SCHEDULES
Article 28
SCHEDULE 10LAND IN WHICH ONLY NEW RIGHTS ETC MAY BE ACQUIRED
(1) Number of plot shown on land plans | (2) Purpose for which rights may be acquired and restrictive covenants may be imposed |
---|---|
012c, 012i, 012j, 012k, 012l, 014a, 021a, 021o, 021q, 021v, 021w, 022h, 022i, 036e, 036f, 038d | Waste Water Treatment Plant Permanent Access Rights All rights necessary for the purposes of or incidental to the construction, installation, operation, protection, repair and maintenance of the authorised development to pass and re-pass on foot, with or without vehicles, plant, machinery, apparatus, equipment, materials, contractors and personnel (including to lay any surface) at all reasonable times (and in an emergency at any time). |
012j, 014a, 021a, 021j, 021m, 021o, 022i, 026a, 029a, 039c, 042d, 044d, 047d, 050a, 056d | Waterbeach Pipeline Permanent Access Rights All rights necessary for the purposes of or incidental to the construction, installation, operation, protection, repair and maintenance of that part of the authorised development comprised in Work Nos. 33, 34, 35 and 36 (collectively referred to as the ‘Waterbeach Pipeline’) to pass and re-pass on foot, with or without vehicles, plant, machinery, apparatus, equipment, materials, contractors and personnel (including to lay any surface) at all reasonable times (and in an emergency at any time). |
005d, 005e, 005f, 005g, 008b, 008c, 008e, 008g, 012b, 012c, 012d, 012e, 012f, 012g, 012i, 012k, 012l, 013b, 013d, 013j, 013l, 015b, 015d, 017b, 018b, 019e, 020c, 021d, 022e, 027b, 027d, 027e, 028a, 031d, 032b, 032d, 032e, 032f, 034d, 036c, 036e, 039a, 042a, 044a, 046a, 046b, 047a, 051a, 052a, 053a, 054a, 055a, 056a, 057a, 058a, 059a, 060a, 060b, 061a, 062a, 063a, 064a, 065a, 066a, 068a, 069a, 070b, 071b, 071c, 071d, 072a, 072b, 074c | Waterbeach Pipeline Rights All rights necessary for the purposes of or incidental to the construction, installation, operation, protection, repair and maintenance of that part of the authorised development comprised in Work Nos. 33, 34, 35 and 36 (collectively referred to as the ‘Waterbeach Pipeline’) including to— install, connect, retain, use, maintain, inspect, alter, adjust, remove, refurbish, repair, reconstruct, replace, improve, test, commission, cleanse, protect, manage, remove, decommission or render unusable, underground pipelines, and other associated infrastructure including but not limited to Accessories as defined in section 219(1) (general interpretation) of the Water Industry Act 1991, access chambers, shafts, pipework fittings and fixtures, tunnels, air valves, manholes, marker posts, telemetry infrastructure, communication and control infrastructure, monitoring apparatus, signage, and any other works as necessary; permit the free flow and passage of foul water and other material through the Waterbeach Pipeline; decommission redundant infrastructure; enter, and be on the land and remain with or without plant, vehicles, machinery, apparatus and equipment for all purposes in connection with the authorised development; pass and re-pass with or without vehicles, plant machinery, apparatus, equipment and materials (and to lay any surface) for all purposes in connection with the authorised development; break up the surface of the land, make all necessary excavations (including using horizontal directional drilling technique or open cut trenching) and to carry out reinstatement works; carry out diversion works to existing utilities, to alter or relocate existing utilities connections and to make new utilities connections; cross existing infrastructure including the A14, Horningsea Road, Fen Road, the river Cam, the King’s Lynn railway line and drainage ditches, including through techniques such as pipe-jacking or horizontal directional drilling technique; carry out mud and soil handling, ground re-profiling and vegetation clearance; carry out dewatering, temporary construction, commission drainage, restoration of existing land drainage and discharge into any drain or watercourse; store and stockpile materials (including excavated material); erect, create and remove fencing and secure works compounds including temporary drilling and tunnelling compounds, drilling launch and exit pits, welfare, storage and laydown areas, temporary haul roads, and working areas; place, construct, use and remove plant, machinery and temporary structures in, on or over the land including any necessary temporary bridging of water courses including bailey bridges; support the Waterbeach Pipeline from the subjacent and adjacent land and soil including minerals of the owner; effect permanent or temporary access to the highway; make such investigations in or on the land as required and to take samples of