SCHEDULE 14PARAMETERS
PART 18BUILDINGS AND OTHER FACILITIES (WORK Nos. 3, 7, 19 and FURTHER WORKS)
(1) Item | (2) Main parameters | (3) Maximum height |
---|---|---|
Gateway building (Work No. 19) | 58.2m x 17.1m | 18.5m AOD (9m above FGL) Piled foundations to a depth of -15.5m AOD (25m below FGL) |
Workshop building (Work No. 7) | 55m x 16m | 19.5m AOD (10m above FGL) Piled foundations to a depth of -15.5m AOD (25m below FGL) |
District Network Operator (DNO) enclosure (Work No. 19) | 5m x 10m | 12.5m AOD (3m above FGL) |
Vehicle parking (Work Nos. 3, 7 and Further Works) | 4,000m2 | N/A |
56 staff (including LGVs); 7 HGVs; 3 trailers; 12 visitor vehicle parking spaces (including two disabled spaces); 1 visitor coach parking space Provision for 50 bicycles |