SCHEDULES
SCHEDULE 15PROTECTIVE PROVISIONS
PART 6FOR THE PROTECTION OF LOCAL HIGHWAY AUTHORITIES
Submissions of Drawings
schedule 15 paragraph 105 105.—(1) The undertaker must supply electronic versions of the drawings and all other information required.
(2) All plans shall be at a true scale of no less than 1:500 and the construction specification drawings shall be at a scale of 1:20.
(3) The undertaker shall provide the local highway authority with the following minimum information for the specified works—
schedule 15 paragraph 105 3 a (a)The extent of the specified works within the public highway (coloured as below) at a true scale of not less than 1:200—
schedule 15 paragraph 105 3 a i (i)specified works within existing public highway shall be coloured green (the shade of green shall conform to Hue 80, Saturation 117, Luminance 131 (#58BC4A Hex number));
schedule 15 paragraph 105 3 a ii (ii)if any land is to be offered for adoption by the local highway authority then such areas shall be coloured in pink (the shade of pink shall conform to Hue 223, Saturation 205, Luminance 208 (#F6AAE4 Hex number)); and
schedule 15 paragraph 105 3 a iii (iii)gullies, connections to the publicly maintained surface water sewer and any lengths of highway drain shall be marked blue;
schedule 15 paragraph 105 3 b (b)the proposed longitudinal and cross sections;
schedule 15 paragraph 105 3 c (c)the proposed layout of the street lighting;
schedule 15 paragraph 105 3 d (d)the construction drawings for the specified works;
schedule 15 paragraph 105 3 e (e)a plan showing the areas drained by each gully within the area of the specified works and such plan shall—
schedule 15 paragraph 105 3 e i (i)identify the areas drained by varying the direction of a simple 45° line hatching;
schedule 15 paragraph 105 3 e ii (ii)show the areas drained by each gully in numbers;
schedule 15 paragraph 105 3 e iii (iii)show the direction and fall to the gully expressed as a factor of 1 (i.e. 1:150); and
schedule 15 paragraph 105 3 e iv (iv)identify the level of the high point and gully;
schedule 15 paragraph 105 3 f (f)a plan showing the proposed surface course material using different hatches or colours to differentiate between the materials being proposed;
schedule 15 paragraph 105 3 g (g)a plan showing all kerbing and edging types to be used;
schedule 15 paragraph 105 3 h (h)a copy of the geo-technical report for the site and the design California bearing ratios for the foundation must comply with the requirements of the Housing Estate Road Construction Specification;
schedule 15 paragraph 105 3 i (i)general arrangement drawing showing location and nature of utilities/ statutory undertakers’ apparatus; and
schedule 15 paragraph 105 3 j (j)all changes to drawings through the technical vetting process must be clouded in red.