any materials; lay out temporary accesses for public use; erect and maintain markers indicating the position and extent of the construction area or the position of the Waterbeach Pipeline; execute and thereafter use, inspect, maintain, adjust, alter, renew, repair, test and cleanse within the land such works as may be reasonably necessary to provide appropriate drainage due to the Waterbeach Pipeline together with a right to enter on to the land for the purposes of exercising the rights; locate, install and inspect chambers, air valves or manholes within or on the land; remove fences or walls within the land during any period during which construction, maintenance, repair or renewal is being carried out (subject to erection of any temporary stock-proof fencing as is reasonably required and the re-instating of the original fences or walls following the exercise of the rights); install, execute, implement, retain, repair, improve, renew, relocate, maintain and carry out mitigation, maintenance, remediation, environmental or ecological mitigation works, including temporary works; install, execute, implement, retain, repair, improve, renew, remove, relocate, fell, trim, lop or plant trees, bushes, woodlands, shrubs, hedgerows, seeding and other ecological measures together with the right to maintain, inspect, and replant such tree, shrubs and landscaping; carry out such works or ancillary works required by a planning permission and/or consent now or to be granted over the land, or in accordance with any necessary licences, including but not limited to water abstraction, water discharge, protected species and/or wildlife; and carry out any Further Works as defined in Schedule 1 of this Order. |
005d, 005e, 005f, 005g, 008b, 008c, 008e, 008g, 012b, 012c, 012d, 012e, 012f, 012g, 012i, 012k, 012l, 013b, 013d, 013j, 013l, 015b, 015d, 017b, 018b, 019e, 020c, 021d, 022e, 027b, 027d, 027e, 028a, 031d, 032b, 032d, 032e, 032f, 034d, 036c, 036e, 039a, 042a, 044a, 046a, 046b, 047a, 051a, 052a, 053a, 054a, 055a, 056a, 057a, 058a, 059a, 060a, 060b, 061a, 062a, 063a, 064a, 065a, 066a, 068a, 069a, 070b, 071b, 071c, 071d, 072a, 072b, 074c | Waterbeach Pipeline Restrictive Covenant All restrictions necessary over the land to prevent activities which are likely to cause damage or injury to that part of the authorised development comprised in Work Nos. 33, 34, 35 and 36 (collectively referred to as the ‘Waterbeach Pipeline’) or to obstruct, interrupt or interfere with the exercise of the Waterbeach Pipeline Rights, the free flow and passage of foul water or other material through the Waterbeach Pipeline, or render access to it more difficult or expensive, including— the building, construction, erection or installation of any permanent building or structure or any work of any kind requiring foundations, footings or other supporting structures; the withdrawal of lateral or vertical support from the Waterbeach Pipeline; any activities which increase or decrease ground cover or soil levels or change the composition of the land in any manner whatsoever; the undertaking of piling or percussive works, or works of excavation or mining; the planting of trees or shrubs other than shallow rooting shrubs permitted by the undertaker; and the erection, construction, or laying in or upon the land any pipes, wires, cables, conduits, posts, poles, timber, stone or materials or substance (except fences constructed with such gates or openings as may admit of the free exercise of the Waterbeach Pipeline Rights), without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed if the proposed activities, building, erection, construction or works would not cause damage to the relevant part of the authorised development nor make it materially more difficult to access or maintain the authorised development). |
058e | Waterbeach Pipeline Permanent Drainage Rights All rights necessary for the purposes of or incidental to the carrying out of dewatering, temporary construction, commission drainage, restoration of existing land drainage and discharge into any drain or watercourse. |
