At the junction of the proposed waste water treatment plant access (Work No. 2) with the B1047 Horningsea Road | No right turn from the proposed waste water treatment plant new site access onto the B1047 Horningsea Road northbound at the point shown with a pink circle on sheet 3 of the access and traffic regulation order plans (Document number 4.7.3 as described in column (2) of Schedule 18) | From the date upon which Work No. 2 becomes the operational access to the proposed waste water treatment plant |
At the junction of the proposed waste water treatment plant access (Work No. 2) with the B1047 Horningsea Road | No left turn for HGVs into the proposed waste water treatment plant access from the B1047 Horningsea Road southbound at the point shown with a pink circle on sheet 3 of the access and traffic regulation order plans (Document number 4.7.3 as described in column (2) of Schedule 18) | From the date upon which Work No. 2 becomes the operational access to the proposed waste water treatment plant |
At the junction of the proposed waste water treatment plant access (Work No. 2) with the B1047 Horningsea Road | No right turn into the proposed waste water treatment plant access from the B1047 Horningsea Road northbound at the point shown with a pink circle on sheet 3 of the access and traffic regulation order plans (Document number 4.7.3 as described in column (2) of Schedule 18) | From the date upon which Work No. 2 becomes the operational access to the proposed waste water treatment plant |