SCHEDULES
SCHEDULE 14PARAMETERS
PART 4PRIMARY SETTLEMENT TANKS (WORK No. 6)
(1) Item | (2) Maximum design parameter |
---|---|
Finished ground level (+ or – 0.5m) | 9.5m AOD |
Total surface area of circular or rectangular primary settlement tanks | 6,451m2 |
Number of primary settlement tanks | 6 No. |
Depth | 1.5m AOD (8m below FGL) |
Foundations | Piles to a depth of -15.5m AOD (25m below FGL) |
Height | 15.5m AOD (6m above FGL) |
Overall footprint of primary settlement tanks area | 175m x 115m |
Ferric dosing plant area including kiosk | 20m x 5m |
Ferric dosing plant: height | 14.5m AOD (5m above FGL) |