005f, 005g, 005j, 008b, 008e, 009a, 010a, 011a, 012b, 012e, 012k, 012l, 013b, 013c, 013e, 013h, 013j, 013k, 015b, 015c, 015e, 015f, 016a, 017c, 017d, 018c, 018d, 019c, 019d, 020b, 021f, 021h, 021m, 021n, 021o, 021u, 021w, 022c, 022d, 027b, 027c, 027d, 032b, 032c, 032e, 034c | Transfer Tunnel Restrictive Covenant term the transfer tunnel All restrictions necessary over the land to prevent activities which are likely to cause damage or injury to that part of the authorised development comprised within Work No. 27 (referred to as “the Transfer Tunnel”), or to obstruct, interrupt or interfere with the free flow and passage of foul water or other material through the Transfer Tunnel, or render access to it more difficult or expensive, including— the building, construction, erection or installation of any permanent or temporary building or structure or any work of any kind requiring foundations, footings or other supporting structures; the laying in the land of any pipes, wires, cables or conduits; the withdrawal of lateral or vertical support from the Transfer Tunnel; any activities which increase or decrease ground cover or soil levels or change the composition of the land in any manner whatsoever; and the undertaking of piling or percussive works, or works of excavation or mining, which may not be carried out at any time within a primary restriction zone, but for which the consent in writing of the undertaker may be sought for the carrying out of such activities within a secondary restriction zone (such consent not to be unreasonably withheld or delayed if the proposed activities, building, erection, construction or works would not cause damage to the relevant part of the authorised development). |
034e, 038c | Final Effluent and Storm Pipeline Rights term the final effluent and storm pipeline All rights necessary for the purposes of or incidental to the construction, installation, operation, protection, repair and maintenance of that part of the authorised development comprised within Work No. 31 (referred to as “the Final Effluent and Storm Pipeline”) including to— install, connect, retain, use, maintain, inspect, alter, adjust, remove, refurbish, repair, reconstruct, replace, improve, test, commission, cleanse, protect, manage, remove or render unusable, underground pipelines, and other associated infrastructure including but not limited to Accessories as defined in section 219 of the Water Industry Act 1991, access chambers, manholes, marker posts, telemetry infrastructure, communication and control infrastructure, monitoring apparatus, signage, and any other works as necessary; permit the free flow and passage of final effluent, stormwater and other material through the Final Effluent and Storm Pipeline and to discharge from it into the river Cam; decommission existing redundant infrastructure; enter, and be on the land and remain with or without plant, vehicles, machinery, apparatus and equipment for all purposes in connection with the authorised development; pass and re-pass with or without vehicles, plant machinery, apparatus, equipment and materials (and to lay any surface) for all purposes in connection with the authorised development; break up the surface of the land, make all necessary excavations (including using horizontal directional drilling technique or open cut trenching) and to carry out reinstatement works; carry out mud and soil handling, ground re-profiling and vegetation clearance; carry out dewatering, temporary construction, commission drainage, restoration of existing land drainage and discharge into any drain or watercourse; carry out diversion works to existing utilities, to alter or relocate existing utilities connections and to make new utilities connections; store and stockpile materials (including excavated material); erect, create and remove fencing and secure works compounds including temporary drilling and tunnelling compounds, drilling launch and exit pits, welfare, storage and laydown areas, temporary haul roads, and working areas; place, construct, use and remove plant, machinery and temporary structures in, on or over the land including any necessary temporary bridging of water courses including bailey bridges; support the Final Effluent and Storm Pipeline from the subjacent and adjacent land and soil including minerals of the owner; effect permanent or temporary access to the highway; make such investigations in or on the land as required and to take samples of any materials; lay out temporary accesses for public use; erect and maintain markers indicating the position and extent of the construction area or the position of the Final Effluent and Storm Pipeline; execute and thereafter use, inspect, maintain, adjust, alter, renew, repair, test and cleanse within the land such works as may be reasonably necessary to provide appropriate drainage due to the Final Effluent and Storm Pipeline together with a right to enter on to the land for the purposes of exercising the rights; locate, install and inspect chambers, valves or manholes within or on the land; remove fences or walls within the land during any period during which construction, maintenance, repair or renewal is being carried out (subject to erection of any temporary stock-proof fencing as is reasonably required and the re-instating of the original fences or walls following the exercise of the rights); install, execute, implement, retain, repair, improve, renew, relocate, maintain