ID badges: Hide | Show

SCHEDULES

SCHEDULE 14PARAMETERS

PART 7TERTIARY TREATMENT PLANT (WORK No. 13)

(1) Item(2) Maximum design parameter
Finished ground level (+ or – 0.5m)9.5m AOD
Depth of filtration plant4.5m AOD (5m below FGL)
Foundation depth-15.5m AOD (25m below FGL)
Height of filtration plant19.5m AOD (10m above FGL)
Ferric dosing plant area20m x 12m
Ferric dosing plant: height17m AOD (7.5m above FGL)
Overall footprint of tertiary treatment plant60m x 40m