A122 Lower Thames Crossing tunnel.
14-16, 14-17 and 14-189 metresAcquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; construction of a new permanent ground protection tunnel and access shafts to undertake ground treatment works above the new A122 Lower Thames Crossing tunnel; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works.
15-1027 metresAcquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works.
15-11 and 15-1223 metresAcquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works.
15-1323 metresAcquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works.
15-14 and 15-153 metresAcquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works.
15-1623 metresAcquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works.
15-17 and 15-1820 metresAcquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and construction of a new permanent ground protection tunnel and access shafts to undertake ground treatment works above the new A122 Lower Thames Crossing tunnel.
15-1919 metresAcquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and construction of a new permanent ground protection tunnel and access shafts to undertake ground treatment works above the new A122 Lower Thames Crossing tunnel.
15-2018 metresAcquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and construction of a new permanent ground protection tunnel and access shafts to undertake ground treatment works above the new A122 Lower Thames Crossing tunnel.
16-4213 metresAcquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works.
16-4321 metresAcquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works.
16-707 metresAcquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works.