and carry out mitigation, maintenance, remediation, environmental or ecological mitigation works, including temporary works; install, execute, implement, retain, repair, improve, renew, remove, relocate, fell, trim, lop or plant trees, bushes, woodlands, shrubs, hedgerows, seeding and other ecological measures together with the right to maintain, inspect and replant such tree, shrubs and landscaping; carry out such works or ancillary works required by a planning permission and/or consent now or to be granted over the land, or in accordance with any necessary licences, including but not limited to water abstraction, water discharge, protected species and/or wildlife; and carry out any Further Works as defined in Schedule 1 of this Order. |
034e, 038c | Final Effluent and Storm Pipeline Restrictive Covenant term the final effluent and storm pipeline All restrictions necessary over the land to prevent activities which are likely to cause damage or injury to that part of the authorised development comprised within Work No. 31 (referred to as “the Final Effluent and Storm Pipeline”) or to obstruct, interrupt or interfere with the exercise of the Final Effluent and Storm Pipeline Rights, the free flow and passage of final effluent, stormwater and or other material through the Final Effluent and Storm Pipeline, or render access to it more difficult or expensive, including— the building, construction, erection or installation of any permanent or temporary building or structure or any work of any kind requiring foundations, footings or other supporting structures; the withdrawal of lateral or vertical support from the Final Effluent and Storm Pipeline; any activities which increase or decrease ground cover or soil levels or change the composition of the land in any manner whatsoever; any activities which increase or decrease ground water levels; any activities which obstruct the flows or the discharge of water from the pipelines; the undertaking of piling or percussive works, or works of excavation or mining; the planting of trees or shrubs other than shallow rooting shrubs permitted by the undertaker; and the erection, construction, or laying in or upon the land any pipes, wires, cables, conduits, posts, poles, timber, stone or materials or substance (except fences constructed with such gates or openings as may admit of the free exercise of the Final Effluent and Storm Pipeline Rights), without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed if the proposed activities, building, erection, construction or works would not cause damage to the relevant part of the authorised development nor make it materially more difficult to access or maintain the authorised development). |
001a, 004a, 004b, 004c, 004d, 006c | Rising and Gravity Main Diversion Rights All rights necessary for the purposes of or incidental to the construction, installation, operation, protection, repair and maintenance of that part of the authorised development comprised within Work No. 17 including to— install, connect, retain, use, maintain, inspect, alter, adjust, remove, refurbish, repair, reconstruct, replace, improve, test, commission, cleanse, inspect, maintain, protect, manage, remove or render unusable underground pipelines, rising mains, gravity mains and other associated infrastructure including but not limited to Accessories as defined in section 219 of the Water Industry Act 1991, access chambers, shafts, pipework fittings and fixtures, tunnels, air valves, manholes, marker posts, telemetry infrastructure, communication and control infrastructure, monitoring apparatus, chemical storage and dosing plant, chemical dosing pipework, kiosks, local control panels, CCTV cameras and columns, lightning protection infrastructure, signage, and any other works as necessary; decommission existing redundant infrastructure; enter, and be on the land and remain with or without plant, vehicles, machinery, apparatus and equipment for all purposes in connection with the authorised development; pass and re-pass with or without vehicles, plant machinery, apparatus, equipment and materials (and to lay any surface) for all purposes in connection with the authorised development; break up the surface of the land, make all necessary excavations, and to carry out reinstatement works; carry out diversion works to existing utilities, to alter or relocate existing utilities connections and to make new utilities connections; and carry out any other Further Works as defined in Schedule 1 of this Order. |
019k, 019l, 019n | River Cam rights All rights necessary for the purposes of or incidental to the construction, installation, operation, protection, repair and maintenance of that part of the authorised development comprised within Work No. 32 (Outfall) including to— install, connect, retain, use, maintain, inspect, alter, adjust, remove, refurbish, repair, reconstruct, replace, improve, test, commission, cleanse, inspect, maintain, protect, manage or render unusable underground outfall pipelines, outfall structure, temporary cofferdam, temporary and permanent piling, river bed and embankment reinforcement works, dredging, scour protection measures, and other associated infrastructure including but not limited to Accessories as defined in section 219 of the Water Industry Act 1991, access chambers, pipework fittings and fixtures, air valves, manholes, marker posts, monitoring apparatus and any other works as necessary; enter, and be on the land (which for the avoidance of doubt includes the riverbed and the surface water), and pass and re-pass and remain on the land with or without plant, vehicles (including boats), machinery, apparatus and equipment for all purposes in connection with the authorised development; break up the riverbed, make all necessary excavations, install and retain piling, and carry out reinstatement works; install, execute, implement, retain, repair, improve, renew, relocate, maintain and carry out mitigation, maintenance, remediation, environmental or ecological mitigation works, including temporary works; install, execute, implement, retain, repair, improve, renew, remove, relocate, fell, trim, lop or plant trees, bushes, woodlands, shrubs, hedgerows, seeding and other ecological measures together with the right to maintain, inspect and replant such tree, shrubs and landscaping; carry out such works or ancillary works required by a planning permission and/or consent now or to be granted over the land, or in accordance with any necessary licences, including but not limited to water abstraction, water discharge, protected species and/or wildlife; clear the land from obstructions which may interfere with the waterflow and/or damage or displace the scour protection measures; and carry out any Further Works as defined in Schedule 1 to the Order. |
019k, 019l, 019n | River Cam restrictive covenant term outfall All restrictions necessary over the land to prevent activities which are likely to cause damage or injury to that part of the authorised development comprised within Work No. 32 (referred to as the “Outfall”), or to obstruct, interrupt or interfere with the free flow and passage of final effluent, stormwater and other material through the Final Effluent and Storm Pipeline and its discharge from it into the river Cam; or render access to it more difficult or expensive, including— the building, construction, erection or installation of any permanent or temporary building or structure or any work of any kind; the laying in the land of any pipes, wires, cables or conduits; and the undertaking of piling or percussive works, or works of excavation or mining, without the prior consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed if the proposed activities, building, erection, construction or works would not cause damage to the relevant part of the authorised development). |
002a, 002b, 002c, 003d, 003e, 004a, 004b, 004c, 004d, 005d, 005e, 005f, 005g, 005j, 006b, 006c, 009a, 010a, 011a | Decommissioning Works Rights All rights necessary for the purposes of or incidental to the carrying out of that part of the authorised development comprised in Work No. 40 (the Decommissioning Existing Cambridge waste water treatment works) to cease its existing operational function and to facilitate the surrender of its current operational permits including to— decommission existing redundant infrastructure; remove pumps; isolate plant; isolate, fill and cap pipework; clean tanks, pipes, screens and other structures, plant and machinery; isolate electrical connections; decommission the potable water supply; restrict access to walkways, plant and machinery; enter, and be on the land and remain with or without plant, vehicles, machinery, apparatus and equipment for all purposes in connection with the authorised development; pass and re-pass with or without vehicles, plant machinery, apparatus, equipment and materials (and to lay any surface)for all purposes in connection with the authorised development; break up the surface of the land, make all necessary excavations, and to carry out reinstatement works; carry out diversion works to existing utilities, to alter or relocate existing utilities connections and to make new utilities connections; and carry out any Further Works as defined in Schedule 1 of this Order. |
Section 219 was amended by paragraph 110 of Schedule 17 to the Communications Act 2003 (c. 21). There are other amendments to section 219 which are not relevant to this Order.